FERC FINANCIAL REPORT
|
||
|
These reports are mandatory under the Federal Power Act, Sections 3, 4(a), 304 and 309, and 18 CFR 141.1 and 141.400. Failure to report may result in criminal fines, civil penalties and other sanctions as provided by law. The Federal Energy Regulatory Commission does not consider these reports to be of confidential nature
|
||
|
Exact Legal Name of Respondent (Company) |
Year/Period of Report End of: |
|
Schedules |
Pages |
| Comparative Balance Sheet | 110-113 |
| Statement of Income | 114-117 |
| Statement of Retained Earnings | 118-119 |
| Statement of Cash Flows | 120-121 |
| Notes to Financial Statements | 122-123 |
| FERC FORM NO.
REPORT OF MAJOR ELECTRIC UTILITIES, LICENSEES AND OTHER |
||||
|
IDENTIFICATION |
||||
|
01 Exact Legal Name of Respondent
|
02 Year/ Period of Report
End of: |
|||
|
03 Previous Name and Date of Change (If name changed during year)
/
|
||||
|
04 Address of Principal Office at End of Period (Street, City, State, Zip Code)
|
||||
|
05 Name of Contact Person
|
06 Title of Contact Person
|
|||
|
07 Address of Contact Person (Street, City, State, Zip Code)
|
||||
|
08 Telephone of Contact Person, Including Area Code
|
09 This Report is An Original / A Resubmission
(1)
☑ An Original ☐ A Resubmission |
10 Date of Report (Mo, Da, Yr)
|
||
| Annual Corporate Officer Certification | ||||
| The undersigned officer certifies that: I have examined this report and to the best of my knowledge, information, and belief all statements of fact contained in this report are correct statements of the business affairs of the respondent and the financial statements, and other financial information contained in this report, conform in all material respects to the Uniform System of Accounts. | ||||
|
03 Signature
|
04 Date Signed (Mo, Da, Yr)
|
||
| Title 18, U.S.C. 1001 makes it a crime for any person to knowingly and willingly to make to any Agency or Department of the United States any false, fictitious or fraudulent statements as to any matter within its jurisdiction. | ||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
LIST OF SCHEDULES (Electric Utility) |
|||
|
Enter in column (c) the terms "none," "not applicable," or "NA," as appropriate, where no information or amounts have been reported for certain pages. Omit pages where the respondents are "none," "not applicable," or "NA". |
|||
| Line No. |
Title of Schedule (a) |
Reference Page No. (b) |
Remarks (c) |
|
ScheduleIdentificationAbstract Identification |
1 | ||
|
ScheduleListOfSchedulesAbstract List of Schedules |
2 | ||
|
1 |
ScheduleGeneralInformationAbstract General Information |
101 | |
|
2 |
ScheduleControlOverRespondentAbstract Control Over Respondent |
102 | |
|
3 |
ScheduleCorporationsControlledByRespondentAbstract Corporations Controlled by Respondent |
103 | |
|
4 |
ScheduleOfficersAbstract Officers |
104 | |
|
5 |
ScheduleDirectorsAbstract Directors |
105 | |
|
6 |
ScheduleInformationOnFormulaRatesAbstract Information on Formula Rates |
106 | |
|
7 |
ScheduleImportantChangesDuringTheQuarterYearAbstract Important Changes During the Year |
108 | |
|
8 |
ScheduleComparativeBalanceSheetAbstract Comparative Balance Sheet |
110 | |
|
9 |
ScheduleStatementOfIncomeAbstract Statement of Income for the Year |
114 | |
|
10 |
ScheduleRetainedEarningsAbstract Statement of Retained Earnings for the Year |
118 | |
|
12 |
ScheduleStatementOfCashFlowsAbstract Statement of Cash Flows |
120 | |
|
12 |
ScheduleNotesToFinancialStatementsAbstract Notes to Financial Statements |
122 | |
|
13 |
ScheduleStatementOfAccumulatedOtherComprehensiveIncomeAndHedgingActivitiesAbstract Statement of Accum Other Comp Income, Comp Income, and Hedging Activities |
122a | |
|
14 |
ScheduleSummaryOfUtilityPlantAndAccumulatedProvisionsForDepreciationAmortizationAndDepletionAbstract Summary of Utility Plant & Accumulated Provisions for Dep, Amort & Dep |
200 | |
|
15 |
ScheduleNuclearFuelMaterialsAbstract Nuclear Fuel Materials |
202 | |
|
16 |
ScheduleElectricPlantInServiceAbstract Electric Plant in Service |
204 | |
|
17 |
ScheduleElectricPropertyLeasedToOthersAbstract Electric Plant Leased to Others |
213 | |
|
18 |
ScheduleElectricPlantHeldForFutureUseAbstract Electric Plant Held for Future Use |
214 | |
|
19 |
ScheduleConstructionWorkInProgressElectricAbstract Construction Work in Progress-Electric |
216 | |
|
20 |
ScheduleAccumulatedProvisionForDepreciationOfElectricUtilityPlantAbstract Accumulated Provision for Depreciation of Electric Utility Plant |
219 | |
|
21 |
ScheduleInvestmentsInSubsidiaryCompaniesAbstract Investment of Subsidiary Companies |
224 | |
|
22 |
ScheduleMaterialsAndSuppliesAbstract Materials and Supplies |
227 | |
|
23 |
ScheduleAllowanceInventoryAbstract Allowances |
228 | |
|
24 |
ScheduleExtraordinaryPropertyLossesAbstract Extraordinary Property Losses |
230a | |
|
25 |
ScheduleUnrecoveredPlantAndRegulatoryStudyCostsAbstract Unrecovered Plant and Regulatory Study Costs |
230b | |
|
26 |
ScheduleTransmissionServiceAndGenerationInterconnectionStudyCostsAbstract Transmission Service and Generation Interconnection Study Costs |
231 | |
|
27 |
ScheduleOtherRegulatoryAssetsAbstract Other Regulatory Assets |
232 | |
|
28 |
ScheduleMiscellaneousDeferredDebitsAbstract Miscellaneous Deferred Debits |
233 | |
|
29 |
ScheduleAccumulatedDeferredIncomeTaxesAbstract Accumulated Deferred Income Taxes |
234 | |
|
30 |
ScheduleCapitalStockAbstract Capital Stock |
250 | |
|
31 |
ScheduleOtherPaidInCapitalAbstract Other Paid-in Capital |
253 | |
|
32 |
ScheduleCapitalStockExpenseAbstract Capital Stock Expense |
254b |
|
|
33 |
ScheduleLongTermDebtAbstract Long-Term Debt |
256 | |
|
34 |
ScheduleReconciliationOfReportedNetIncomeWithTaxableIncomeForFederalIncomeTaxesAbstract Reconciliation of Reported Net Income with Taxable Inc for Fed Inc Tax |
261 | |
|
35 |
ScheduleTaxesAccruedPrepaidAndChargedDuringYearDistributionOfTaxesChargedAbstract Taxes Accrued, Prepaid and Charged During the Year |
262 | |
|
36 |
ScheduleAccumulatedDeferredInvestmentTaxCreditsAbstract Accumulated Deferred Investment Tax Credits |
266 | |
|
37 |
ScheduleOtherDeferredCreditsAbstract Other Deferred Credits |
269 | |
|
38 |
ScheduleAccumulatedDeferredIncomeTaxesAcceleratedAmortizationPropertyAbstract Accumulated Deferred Income Taxes-Accelerated Amortization Property |
272 | |
|
39 |
ScheduleAccumulatedDeferredIncomeTaxesOtherPropertyAbstract Accumulated Deferred Income Taxes-Other Property |
274 | |
|
40 |
ScheduleAccumulatedDeferredIncomeTaxesOtherAbstract Accumulated Deferred Income Taxes-Other |
276 | |
|
41 |
ScheduleOtherRegulatoryLiabilitiesAbstract Other Regulatory Liabilities |
278 | |
|
42 |
ScheduleElectricOperatingRevenuesAbstract Electric Operating Revenues |
300 | |
|
43 |
ScheduleRegionalTransmissionServiceRevenuesAbstract Regional Transmission Service Revenues (Account 457.1) |
302 |
|
|
44 |
ScheduleSalesOfElectricityByRateSchedulesAbstract Sales of Electricity by Rate Schedules |
304 | |
|
45 |
ScheduleSalesForResaleAbstract Sales for Resale |
310 | |
|
46 |
ScheduleElectricOperationsAndMaintenanceExpensesAbstract Electric Operation and Maintenance Expenses |
320 | |
|
47 |
SchedulePurchasedPowerAbstract Purchased Power |
326 | |
|
48 |
ScheduleTransmissionOfElectricityForOthersAbstract Transmission of Electricity for Others |
328 | |
|
49 |
ScheduleTransmissionOfElectricityByIsoOrRtoAbstract Transmission of Electricity by ISO/RTOs |
331 |
|
|
50 |
ScheduleTransmissionOfElectricityByOthersAbstract Transmission of Electricity by Others |
332 | |
|
51 |
ScheduleMiscellaneousGeneralExpensesAbstract Miscellaneous General Expenses-Electric |
335 | |
|
52 |
ScheduleDepreciationDepletionAndAmortizationAbstract Depreciation and Amortization of Electric Plant (Account 403, 404, 405) |
336 | |
|
53 |
ScheduleRegulatoryCommissionExpensesAbstract Regulatory Commission Expenses |
350 | |
|
54 |
ScheduleResearchDevelopmentOrDemonstrationExpendituresAbstract Research, Development and Demonstration Activities |
352 | |
|
55 |
ScheduleDistributionOfSalariesAndWagesAbstract Distribution of Salaries and Wages |
354 | |
|
56 |
ScheduleCommonUtilityPlantAndExpensesAbstract Common Utility Plant and Expenses |
356 |
|
|
57 |
ScheduleAmountsIncludedInIsoOrRtoSettlementAbstract Amounts included in ISO/RTO Settlement Statements |
397 | |
|
58 |
SchedulePurchasesSalesOfAncillaryServicesAbstract Purchase and Sale of Ancillary Services |
398 | |
|
59 |
ScheduleMonthlyTransmissionSystemPeakLoadAbstract Monthly Transmission System Peak Load |
400 | |
|
60 |
ScheduleMonthlyIsoOrRtoTransmissionSystemPeakLoadAbstract Monthly ISO/RTO Transmission System Peak Load |
400a | |
|
61 |
ScheduleElectricEnergyAccountAbstract Electric Energy Account |
401a | |
|
62 |
ScheduleMonthlyPeakAndOutputAbstract Monthly Peaks and Output |
401b | |
|
63 |
ScheduleSteamElectricGeneratingPlantStatisticsAbstract Steam Electric Generating Plant Statistics |
402 | |
|
64 |
ScheduleHydroelectricGeneratingPlantStatisticsAbstract Hydroelectric Generating Plant Statistics |
406 | |
|
65 |
SchedulePumpedStorageGeneratingPlantStatisticsAbstract Pumped Storage Generating Plant Statistics |
408 | |
|
66 |
ScheduleGeneratingPlantStatisticsAbstract Generating Plant Statistics Pages |
410 | |
|
66.1 |
ScheduleEnergyStorageOperationsLargePlantsAbstract Energy Storage Operations (Large Plants) |
414 | |
|
66.2 |
ScheduleEnergyStorageOperationsSmallPlantsAbstract Energy Storage Operations (Small Plants) |
419 | |
|
67 |
ScheduleTransmissionLineStatisticsAbstract Transmission Line Statistics Pages |
422 | |
|
68 |
ScheduleTransmissionLinesAddedAbstract Transmission Lines Added During Year |
424 | |
|
69 |
ScheduleSubstationsAbstract Substations |
426 | |
|
70 |
ScheduleTransactionsWithAssociatedAffiliatedCompaniesAbstract Transactions with Associated (Affiliated) Companies |
429 | |
|
71 |
FootnoteDataAbstract Footnote Data |
450 | |
|
StockholdersReportsAbstract Stockholders' Reports (check appropriate box) |
|||
|
Stockholders' Reports Check appropriate box:
☑ Two copies will be submitted ☐ No annual report to stockholders is prepared |
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
GENERAL INFORMATION |
|||
|
1. Provide name and title of officer having custody of the general corporate books of account and address of office where the general corporate books are kept, and address of office where any other corporate books of account are kept, if different from that where the general corporate books are kept.
|
|||
|
2. Provide the name of the State under the laws of which respondent is incorporated, and date of incorporation. If incorporated under a special law, give reference to such law. If not incorporated, state that fact and give the type of organization and the date organized.
|
|||
|
3. If at any time during the year the property of respondent was held by a receiver or trustee, give (a) name of receiver or trustee, (b) date such receiver or trustee took possession, (c) the authority by which the receivership or trusteeship was created, and (d) date when possession by receiver or trustee ceased.
|
|||
|
4. State the classes or utility and other services furnished by respondent during the year in each State in which the respondent operated.
|
|||
|
5. Have you engaged as the principal accountant to audit your financial statements an accountant who is not the principal accountant for your previous year's certified financial statements?
(1)
☐ Yes
(2)
☑ No |
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
CONTROL OVER RESPONDENT |
||||
|
1. If any corporation, business trust, or similar organization or a combination of such organizations jointly held control over the respondent at the end of the year, state name of controlling corporation or organization, manner in which control was held, and extent of control. If control was in a holding company organization, show the chain of ownership or control to the main parent company or organization. If control was held by a trustee(s), state name of trustee(s), name of beneficiary or beneficiaries for whom trust was maintained, and purpose of the trust. |
||||
|
(a) Name of controlling corporation: The Southern Company (Southern Company), a Delaware corporation. (b) Extent of control: All common stock of respondent is owned by Southern Company. |
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
CORPORATIONS CONTROLLED BY RESPONDENT |
||||
|
||||
| Line No. |
NameOfCompanyControlledByRespondent Name of Company Controlled (a) |
CompanyControlledByRespondentKindOfBusinessDescription Kind of Business (b) |
VotingStockOwnedByRespondentPercentage Percent Voting Stock Owned (c) |
FootnoteReferences Footnote Ref. (d) |
| 1 |
|
(a) |
||
| 2 |
|
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: FootnoteReferences |
(a) 50.00% of Southern Electric Generating Company's capital stock is owned by Georgia Power Company and 50.00% is owned by Alabama Power Company.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
OFFICERS |
|||||
|
|||||
| Line No. |
OfficerTitle Title (a) |
OfficerName Name of Officer (b) |
OfficerSalary Salary for Year (c) |
DateOfficerIncumbencyStarted Date Started in Period (d) |
DateOfficerIncumbencyEnded Date Ended in Period (e) |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | (a) |
||||
| 9 | (b) |
||||
| 10 | (c) |
||||
| 11 | (d) |
||||
| 12 | |||||
| 13 | |||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: OfficerTitle |
Salary is allocated to multiple companies.
|
| (b) Concept: OfficerTitle |
Salary is allocated to multiple companies.
|
| (c) Concept: OfficerTitle |
Salary is allocated to multiple companies.
|
| (d) Concept: OfficerTitle |
Salary is allocated to multiple companies.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
DIRECTORS |
|||||
|
|||||
| Line No. |
NameAndTitleOfDirector Name (and Title) of Director (a) |
PrincipalBusinessAddress Principal Business Address (b) |
MemberOfTheExecutiveCommittee Member of the Executive Committee (c) |
ChairmanOfTheExecutiveCommittee Chairman of the Executive Committee (d) |
|
| 1 | |||||
| 2 | (a) |
||||
| 3 | |||||
| 4 | |||||
| 5 | (b) |
||||
| 6 | (c) |
||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| 11 | |||||
| 12 | |||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: NameAndTitleOfDirector |
| (b) Concept: NameAndTitleOfDirector |
| (c) Concept: NameAndTitleOfDirector |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
INFORMATION ON FORMULA RATES |
|||
|
Does the respondent have formula rates? |
☑ Yes ☐ No |
||
|
|||
| Line No. |
RateScheduleTariffNumber FERC Rate Schedule or Tariff Number (a) |
ProceedingDocketNumber FERC Proceeding (b) |
|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 | |||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
INFORMATION ON FORMULA RATES - FERC Rate Schedule/Tariff Number FERC Proceeding |
|||||
|
Does the respondent file with the Commission annual (or more frequent) filings containing the inputs to the formula rate(s)? |
☑ Yes ☐ No |
||||
|
|||||
| Line No. |
AccessionNumber Accession No. (a) |
DocumentDate Document Date / Filed Date (b) |
DocketNumber Docket No. (c) |
DescriptionOfFiling Description (d) |
RateScheduleTariffNumber Formula Rate FERC Rate Schedule Number or Tariff Number (e) |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
INFORMATION ON FORMULA RATES - Formula Rate Variances |
||||
|
||||
| Line No. |
PageNumberOfFormulaRateVariances Page No(s). (a) |
ScheduleOfFormulaRateVariances Schedule (b) |
ColumnOfFormulaRateVariances Column (c) |
LineNumberOfFormulaRateVariances Line No. (d) |
| 1 | ||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
IMPORTANT CHANGES DURING THE QUARTER/YEAR |
||||
|
Give particulars (details) concerning the matters indicated below. Make the statements explicit and precise, and number them in accordance with the inquiries. Each inquiry should be answered. Enter "none," "not applicable," or "NA" where applicable. If information which answers an inquiry is given elsewhere in the report, make a reference to the schedule in which it appears.
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
6. The following obligations were incurred as a result of the issuance of securities pursuant to Federal Energy Regulatory Commission approval: Georgia Power Company issued commercial paper from time to time during the year ended December 31, 2023. The largest amount of such commercial paper outstanding at any given time during such period was approximately $811 million. In March 2023, Georgia Power borrowed $100 million pursuant to a short-term uncommitted bank credit arrangement bearing interest at a mutually agreed upon rate and payable on demand. In April 2023, Georgia Power borrowed an additional $150 million under the arrangement. In December 2023, Georgia Power borrowed $100 million pursuant to a short-term uncommitted bank credit arrangement bearing interest at a mutually agreed upon rate and payable on demand. The following obligations were incurred as a result of the issuance of securities pursuant to Georgia Public Service Commission approval: In March 2023, Georgia Power reoffered to the public the following pollution control revenue bonds that previously had been purchased and were held by Georgia Power at December 31, 2022: • approximately $28 million aggregate principal amount of Development Authority of Monroe County (Georgia) Pollution Control Revenue Bonds (Georgia Power Company Plant Scherer Project), Second Series 2006; • approximately $89 million aggregate principal amount of Development Authority of Monroe County (Georgia) Pollution Control Revenue Bonds (Georgia Power Company Plant Scherer Project), Second Series 2009; • approximately $49 million aggregate principal amount of Development Authority of Monroe County (Georgia) Pollution Control Revenue Bonds (Georgia Power Company Plant Scherer Project), First Series 2012; • approximately $18 million aggregate principal amount of Development Authority of Monroe County (Georgia) Pollution Control Revenue Bonds (Georgia Power Company Plant Scherer Project), First Series 2013; and • $46 million aggregate principal amount of Development Authority of Burke County (Georgia) Pollution Control Revenue Bonds (Georgia Power Company Plant Vogtle Project), First Series 1996. In May 2023, Georgia Power issued $750 million aggregate principal amount of Series 2023A 4.65% Senior Notes due May 16, 2028 and $1.0 billion aggregate principal amount of Series 2023B 4.95% Senior Notes due May 17, 2033. In November 2023, Georgia Power issued $700 million aggregate principal amount of Series 2023C Floating Rate Senior Notes due May 8, 2025. |
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
13. Effective January 16, 2023, Chimaobi Chijioke was elected as Vice President. Effective February 16, 2023, Larry L. Gellerstedt, III resigned as a Director. Effective March 31, 2023, Steven R. Ewing was elected as a Director. Effective March 31, 2023, Christopher C. Womack resigned as Chairman, President and Chief Executive Officer. Effective March 31, 2023, Kimberly S. Greene was elected as Chairman, President and Chief Executive Officer. Effective March 31, 2023, Sloane N. Drake resigned as Senior Vice President. Effective March 31, 2023, R. Allen Reaves, Jr. resigned as Senior Vice President. Effective April 1, 2023, Sterling A. Spainhour resigned as Senior Vice President, Corporate Secretary and Chief Compliance Officer. Effective April 1, 2023, Erin P. Harris resigned as Vice President. Effective April 1, 2023, David E. Slovensky was elected as Senior Vice President, Corporate Secretary and Chief Compliance Officer. Effective April 1, 2023, Lindsay R. Hill was elected as Senior Vice President. Effective April 1, 2023, Roderick W. Anderson was elected as Senior Vice President. Effective April 1, 2023, John B. Williams was elected as Senior Vice President. Effective April 1, 2023, Jennifer S. McNelly was elected as Vice President. Effective April 1, 2023, Erica McGill was elected as Vice President. Effective April 30, 2023, Kyle Leach resigned as Vice President. Effective April 30, 2023, David L. McKinney resigned as Senior Vice President. Effective May 13, 2023, Sarah P. Adams resigned as Vice President and Comptroller. Effective May 13, 2023, Adam D. Houston experienced a change in officer designation from Assistant Comptroller to Vice President and Comptroller. Effective May 13, 2023, Matthew Berrigan was elected as Assistant Comptroller. Effective September 1, 2023, Lisa J. Smith resigned as Senior Vice President. Effective September 8, 2023, Michael K. Anderson resigned as Senior Vice President. Effective October 16, 2023, Shantella E. Cooper resigned as Director. Effective November 18, 2023, Tyler M. Cook resigned as Vice President. |
||||
|
|
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
COMPARATIVE BALANCE SHEET (ASSETS AND OTHER DEBITS) |
||||
| Line No. |
Title of Account (a) |
Ref. Page No. (b) |
Current Year End of Quarter/Year Balance (c) |
Prior Year End Balance 12/31 (d) |
|
1 |
UtilityPlantAbstract UTILITY PLANT |
|||
|
2 |
UtilityPlant Utility Plant (101-106, 114) |
200 |
|
|
|
3 |
ConstructionWorkInProgress Construction Work in Progress (107) |
200 |
|
|
|
4 |
UtilityPlantAndConstructionWorkInProgress TOTAL Utility Plant (Enter Total of lines 2 and 3) |
|
|
|
|
5 |
AccumulatedProvisionForDepreciationAmortizationAndDepletionOfPlantUtility (Less) Accum. Prov. for Depr. Amort. Depl. (108, 110, 111, 115) |
200 |
|
|
|
6 |
UtilityPlantNet Net Utility Plant (Enter Total of line 4 less 5) |
|
|
|
|
7 |
NuclearFuelInProcessOfRefinementConversionEnrichmentAndFabrication Nuclear Fuel in Process of Ref., Conv., Enrich., and Fab. (120.1) |
202 |
|
|
|
8 |
NuclearFuelMaterialsAndAssembliesStockAccountMajorOnly Nuclear Fuel Materials and Assemblies-Stock Account (120.2) |
|
|
|
|
9 |
NuclearFuelAssembliesInReactorMajorOnly Nuclear Fuel Assemblies in Reactor (120.3) |
|
|
|
|
10 |
SpentNuclearFuelMajorOnly Spent Nuclear Fuel (120.4) |
|
||
|
11 |
NuclearFuelUnderCapitalLeases Nuclear Fuel Under Capital Leases (120.6) |
|||
|
12 |
AccumulatedProvisionForAmortizationOfNuclearFuelAssemblies (Less) Accum. Prov. for Amort. of Nucl. Fuel Assemblies (120.5) |
202 |
|
|
|
13 |
NuclearFuelNet Net Nuclear Fuel (Enter Total of lines 7-11 less 12) |
|
|
|
|
14 |
UtilityPlantAndNuclearFuelNet Net Utility Plant (Enter Total of lines 6 and 13) |
|
|
|
|
15 |
OtherElectricPlantAdjustments Utility Plant Adjustments (116) |
|||
|
16 |
GasStoredUndergroundNoncurrent Gas Stored Underground - Noncurrent (117) |
|||
|
17 |
OtherPropertyAndInvestmentsAbstract OTHER PROPERTY AND INVESTMENTS |
|||
|
18 |
NonutilityProperty Nonutility Property (121) |
|
|
|
|
19 |
AccumulatedProvisionForDepreciationAndAmortizationOfNonutilityProperty (Less) Accum. Prov. for Depr. and Amort. (122) |
|
|
|
|
20 |
InvestmentInAssociatedCompanies Investments in Associated Companies (123) |
|
|
|
|
21 |
InvestmentInSubsidiaryCompanies Investment in Subsidiary Companies (123.1) |
224 |
|
|
|
23 |
NoncurrentPortionOfAllowances Noncurrent Portion of Allowances |
228 |
||
|
24 |
OtherInvestments Other Investments (124) |
|
|
|
|
25 |
SinkingFunds Sinking Funds (125) |
|||
|
26 |
DepreciationFund Depreciation Fund (126) |
|||
|
27 |
AmortizationFundFederal Amortization Fund - Federal (127) |
|||
|
28 |
OtherSpecialFunds Other Special Funds (128) |
(a) |
(b) |
|
|
29 |
SpecialFunds Special Funds (Non Major Only) (129) |
|||
|
30 |
DerivativeInstrumentAssetsLongTerm Long-Term Portion of Derivative Assets (175) |
|||
|
31 |
DerivativeInstrumentAssetsHedgesLongTerm Long-Term Portion of Derivative Assets - Hedges (176) |
|
|
|
|
32 |
OtherPropertyAndInvestments TOTAL Other Property and Investments (Lines 18-21 and 23-31) |
|
|
|
|
33 |
CurrentAndAccruedAssetsAbstract CURRENT AND ACCRUED ASSETS |
|||
|
34 |
CashAndWorkingFunds Cash and Working Funds (Non-major Only) (130) |
|||
|
35 |
Cash Cash (131) |
|
|
|
|
36 |
SpecialDeposits Special Deposits (132-134) |
|
|
|
|
37 |
WorkingFunds Working Fund (135) |
|||
|
38 |
TemporaryCashInvestments Temporary Cash Investments (136) |
|
||
|
39 |
NotesReceivable Notes Receivable (141) |
|||
|
40 |
CustomerAccountsReceivable Customer Accounts Receivable (142) |
|
|
|
|
41 |
OtherAccountsReceivable Other Accounts Receivable (143) |
|
|
|
|
42 |
AccumulatedProvisionForUncollectibleAccountsCredit (Less) Accum. Prov. for Uncollectible Acct.-Credit (144) |
|
|
|
|
43 |
NotesReceivableFromAssociatedCompanies Notes Receivable from Associated Companies (145) |
|||
|
44 |
AccountsReceivableFromAssociatedCompanies Accounts Receivable from Assoc. Companies (146) |
|
|
|
|
45 |
FuelStock Fuel Stock (151) |
227 |
|
|
|
46 |
FuelStockExpensesUndistributed Fuel Stock Expenses Undistributed (152) |
227 |
|
|
|
47 |
Residuals Residuals (Elec) and Extracted Products (153) |
227 |
||
|
48 |
PlantMaterialsAndOperatingSupplies Plant Materials and Operating Supplies (154) |
227 |
|
|
|
49 |
Merchandise Merchandise (155) |
227 |
||
|
50 |
OtherMaterialsAndSupplies Other Materials and Supplies (156) |
227 |
|
|
|
51 |
NuclearMaterialsHeldForSale Nuclear Materials Held for Sale (157) |
202/227 |
||
|
52 |
AllowanceInventoryAndWithheld Allowances (158.1 and 158.2) |
228 |
|
|
|
53 |
NoncurrentPortionOfAllowances (Less) Noncurrent Portion of Allowances |
228 |
||
|
54 |
StoresExpenseUndistributed Stores Expense Undistributed (163) |
227 |
|
|
|
55 |
GasStoredCurrent Gas Stored Underground - Current (164.1) |
|||
|
56 |
LiquefiedNaturalGasStoredAndHeldForProcessing Liquefied Natural Gas Stored and Held for Processing (164.2-164.3) |
|||
|
57 |
Prepayments Prepayments (165) |
|
|
|
|
58 |
AdvancesForGas Advances for Gas (166-167) |
|||
|
59 |
InterestAndDividendsReceivable Interest and Dividends Receivable (171) |
|
||
|
60 |
RentsReceivable Rents Receivable (172) |
|
|
|
|
61 |
AccruedUtilityRevenues Accrued Utility Revenues (173) |
|
|
|
|
62 |
MiscellaneousCurrentAndAccruedAssets Miscellaneous Current and Accrued Assets (174) |
|
|
|
|
63 |
DerivativeInstrumentAssets Derivative Instrument Assets (175) |
|
|
|
|
64 |
DerivativeInstrumentAssetsLongTerm (Less) Long-Term Portion of Derivative Instrument Assets (175) |
|||
|
65 |
DerivativeInstrumentAssetsHedges Derivative Instrument Assets - Hedges (176) |
|
|
|
|
66 |
DerivativeInstrumentAssetsHedgesLongTerm (Less) Long-Term Portion of Derivative Instrument Assets - Hedges (176) |
|
|
|
|
67 |
CurrentAndAccruedAssets Total Current and Accrued Assets (Lines 34 through 66) |
|
|
|
|
68 |
DeferredDebitsAbstract DEFERRED DEBITS |
|||
|
69 |
UnamortizedDebtExpense Unamortized Debt Expenses (181) |
|
|
|
|
70 |
ExtraordinaryPropertyLosses Extraordinary Property Losses (182.1) |
230a |
||
|
71 |
UnrecoveredPlantAndRegulatoryStudyCosts Unrecovered Plant and Regulatory Study Costs (182.2) |
230b |
||
|
72 |
OtherRegulatoryAssets Other Regulatory Assets (182.3) |
232 |
|
|
|
73 |
PreliminarySurveyAndInvestigationCharges Prelim. Survey and Investigation Charges (Electric) (183) |
|
|
|
|
74 |
PreliminaryNaturalGasSurveyAndInvestigationChargesAndOtherPreliminarySurveyAndInvestigationCharges Preliminary Natural Gas Survey and Investigation Charges 183.1) |
|||
|
75 |
OtherPreliminarySurveyAndInvestigationCharges Other Preliminary Survey and Investigation Charges (183.2) |
|||
|
76 |
ClearingAccounts Clearing Accounts (184) |
|
|
|
|
77 |
TemporaryFacilities Temporary Facilities (185) |
|||
|
78 |
MiscellaneousDeferredDebits Miscellaneous Deferred Debits (186) |
233 |
|
|
|
79 |
DeferredLossesFromDispositionOfUtilityPlant Def. Losses from Disposition of Utility Plt. (187) |
|||
|
80 |
ResearchDevelopmentAndDemonstrationExpenditures Research, Devel. and Demonstration Expend. (188) |
352 |
||
|
81 |
UnamortizedLossOnReacquiredDebt Unamortized Loss on Reaquired Debt (189) |
|
|
|
|
82 |
AccumulatedDeferredIncomeTaxes Accumulated Deferred Income Taxes (190) |
234 |
|
(c) |
|
83 |
UnrecoveredPurchasedGasCosts Unrecovered Purchased Gas Costs (191) |
|||
|
84 |
DeferredDebits Total Deferred Debits (lines 69 through 83) |
|
|
|
|
85 |
AssetsAndOtherDebits TOTAL ASSETS (lines 14-16, 32, 67, and 84) |
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: OtherSpecialFunds | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: OtherSpecialFunds | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: AccumulatedDeferredIncomeTaxes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
COMPARATIVE BALANCE SHEET (LIABILITIES AND OTHER CREDITS) |
||||
| Line No. |
Title of Account (a) |
Ref. Page No. (b) |
Current Year End of Quarter/Year Balance (c) |
Prior Year End Balance 12/31 (d) |
|
1 |
ProprietaryCapitalAbstract PROPRIETARY CAPITAL |
|||
|
2 |
CommonStockIssued Common Stock Issued (201) |
250 |
|
|
|
3 |
PreferredStockIssued Preferred Stock Issued (204) |
250 |
||
|
4 |
CapitalStockSubscribed Capital Stock Subscribed (202, 205) |
|||
|
5 |
StockLiabilityForConversion Stock Liability for Conversion (203, 206) |
|||
|
6 |
PremiumOnCapitalStock Premium on Capital Stock (207) |
|
|
|
|
7 |
OtherPaidInCapital Other Paid-In Capital (208-211) |
253 |
|
|
|
8 |
InstallmentsReceivedOnCapitalStock Installments Received on Capital Stock (212) |
252 |
||
|
9 |
DiscountOnCapitalStock (Less) Discount on Capital Stock (213) |
254 |
||
|
10 |
CapitalStockExpense (Less) Capital Stock Expense (214) |
254b |
||
|
11 |
RetainedEarnings Retained Earnings (215, 215.1, 216) |
118 |
|
|
|
12 |
UnappropriatedUndistributedSubsidiaryEarnings Unappropriated Undistributed Subsidiary Earnings (216.1) |
118 |
|
|
|
13 |
ReacquiredCapitalStock (Less) Reacquired Capital Stock (217) |
250 |
||
|
14 |
NoncorporateProprietorship Noncorporate Proprietorship (Non-major only) (218) |
|||
|
15 |
AccumulatedOtherComprehensiveIncome Accumulated Other Comprehensive Income (219) |
122(a)(b) |
|
|
|
16 |
ProprietaryCapital Total Proprietary Capital (lines 2 through 15) |
|
|
|
|
17 |
LongTermDebtAbstract LONG-TERM DEBT |
|||
|
18 |
Bonds Bonds (221) |
256 |
|
|
|
19 |
ReacquiredBonds (Less) Reacquired Bonds (222) |
256 |
|
|
|
20 |
AdvancesFromAssociatedCompanies Advances from Associated Companies (223) |
256 |
||
|
21 |
OtherLongTermDebt Other Long-Term Debt (224) |
256 |
|
|
|
22 |
UnamortizedPremiumOnLongTermDebt Unamortized Premium on Long-Term Debt (225) |
|
|
|
|
23 |
UnamortizedDiscountOnLongTermDebtDebit (Less) Unamortized Discount on Long-Term Debt-Debit (226) |
|
|
|
|
24 |
LongTermDebt Total Long-Term Debt (lines 18 through 23) |
|
|
|
|
25 |
OtherNoncurrentLiabilitiesAbstract OTHER NONCURRENT LIABILITIES |
|||
|
26 |
ObligationsUnderCapitalLeaseNoncurrent Obligations Under Capital Leases - Noncurrent (227) |
|
|
|
|
27 |
AccumulatedProvisionForPropertyInsurance Accumulated Provision for Property Insurance (228.1) |
|
||
|
28 |
AccumulatedProvisionForInjuriesAndDamages Accumulated Provision for Injuries and Damages (228.2) |
|
|
|
|
29 |
AccumulatedProvisionForPensionsAndBenefits Accumulated Provision for Pensions and Benefits (228.3) |
|
|
|
|
30 |
AccumulatedMiscellaneousOperatingProvisions Accumulated Miscellaneous Operating Provisions (228.4) |
|||
|
31 |
AccumulatedProvisionForRateRefunds Accumulated Provision for Rate Refunds (229) |
|
|
|
|
32 |
LongTermPortionOfDerivativeInstrumentLiabilities Long-Term Portion of Derivative Instrument Liabilities |
|||
|
33 |
LongTermPortionOfDerivativeInstrumentLiabilitiesHedges Long-Term Portion of Derivative Instrument Liabilities - Hedges |
|
|
|
|
34 |
AssetRetirementObligations Asset Retirement Obligations (230) |
|
|
|
|
35 |
OtherNoncurrentLiabilities Total Other Noncurrent Liabilities (lines 26 through 34) |
|
|
|
|
36 |
CurrentAndAccruedLiabilitiesAbstract CURRENT AND ACCRUED LIABILITIES |
|||
|
37 |
NotesPayable Notes Payable (231) |
|
|
|
|
38 |
AccountsPayable Accounts Payable (232) |
|
|
|
|
39 |
NotesPayableToAssociatedCompanies Notes Payable to Associated Companies (233) |
|
||
|
40 |
AccountsPayableToAssociatedCompanies Accounts Payable to Associated Companies (234) |
|
|
|
|
41 |
CustomerDeposits Customer Deposits (235) |
|
|
|
|
42 |
TaxesAccrued Taxes Accrued (236) |
262 |
|
|
|
43 |
InterestAccrued Interest Accrued (237) |
|
|
|
|
44 |
DividendsDeclared Dividends Declared (238) |
|||
|
45 |
MaturedLongTermDebt Matured Long-Term Debt (239) |
|||
|
46 |
MaturedInterest Matured Interest (240) |
|||
|
47 |
TaxCollectionsPayable Tax Collections Payable (241) |
|
|
|
|
48 |
MiscellaneousCurrentAndAccruedLiabilities Miscellaneous Current and Accrued Liabilities (242) |
|
|
|
|
49 |
ObligationsUnderCapitalLeasesCurrent Obligations Under Capital Leases-Current (243) |
|
|
|
|
50 |
DerivativesInstrumentLiabilities Derivative Instrument Liabilities (244) |
|
||
|
51 |
LongTermPortionOfDerivativeInstrumentLiabilities (Less) Long-Term Portion of Derivative Instrument Liabilities |
|||
|
52 |
DerivativeInstrumentLiabilitiesHedges Derivative Instrument Liabilities - Hedges (245) |
|
|
|
|
53 |
LongTermPortionOfDerivativeInstrumentLiabilitiesHedges (Less) Long-Term Portion of Derivative Instrument Liabilities-Hedges |
|
|
|
|
54 |
CurrentAndAccruedLiabilities Total Current and Accrued Liabilities (lines 37 through 53) |
|
|
|
|
55 |
DeferredCreditsAbstract DEFERRED CREDITS |
|||
|
56 |
CustomerAdvancesForConstruction Customer Advances for Construction (252) |
|
|
|
|
57 |
AccumulatedDeferredInvestmentTaxCredits Accumulated Deferred Investment Tax Credits (255) |
266 |
|
|
|
58 |
DeferredGainsFromDispositionOfUtilityPlant Deferred Gains from Disposition of Utility Plant (256) |
|||
|
59 |
OtherDeferredCredits Other Deferred Credits (253) |
269 |
|
|
|
60 |
OtherRegulatoryLiabilities Other Regulatory Liabilities (254) |
278 |
|
|
|
61 |
UnamortizedGainOnReacquiredDebt Unamortized Gain on Reacquired Debt (257) |
|
|
|
|
62 |
AccumulatedDeferredIncomeTaxesAcceleratedAmortizationProperty Accum. Deferred Income Taxes-Accel. Amort.(281) |
272 |
|
|
|
63 |
AccumulatedDeferredIncomeTaxesOtherProperty Accum. Deferred Income Taxes-Other Property (282) |
|
|
|
|
64 |
AccumulatedDeferredIncomeTaxesOther Accum. Deferred Income Taxes-Other (283) |
|
|
|
|
65 |
DeferredCredits Total Deferred Credits (lines 56 through 64) |
|
|
|
|
66 |
LiabilitiesAndOtherCredits TOTAL LIABILITIES AND STOCKHOLDER EQUITY (lines 16, 24, 35, 54 and 65) |
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
STATEMENT OF INCOME |
|||||||||||||
|
Quarterly
Annual or Quarterly if applicable
|
|||||||||||||
| Line No. |
Title of Account (a) |
(Ref.) Page No. (b) |
Total Current Year to Date Balance for Quarter/Year (c) |
Total Prior Year to Date Balance for Quarter/Year (d) |
Current 3 Months Ended - Quarterly Only - No 4th Quarter (e) |
Prior 3 Months Ended - Quarterly Only - No 4th Quarter (f) |
Electric Utility Current Year to Date (in dollars) (g) |
Electric Utility Previous Year to Date (in dollars) (h) |
Gas Utiity Current Year to Date (in dollars) (i) |
Gas Utility Previous Year to Date (in dollars) (j) |
Other Utility Current Year to Date (in dollars) (k) |
Other Utility Previous Year to Date (in dollars) (l) |
|
|
1 |
UtilityOperatingIncomeAbstract UTILITY OPERATING INCOME |
||||||||||||
|
2 |
OperatingRevenues Operating Revenues (400) |
300 |
|
|
|
|
|||||||
|
3 |
OperatingExpensesAbstract Operating Expenses |
||||||||||||
|
4 |
OperationExpense Operation Expenses (401) |
320 |
|
|
|
|
|||||||
|
5 |
MaintenanceExpense Maintenance Expenses (402) |
320 |
|
|
|
|
|||||||
|
6 |
DepreciationExpense Depreciation Expense (403) |
336 |
|
|
|
|
|||||||
|
7 |
DepreciationExpenseForAssetRetirementCosts Depreciation Expense for Asset Retirement Costs (403.1) |
336 |
|
|
|
|
|||||||
|
8 |
AmortizationAndDepletionOfUtilityPlant Amort. & Depl. of Utility Plant (404-405) |
336 |
|
|
|
|
|||||||
|
9 |
AmortizationOfElectricPlantAcquisitionAdjustments Amort. of Utility Plant Acq. Adj. (406) |
336 |
|
|
|
|
|||||||
|
10 |
AmortizationOfPropertyLossesUnrecoveredPlantAndRegulatoryStudyCosts Amort. Property Losses, Unrecov Plant and Regulatory Study Costs (407) |
||||||||||||
|
11 |
AmortizationOfConversionExpenses Amort. of Conversion Expenses (407.2) |
||||||||||||
|
12 |
RegulatoryDebits Regulatory Debits (407.3) |
|
|
|
|
||||||||
|
13 |
RegulatoryCredits (Less) Regulatory Credits (407.4) |
|
|
|
|
||||||||
|
14 |
TaxesOtherThanIncomeTaxesUtilityOperatingIncome Taxes Other Than Income Taxes (408.1) |
262 |
|
|
|
|
|||||||
|
15 |
IncomeTaxesOperatingIncome Income Taxes - Federal (409.1) |
262 |
|
|
|
|
|||||||
|
16 |
IncomeTaxesUtilityOperatingIncomeOther Income Taxes - Other (409.1) |
262 |
|
|
|
|
|||||||
|
17 |
ProvisionsForDeferredIncomeTaxesUtilityOperatingIncome Provision for Deferred Income Taxes (410.1) |
234, 272 |
|
|
|
|
|||||||
|
18 |
ProvisionForDeferredIncomeTaxesCreditOperatingIncome (Less) Provision for Deferred Income Taxes-Cr. (411.1) |
234, 272 |
|
|
|
|
|||||||
|
19 |
InvestmentTaxCreditAdjustments Investment Tax Credit Adj. - Net (411.4) |
266 |
|
|
|
|
|||||||
|
20 |
GainsFromDispositionOfPlant (Less) Gains from Disp. of Utility Plant (411.6) |
|
|
|
|
||||||||
|
21 |
LossesFromDispositionOfServiceCompanyPlant Losses from Disp. of Utility Plant (411.7) |
|
|
||||||||||
|
22 |
GainsFromDispositionOfAllowances (Less) Gains from Disposition of Allowances (411.8) |
|
|
|
|
||||||||
|
23 |
LossesFromDispositionOfAllowances Losses from Disposition of Allowances (411.9) |
||||||||||||
|
24 |
AccretionExpense Accretion Expense (411.10) |
|
|
|
|
||||||||
|
25 |
UtilityOperatingExpenses TOTAL Utility Operating Expenses (Enter Total of lines 4 thru 24) |
|
|
|
|
||||||||
|
27 |
NetUtilityOperatingIncome Net Util Oper Inc (Enter Tot line 2 less 25) |
|
|
|
|
||||||||
|
28 |
OtherIncomeAndDeductionsAbstract Other Income and Deductions |
||||||||||||
|
29 |
OtherIncomeAbstract Other Income |
||||||||||||
|
30 |
NonutilityOperatingIncomeAbstract Nonutilty Operating Income |
||||||||||||
|
31 |
RevenuesFromMerchandisingJobbingAndContractWork Revenues From Merchandising, Jobbing and Contract Work (415) |
|
|
||||||||||
|
32 |
CostsAndExpensesOfMerchandisingJobbingAndContractWork (Less) Costs and Exp. of Merchandising, Job. & Contract Work (416) |
|
|
||||||||||
|
33 |
RevenuesFromNonutilityOperations Revenues From Nonutility Operations (417) |
|
|||||||||||
|
34 |
ExpensesOfNonutilityOperations (Less) Expenses of Nonutility Operations (417.1) |
|
|
||||||||||
|
35 |
NonoperatingRentalIncome Nonoperating Rental Income (418) |
|
|
||||||||||
|
36 |
EquityInEarningsOfSubsidiaryCompanies Equity in Earnings of Subsidiary Companies (418.1) |
119 |
|
|
|||||||||
|
37 |
InterestAndDividendIncome Interest and Dividend Income (419) |
|
|
||||||||||
|
38 |
AllowanceForOtherFundsUsedDuringConstruction Allowance for Other Funds Used During Construction (419.1) |
|
|
||||||||||
|
39 |
MiscellaneousNonoperatingIncome Miscellaneous Nonoperating Income (421) |
|
|
||||||||||
|
40 |
GainOnDispositionOfProperty Gain on Disposition of Property (421.1) |
|
|
||||||||||
|
41 |
OtherIncome TOTAL Other Income (Enter Total of lines 31 thru 40) |
|
|
||||||||||
|
42 |
OtherIncomeDeductionsAbstract Other Income Deductions |
||||||||||||
|
43 |
LossOnDispositionOfProperty Loss on Disposition of Property (421.2) |
|
|
||||||||||
|
44 |
MiscellaneousAmortization Miscellaneous Amortization (425) |
|
|
||||||||||
|
45 |
Donations Donations (426.1) |
|
|
||||||||||
|
46 |
LifeInsurance Life Insurance (426.2) |
|
|
||||||||||
|
47 |
Penalties Penalties (426.3) |
|
|
||||||||||
|
48 |
ExpendituresForCertainCivicPoliticalAndRelatedActivities Exp. for Certain Civic, Political & Related Activities (426.4) |
|
|
||||||||||
|
49 |
OtherDeductions Other Deductions (426.5) |
|
|
||||||||||
|
50 |
OtherIncomeDeductions TOTAL Other Income Deductions (Total of lines 43 thru 49) |
|
|
||||||||||
|
51 |
TaxesApplicableToOtherIncomeAndDeductionsAbstract Taxes Applic. to Other Income and Deductions |
||||||||||||
|
52 |
TaxesOtherThanIncomeTaxesOtherIncomeAndDeductions Taxes Other Than Income Taxes (408.2) |
262 |
|
|
|||||||||
|
53 |
IncomeTaxesFederal Income Taxes-Federal (409.2) |
262 |
|
|
|||||||||
|
54 |
IncomeTaxesOther Income Taxes-Other (409.2) |
262 |
|
|
|||||||||
|
55 |
ProvisionForDeferredIncomeTaxesOtherIncomeAndDeductions Provision for Deferred Inc. Taxes (410.2) |
234, 272 |
|
|
|||||||||
|
56 |
ProvisionForDeferredIncomeTaxesCreditOtherIncomeAndDeductions (Less) Provision for Deferred Income Taxes-Cr. (411.2) |
234, 272 |
|
|
|||||||||
|
57 |
InvestmentTaxCreditAdjustmentsNonutilityOperations Investment Tax Credit Adj.-Net (411.5) |
||||||||||||
|
58 |
InvestmentTaxCredits (Less) Investment Tax Credits (420) |
||||||||||||
|
59 |
TaxesOnOtherIncomeAndDeductions TOTAL Taxes on Other Income and Deductions (Total of lines 52-58) |
|
|
||||||||||
|
60 |
NetOtherIncomeAndDeductions Net Other Income and Deductions (Total of lines 41, 50, 59) |
|
|
||||||||||
|
61 |
InterestChargesAbstract Interest Charges |
||||||||||||
|
62 |
InterestOnLongTermDebt Interest on Long-Term Debt (427) |
|
|
||||||||||
|
63 |
AmortizationOfDebtDiscountAndExpense Amort. of Debt Disc. and Expense (428) |
|
|
||||||||||
|
64 |
AmortizationOfLossOnReacquiredDebt Amortization of Loss on Reaquired Debt (428.1) |
|
|
||||||||||
|
65 |
AmortizationOfPremiumOnDebtCredit (Less) Amort. of Premium on Debt-Credit (429) |
|
|
||||||||||
|
66 |
AmortizationOfGainOnReacquiredDebtCredit (Less) Amortization of Gain on Reaquired Debt-Credit (429.1) |
|
|||||||||||
|
67 |
InterestOnDebtToAssociatedCompanies Interest on Debt to Assoc. Companies (430) |
|
|
||||||||||
|
68 |
OtherInterestExpense Other Interest Expense (431) |
|
|
||||||||||
|
69 |
AllowanceForBorrowedFundsUsedDuringConstructionCredit (Less) Allowance for Borrowed Funds Used During Construction-Cr. (432) |
|
|
||||||||||
|
70 |
NetInterestCharges Net Interest Charges (Total of lines 62 thru 69) |
|
|
||||||||||
|
71 |
IncomeBeforeExtraordinaryItems Income Before Extraordinary Items (Total of lines 27, 60 and 70) |
|
|
||||||||||
|
72 |
ExtraordinaryItemsAbstract Extraordinary Items |
||||||||||||
|
73 |
ExtraordinaryIncome Extraordinary Income (434) |
||||||||||||
|
74 |
ExtraordinaryDeductions (Less) Extraordinary Deductions (435) |
||||||||||||
|
75 |
NetExtraordinaryItems Net Extraordinary Items (Total of line 73 less line 74) |
||||||||||||
|
76 |
IncomeTaxesExtraordinaryItems Income Taxes-Federal and Other (409.3) |
262 |
|
||||||||||
|
77 |
ExtraordinaryItemsAfterTaxes Extraordinary Items After Taxes (line 75 less line 76) |
||||||||||||
|
78 |
NetIncomeLoss Net Income (Total of line 71 and 77) |
|
|
||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
STATEMENT OF RETAINED EARNINGS |
||||
|
||||
| Line No. |
Item (a) |
Contra Primary Account Affected (b) |
Current Quarter/Year Year to Date Balance (c) |
Previous Quarter/Year Year to Date Balance (d) |
|
UnappropriatedRetainedEarningsAbstract UNAPPROPRIATED RETAINED EARNINGS (Account 216) |
||||
|
1 |
UnappropriatedRetainedEarnings Balance-Beginning of Period |
|
|
|
|
2 |
ChangesAbstract Changes |
|||
|
3 |
AdjustmentsToRetainedEarningsAbstract Adjustments to Retained Earnings (Account 439) |
|||
|
4 |
AdjustmentsToRetainedEarningsCreditAbstract Adjustments to Retained Earnings Credit |
|||
|
9 |
AdjustmentsToRetainedEarningsCredit TOTAL Credits to Retained Earnings (Acct. 439) |
|||
|
10 |
AdjustmentsToRetainedEarningsDebitAbstract Adjustments to Retained Earnings Debit |
|||
|
15 |
AdjustmentsToRetainedEarningsDebit TOTAL Debits to Retained Earnings (Acct. 439) |
|||
|
16 |
BalanceTransferredFromIncome Balance Transferred from Income (Account 433 less Account 418.1) |
|
|
|
|
17 |
AppropriationsOfRetainedEarningsAbstract Appropriations of Retained Earnings (Acct. 436) |
|||
|
17.1 |
AppropriationsOfRetainedEarnings |
|
|
|
|
22 |
AppropriationsOfRetainedEarnings TOTAL Appropriations of Retained Earnings (Acct. 436) |
|
|
|
|
23 |
DividendsDeclaredPreferredStockAbstract Dividends Declared-Preferred Stock (Account 437) |
|||
|
29 |
DividendsDeclaredPreferredStock TOTAL Dividends Declared-Preferred Stock (Acct. 437) |
|||
|
30 |
DividendsDeclaredCommonStockAbstract Dividends Declared-Common Stock (Account 438) |
|||
|
30.1 |
DividendsDeclaredCommonStock (a) |
|
|
|
|
36 |
DividendsDeclaredCommonStock TOTAL Dividends Declared-Common Stock (Acct. 438) |
|
|
|
|
37 |
TransfersFromUnappropriatedUndistributedSubsidiaryEarnings Transfers from Acct 216.1, Unapprop. Undistrib. Subsidiary Earnings |
|
|
|
|
38 |
UnappropriatedRetainedEarnings Balance - End of Period (Total 1,9,15,16,22,29,36,37) |
|
|
|
|
39 |
AppropriatedRetainedEarningsAbstract APPROPRIATED RETAINED EARNINGS (Account 215) |
|||
|
45 |
AppropriatedRetainedEarnings TOTAL Appropriated Retained Earnings (Account 215) |
|||
|
AppropriatedRetainedEarningsAmortizationReserveFederalAbstract APPROP. RETAINED EARNINGS - AMORT. Reserve, Federal (Account 215.1) |
||||
|
46 |
AppropriatedRetainedEarningsAmortizationReserveFederal TOTAL Approp. Retained Earnings-Amort. Reserve, Federal (Acct. 215.1) |
|
|
|
|
47 |
AppropriatedRetainedEarningsIncludingReserveAmortization TOTAL Approp. Retained Earnings (Acct. 215, 215.1) (Total 45,46) |
|
|
|
|
48 |
RetainedEarnings TOTAL Retained Earnings (Acct. 215, 215.1, 216) (Total 38, 47) (216.1) |
|
|
|
|
UnappropriatedUndistributedSubsidiaryEarningsAbstract UNAPPROPRIATED UNDISTRIBUTED SUBSIDIARY EARNINGS (Account Report only on an Annual Basis, no Quarterly) |
||||
|
49 |
UnappropriatedUndistributedSubsidiaryEarnings Balance-Beginning of Year (Debit or Credit) |
|
|
|
|
50 |
EquityInEarningsOfSubsidiaryCompanies Equity in Earnings for Year (Credit) (Account 418.1) |
|
|
|
|
51 |
DividendsReceived (Less) Dividends Received (Debit) |
|
|
|
|
52 |
ChangesUnappropriatedUndistributedSubsidiaryEarningsCredits TOTAL other Changes in unappropriated undistributed subsidiary earnings for the year |
|||
|
53 |
UnappropriatedUndistributedSubsidiaryEarnings Balance-End of Year (Total lines 49 thru 52) |
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DividendsDeclaredCommonStockDescription | |||||||||||||||||||||||||||
Note 1: Dividend Declarations
All common stock of the respondent is owned by Southern Company.
| |||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
STATEMENT OF CASH FLOWS |
||||||||||||
|
||||||||||||
| Line No. |
Description (See Instructions No.1 for explanation of codes) (a) |
Current Year to Date Quarter/Year (b) |
Previous Year to Date Quarter/Year (c) |
|||||||||
|
1 |
NetCashFlowFromOperatingActivitiesAbstract Net Cash Flow from Operating Activities |
|||||||||||
|
2 |
NetIncomeLoss Net Income (Line 78(c) on page 117) |
|
|
|||||||||
|
3 |
NoncashChargesCreditsToIncomeAbstract Noncash Charges (Credits) to Income: |
|||||||||||
|
4 |
DepreciationAndDepletion Depreciation and Depletion |
|
|
|||||||||
|
5 |
NoncashAdjustmentsToCashFlowsFromOperatingActivities Amortization of (Specify) (footnote details) |
|||||||||||
|
5.1 |
NoncashAdjustmentsToCashFlowsFromOperatingActivitiesDescription |
|||||||||||
|
5.2 |
NoncashAdjustmentsToCashFlowsFromOperatingActivitiesDescription |
|
|
|||||||||
|
5.3 |
NoncashAdjustmentsToCashFlowsFromOperatingActivitiesDescription |
|
|
|||||||||
|
8 |
DeferredIncomeTaxesNet Deferred Income Taxes (Net) |
|
|
|||||||||
|
9 |
InvestmentTaxCreditAdjustmentsNet Investment Tax Credit Adjustment (Net) |
|
|
|||||||||
|
10 |
NetIncreaseDecreaseInReceivablesOperatingActivities Net (Increase) Decrease in Receivables |
|
|
|||||||||
|
11 |
NetIncreaseDecreaseInInventoryOperatingActivities Net (Increase) Decrease in Inventory |
|
|
|||||||||
|
12 |
NetIncreaseDecreaseInAllowancesInventoryOperatingActivities Net (Increase) Decrease in Allowances Inventory |
|
|
|||||||||
|
13 |
NetIncreaseDecreaseInPayablesAndAccruedExpensesOperatingActivities Net Increase (Decrease) in Payables and Accrued Expenses |
|
|
|||||||||
|
14 |
NetIncreaseDecreaseInOtherRegulatoryAssetsOperatingActivities Net (Increase) Decrease in Other Regulatory Assets |
|
|
|||||||||
|
15 |
NetIncreaseDecreaseInOtherRegulatoryLiabilitiesOperatingActivities Net Increase (Decrease) in Other Regulatory Liabilities |
|
|
|||||||||
|
16 |
AllowanceForOtherFundsUsedDuringConstructionOperatingActivities (Less) Allowance for Other Funds Used During Construction |
|
|
|||||||||
|
17 |
UndistributedEarningsFromSubsidiaryCompaniesOperatingActivities (Less) Undistributed Earnings from Subsidiary Companies |
|
|
|||||||||
|
18 |
OtherAdjustmentsToCashFlowsFromOperatingActivities Other (provide details in footnote): |
|||||||||||
|
18.1 |
OtherAdjustmentsToCashFlowsFromOperatingActivitiesDescription |
|||||||||||
|
18.2 |
OtherAdjustmentsToCashFlowsFromOperatingActivitiesDescription |
|
|
|||||||||
|
18.3 |
OtherAdjustmentsToCashFlowsFromOperatingActivitiesDescription |
(a) |
(f) |
|||||||||
|
22 |
NetCashFlowFromOperatingActivities Net Cash Provided by (Used in) Operating Activities (Total of Lines 2 thru 21) |
|
|
|||||||||
|
24 |
CashFlowsFromInvestmentActivitiesAbstract Cash Flows from Investment Activities: |
|||||||||||
|
25 |
ConstructionAndAcquisitionOfPlantIncludingLandAbstract Construction and Acquisition of Plant (including land): |
|||||||||||
|
26 |
GrossAdditionsToUtilityPlantLessNuclearFuelInvestingActivities Gross Additions to Utility Plant (less nuclear fuel) |
|
|
|||||||||
|
27 |
GrossAdditionsToNuclearFuelInvestingActivities Gross Additions to Nuclear Fuel |
|
|
|||||||||
|
28 |
GrossAdditionsToCommonUtilityPlantInvestingActivities Gross Additions to Common Utility Plant |
|||||||||||
|
29 |
GrossAdditionsToNonutilityPlantInvestingActivities Gross Additions to Nonutility Plant |
|
||||||||||
|
30 |
AllowanceForOtherFundsUsedDuringConstructionInvestingActivities (Less) Allowance for Other Funds Used During Construction |
|
|
|||||||||
|
31 |
OtherConstructionAndAcquisitionOfPlantInvestmentActivities Other (provide details in footnote): |
|||||||||||
|
31.1 |
OtherConstructionAndAcquisitionOfPlantInvestmentActivitiesDescription |
|||||||||||
|
34 |
CashOutflowsForPlant Cash Outflows for Plant (Total of lines 26 thru 33) |
|
|
|||||||||
|
36 |
AcquisitionOfOtherNoncurrentAssets Acquisition of Other Noncurrent Assets (d) |
|||||||||||
|
37 |
ProceedsFromDisposalOfNoncurrentAssets Proceeds from Disposal of Noncurrent Assets (d) |
|||||||||||
|
39 |
InvestmentsInAndAdvancesToAssociatedAndSubsidiaryCompanies Investments in and Advances to Assoc. and Subsidiary Companies |
|
|
|||||||||
|
40 |
ContributionsAndAdvancesFromAssociatedAndSubsidiaryCompanies Contributions and Advances from Assoc. and Subsidiary Companies |
|||||||||||
|
41 |
DispositionOfInvestmentsInAndAdvancesToAssociatedAndSubsidiaryCompaniesAbstract Disposition of Investments in (and Advances to) |
|||||||||||
|
42 |
DispositionOfInvestmentsInAndAdvancesToAssociatedAndSubsidiaryCompanies Disposition of Investments in (and Advances to) Associated and Subsidiary Companies |
|||||||||||
|
44 |
PurchaseOfInvestmentSecurities Purchase of Investment Securities (a) |
|||||||||||
|
45 |
ProceedsFromSalesOfInvestmentSecurities Proceeds from Sales of Investment Securities (a) |
|||||||||||
|
46 |
LoansMadeOrPurchased Loans Made or Purchased |
|||||||||||
|
47 |
CollectionsOnLoans Collections on Loans |
|||||||||||
|
49 |
NetIncreaseDecreaseInReceivablesInvestingActivities Net (Increase) Decrease in Receivables |
|
|
|||||||||
|
50 |
NetIncreaseDecreaseInInventoryInvestingActivities Net (Increase) Decrease in Inventory |
|||||||||||
|
51 |
NetIncreaseDecreaseInAllowancesHeldForSpeculationInvestingActivities Net (Increase) Decrease in Allowances Held for Speculation |
|||||||||||
|
52 |
NetIncreaseDecreaseInPayablesAndAccruedExpensesInvestingActivities Net Increase (Decrease) in Payables and Accrued Expenses |
|
|
|||||||||
|
53 |
OtherAdjustmentsToCashFlowsFromInvestmentActivities Other (provide details in footnote): |
|||||||||||
|
53.1 |
OtherAdjustmentsToCashFlowsFromInvestmentActivitiesDescription |
|
|
|||||||||
|
53.2 |
OtherAdjustmentsToCashFlowsFromInvestmentActivitiesDescription |
(b) |
(g) |
|||||||||
|
57 |
CashFlowsProvidedFromUsedInInvestmentActivities Net Cash Provided by (Used in) Investing Activities (Total of lines 34 thru 55) |
|
|
|||||||||
|
59 |
CashFlowsFromFinancingActivitiesAbstract Cash Flows from Financing Activities: |
|||||||||||
|
60 |
ProceedsFromIssuanceAbstract Proceeds from Issuance of: |
|||||||||||
|
61 |
ProceedsFromIssuanceOfLongTermDebtFinancingActivities Long-Term Debt (b) |
|
|
|||||||||
|
62 |
ProceedsFromIssuanceOfPreferredStockFinancingActivities Preferred Stock |
|||||||||||
|
63 |
ProceedsFromIssuanceOfCommonStockFinancingActivities Common Stock |
|||||||||||
|
64 |
OtherAdjustmentsToCashFlowsFromFinancingActivities Other (provide details in footnote): |
|||||||||||
|
64.1 |
OtherAdjustmentsToCashFlowsFromFinancingActivitiesDescription |
|||||||||||
|
64.2 |
OtherAdjustmentsToCashFlowsFromFinancingActivitiesDescription |
|
|
|||||||||
|
66 |
NetIncreaseInShortTermDebt Net Increase in Short-Term Debt (c) |
|
||||||||||
|
67 |
OtherAdjustmentsByOutsideSourcesToCashFlowsFromFinancingActivities Other (provide details in footnote): |
|||||||||||
|
67.1 |
DescriptionForOtherAdjustmentsByOutsideSourcesToCashFlowsFromFinancingActivities |
|||||||||||
|
67.2 |
DescriptionForOtherAdjustmentsByOutsideSourcesToCashFlowsFromFinancingActivities |
|
|
|||||||||
|
70 |
CashProvidedByOutsideSources Cash Provided by Outside Sources (Total 61 thru 69) |
|
|
|||||||||
|
72 |
PaymentsForRetirementAbstract Payments for Retirement of: |
|||||||||||
|
73 |
PaymentsForRetirementOfLongTermDebtFinancingActivities Long-term Debt (b) |
|
|
|||||||||
|
74 |
PaymentsForRetirementOfPreferredStockFinancingActivities Preferred Stock |
|||||||||||
|
75 |
PaymentsForRetirementOfCommonStockFinancingActivities Common Stock |
|||||||||||
|
76 |
OtherRetirementsOfBalancesImpactingCashFlowsFromFinancingActivities Other (provide details in footnote): |
|||||||||||
|
76.1 |
DescriptionOfOtherRetirementsImpactingCashFlowsFromFinancingActivities |
(c) |
(h) |
|||||||||
|
76.2 |
DescriptionOfOtherRetirementsImpactingCashFlowsFromFinancingActivities |
|
|
|||||||||
|
78 |
NetDecreaseInShortTermDebt Net Decrease in Short-Term Debt (c) |
|||||||||||
|
80 |
DividendsOnPreferredStock Dividends on Preferred Stock |
|||||||||||
|
81 |
DividendsOnCommonStock Dividends on Common Stock |
|
|
|||||||||
|
83 |
CashFlowsProvidedFromUsedInFinancingActivities Net Cash Provided by (Used in) Financing Activities (Total of lines 70 thru 81) |
|
|
|||||||||
|
85 |
NetIncreaseDecreaseInCashAndCashEquivalentsAbstract Net Increase (Decrease) in Cash and Cash Equivalents |
|||||||||||
|
86 |
NetIncreaseDecreaseInCashAndCashEquivalents Net Increase (Decrease) in Cash and Cash Equivalents (Total of line 22, 57 and 83) |
|
|
|||||||||
|
88 |
CashAndCashEquivalents Cash and Cash Equivalents at Beginning of Period |
(d) |
|
|||||||||
|
90 |
CashAndCashEquivalents Cash and Cash Equivalents at End of Period |
(e) |
(i) |
|||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: OtherAdjustmentsToCashFlowsFromOperatingActivities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: OtherAdjustmentsToCashFlowsFromInvestmentActivities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: OtherRetirementsOfBalancesImpactingCashFlowsFromFinancingActivities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: CashAndCashEquivalents | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (e) Concept: CashAndCashEquivalents | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (f) Concept: OtherAdjustmentsToCashFlowsFromOperatingActivities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (g) Concept: OtherAdjustmentsToCashFlowsFromInvestmentActivities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (h) Concept: OtherRetirementsOfBalancesImpactingCashFlowsFromFinancingActivities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (i) Concept: CashAndCashEquivalents | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
NOTES TO FINANCIAL STATEMENTS |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Notes to the Financial Statements for The Southern Company and Subsidiary Companies Alabama Power Company Georgia Power Company Mississippi Power Company Southern Power Company and Subsidiary Companies Southern Company Gas and Subsidiary Companies Index to the Combined Notes to Financial Statements
Index to Applicable Notes to Financial Statements by Registrant The following notes to the financial statements are a combined presentation; however, information contained herein relating to any individual Registrant is filed by such Registrant on its own behalf and each Registrant makes no representation as to information related to the other Registrants. The list below indicates the Registrants to which each note applies.
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES These financial statements were prepared in accordance with the accounting requirements of the Federal Energy Regulatory Commission (FERC) as set forth in the applicable Uniform System of Accounts and published accounting releases, which is a comprehensive basis of accounting other than accounting principles generally accepted in the United States (GAAP). These requirements as they relate to the attached financial statements differ from GAAP primarily in: –The classification of the components of: –Accumulated deferred income taxes –Uncertain tax positions –Certain miscellaneous current and accrued liabilities –Prepaid assets –Pension and post-retirement benefit obligations –Maturities of long-term debt –Deferred debits and credits –Certain regulatory assets and liabilities –The presentation of: –Majority-owned subsidiaries and certain other investments –Certain other cost of removal obligations –Post-retirement defined benefit plans –Unamortized debt expense –Unamortized discounts for certain short-term debt –Taxes applicable to other income and deductions –Gains and losses on disposition of property –Line of credit commitment fees and associated expenses –Certain disallowances on operations and maintenance expenses –The fair value amounts of derivative assets and liabilities –ASU 2016-02, Leases (Topic 842) –ASU 2018-15, Intangibles – Goodwill and Other – Internal-Use Software (Topic 350) –ASC 606, Revenue from Contracts with Customers –Establishment and/or amortization of regulatory assets and liabilities –Assets held for sale –Comparative presentation The Notes to the Financial Statements have been prepared in conformity with GAAP. Accordingly, certain Notes are not prepared on the same basis as the financial statements presented herein. Management has evaluated the impact of events occurring after December 31, 2023 up to February 14, 2024, the date that Georgia Power's GAAP financial statements were issued and has updated such evaluation for disclosure purposes through April 1, 2024 as it pertains to Georgia Power. These financial statements include all necessary adjustments and disclosures from these evaluations. General Southern Company is the parent company of three traditional electric operating companies, as well as Southern Power, Southern Company Gas, SCS, Southern Linc, Southern Holdings, Southern Nuclear, PowerSecure, and other direct and indirect subsidiaries. The traditional electric operating companies – Alabama Power, Georgia Power, and Mississippi Power – are vertically integrated utilities providing electric service in three Southeastern states. Southern Power develops, constructs, acquires, owns, and manages power generation assets, including renewable energy projects, and sells electricity at market-based rates in the wholesale market. Southern Company Gas distributes natural gas through natural gas distribution utilities, including Nicor Gas (Illinois), Atlanta Gas Light (Georgia), Virginia Natural Gas, and Chattanooga Gas (Tennessee). Southern Company Gas is also involved in several other complementary businesses including gas pipeline investments and gas marketing services. Prior to the sale of Sequent on July 1, 2021, these businesses also included wholesale gas services. SCS, the system service company, provides, at cost, specialized services to Southern Company and its subsidiary companies. Southern Linc provides digital wireless communications for use by Southern Company and its subsidiary companies and also markets these services to the public and provides fiber optics services within the Southeast. Southern Holdings is an intermediate holding company subsidiary. Southern Nuclear operates and provides services to the Southern Company system's nuclear power plants, including Alabama Power's Plant Farley and Georgia Power's Plant Hatch and Plant Vogtle Units 1 through 3, and is currently managing construction and start-up of Plant Vogtle Unit 4. PowerSecure develops distributed energy and resilience solutions and deploys microgrids for commercial, industrial, governmental, and utility customers. See Note 15 for information regarding the sale of Sequent. The Registrants' financial statements reflect investments in subsidiaries on a consolidated basis. Intercompany transactions have been eliminated in consolidation. The equity method is used for investments in entities in which a Registrant has significant influence but does not have control and for VIEs where a Registrant has an equity investment but is not the primary beneficiary. Southern Power has controlling ownership in certain legal entities for which the contractual provisions represent profit-sharing arrangements because the allocations of cash distributions and tax benefits are not based on fixed ownership percentages. For these arrangements, the noncontrolling interest is accounted for under a balance sheet approach utilizing the HLBV method. The HLBV method calculates each partner's share of income based on the change in net equity the partner can legally claim in a HLBV at the end of the period compared to the beginning of the period. See "Variable Interest Entities" herein and Note 7 for additional information. The traditional electric operating companies, Southern Power, certain subsidiaries of Southern Company Gas, and certain other subsidiaries are subject to regulation by the FERC, and the traditional electric operating companies and the natural gas distribution utilities are also subject to regulation by their respective state PSCs or other applicable state regulatory agencies. As such, the respective financial statements of the applicable Registrants reflect the effects of rate regulation in accordance with GAAP and comply with the accounting policies and practices prescribed by relevant state PSCs or other applicable state regulatory agencies. The preparation of financial statements in conformity with GAAP requires the use of estimates, and the actual results may differ from those estimates. Certain prior years' data presented in the financial statements have been reclassified to conform to the current year presentation. These reclassifications had no impact on the Registrants' results of operations, financial position, or cash flows. Recently Adopted Accounting Standards In 2020, the FASB issued ASU 2020-04, Reference Rate Reform (Topic 848): Facilitation of the Effects of Reference Rate Reform on Financial Reporting (ASU 2020-04) providing temporary guidance to ease the potential burden in accounting for reference rate reform primarily resulting from the discontinuation of LIBOR, which began phasing out on December 31, 2021. The discontinuation date of the overnight 1-, 3-, 6-, and 12-month tenors of LIBOR was June 30, 2023, which was beyond the original effective date of ASU 2020-04; therefore, in December 2022, the FASB issued ASU 2022-06, Reference Rate Reform (Topic 848): Deferral of the Sunset Date of Topic 848 (ASU 2022-06) to defer the sunset date of ASU 2020-04 from December 31, 2022 to December 31, 2024. The amendments were elective and applied to all entities that have contracts, hedging relationships, and other transactions that reference LIBOR or another reference rate expected to be discontinued. The guidance (i) simplified accounting analyses under current GAAP for contract modifications; (ii) simplified the assessment of hedge effectiveness and allows hedging relationships affected by reference rate reform to continue; and (iii) allowed a one-time election to sell or transfer debt securities classified as held to maturity that reference a rate affected by reference rate reform. An entity could elect to apply the amendments prospectively from March 12, 2020 through December 31, 2024 by accounting topic. The Registrants elected to apply the amendments to modifications of debt and derivative arrangements that meet the scope of ASU 2020-04 and ASU 2022-06. Certain provisions in PPAs at Southern Power included references to LIBOR. Contract amendments have been executed to change to a SOFR-based interest rate. Southern Power adopted and applied the practical expedients guidance to these PPAs. Additionally, the Registrants referenced LIBOR for certain debt and hedging arrangements. As of July 1, 2023, all of the debt and hedging arrangements of the Registrants had transitioned to a SOFR-based interest rate based on the terms of the agreements. There were no material impacts from the transition to SOFR and no impacts to any existing accounting conclusions. See Note 14 under "Interest Rate Derivatives" for additional information. Affiliate Transactions The traditional electric operating companies, Southern Power, and Southern Company Gas have agreements with SCS under which certain of the following services are rendered to them at direct or allocated cost: general executive and advisory, general and design engineering, operations, purchasing, accounting, finance, treasury, legal, tax, information technology, marketing, auditing, insurance and pension administration, human resources, systems and procedures, digital wireless communications, cellular tower space, and other services with respect to business and operations, construction management, and Southern Company power pool transactions. These costs are primarily included in other operations and maintenance expenses or capitalized to property, plant, and equipment. Costs for these services from SCS in 2023, 2022, and 2021 were as follows:
Alabama Power and Georgia Power also have agreements with Southern Nuclear under which Southern Nuclear renders the following nuclear-related services at cost: general executive and advisory services; general operations, management, and technical services; administrative services including procurement, accounting, employee relations, systems, and procedures services; strategic planning and budgeting services; other services with respect to business and operations; and, for Georgia Power, construction management. These costs are primarily included in other operations and maintenance expenses or capitalized to property, plant, and equipment. Costs for these services in 2023, 2022, and 2021 amounted to $251 million, $267 million, and $258 million, respectively, for Alabama Power and $899 million, $895 million, and $906 million, respectively, for Georgia Power. See Note 2 under "Georgia Power – Nuclear Construction" for additional information regarding Southern Nuclear's construction management of Plant Vogtle Unit 4 for Georgia Power. Cost allocation methodologies used by SCS and Southern Nuclear prior to the repeal of the Public Utility Holding Company Act of 1935, as amended, were approved by the SEC. Subsequently, additional cost allocation methodologies have been reported to the FERC and management believes they are reasonable. The FERC permits services to be rendered at cost by system service companies. Alabama Power's and Georgia Power's power purchases from affiliates through the Southern Company power pool are included in purchased power, affiliates on their respective statements of income. Mississippi Power's and Southern Power's power purchases from affiliates through the Southern Company power pool are included in purchased power on their respective statements of income and were as follows:
Georgia Power has entered into several PPAs with Southern Power for capacity and energy. Georgia Power's total expenses associated with these PPAs were $143 million, $151 million, and $132 million in 2023, 2022, and 2021, respectively. Southern Power's total revenues from all PPAs with Georgia Power, included in wholesale revenue affiliates on Southern Power's consolidated statements of income, were $145 million, $154 million, and $139 million for 2023, 2022, and 2021, respectively. Included within these revenues were affiliate PPAs accounted for as operating leases, which totaled $116 million, $116 million, and $112 million for 2023, 2022, and 2021, respectively. See Note 9 for additional information. Also see Note 2 under "Georgia Power – Integrated Resource Plans" for information regarding additional affiliate PPAs commencing in 2024. SCS (as agent for Alabama Power, Georgia Power, and Southern Power) and Southern Company Gas have long-term interstate natural gas transportation agreements with SNG that are governed by the terms and conditions of SNG's natural gas tariff and are subject to FERC regulation. See Note 7 under "Southern Company Gas – Equity Method Investments" for additional information. Transportation costs under these agreements in 2023, 2022, and 2021 were as follows:
SCS, as agent for the traditional electric operating companies and Southern Power, has agreements with certain subsidiaries of Southern Company Gas to purchase natural gas. Natural gas purchases made under these agreements were immaterial for Alabama Power, Georgia Power, and Mississippi Power for all periods presented, immaterial for Southern Power in 2023 and 2022, and $18 million for Southern Power in 2021. Alabama Power and Mississippi Power jointly own Plant Greene County. The companies have an agreement under which Alabama Power operates Plant Greene County and Mississippi Power reimburses Alabama Power for its proportionate share of non-fuel operations and maintenance expenses, which totaled $5 million, $6 million, and $10 million in 2023, 2022, and 2021, respectively. See Note 5 under "Joint Ownership Agreements" for additional information. Alabama Power, Georgia Power, and Mississippi Power each have agreements with PowerSecure for equipment purchases and/or services related to utility infrastructure construction, distributed energy, and energy efficiency projects. Costs under these agreements were immaterial for all periods presented. Southern Company Gas has a $77 million contract with the U.S. General Services Administration to increase energy efficiency at certain federal buildings across Georgia, with completion expected by the end of 2024. Southern Company Gas engaged PowerSecure to provide the majority of the construction services under the contract. During 2023 and 2022, Southern Company Gas paid $29 million and $10 million, respectively, to PowerSecure related to this agreement. See Note 7 under "SEGCO" for information regarding Alabama Power's and Georgia Power's equity method investment in SEGCO and related affiliate purchased power costs, as well as Alabama Power's gas pipeline ownership agreement with SEGCO. Southern Power has several agreements with SCS for transmission services, which are billed to Southern Power based on the Southern Company Open Access Transmission Tariff as filed with the FERC. Transmission services purchased by Southern Power from SCS totaled $33 million, $39 million, and $28 million for 2023, 2022, and 2021, respectively, and were charged to other operations and maintenance expenses in Southern Power's consolidated statements of income. The traditional electric operating companies and Southern Power may jointly enter into various types of wholesale energy, natural gas, and certain other contracts, either directly or through SCS as agent. Each participating company may be jointly and severally liable for the obligations incurred under these agreements. See Note 14 under "Contingent Features" for additional information. Southern Power and the traditional electric operating companies generally settle amounts related to the above transactions on a monthly basis in the month following the performance of such services or the purchase or sale of electricity. See "Revenues – Southern Power" herein for additional information. The traditional electric operating companies, Southern Power, and Southern Company Gas provide incidental services to and receive such services from other Southern Company subsidiaries which are generally minor in duration and amount. Except as described herein, the traditional electric operating companies, Southern Power, and Southern Company Gas neither provided nor received any material services to or from affiliates in any year presented. Regulatory Assets and Liabilities The traditional electric operating companies and the natural gas distribution utilities are subject to accounting requirements for the effects of rate regulation. Regulatory assets represent probable future revenues associated with certain costs that are expected to be recovered from customers through the ratemaking process. Regulatory liabilities represent costs recovered that are expected to be incurred in the future or probable future reductions in revenues associated with amounts that are expected to be credited to customers through the ratemaking process. In the event that a portion of a traditional electric operating company's or a natural gas distribution utility's operations is no longer subject to applicable accounting rules for rate regulation, such company would be required to write off to income or reclassify to AOCI related regulatory assets and liabilities that are not specifically recoverable through regulated rates. In addition, the traditional electric operating company or the natural gas distribution utility would be required to determine if any impairment to other assets, including plant, exists and write down the assets, if impaired, to their fair values. All regulatory assets and liabilities are to be reflected in rates. See Note 2 for additional information including details of regulatory assets and liabilities reflected in the balance sheets for Southern Company, the traditional electric operating companies, and Southern Company Gas. Revenues The Registrants generate revenues from a variety of sources which are accounted for under various revenue accounting guidance, including revenue from contracts with customers, lease, derivative, and regulatory accounting. See Notes 4, 9, and 14 for additional information. Traditional Electric Operating Companies The majority of the revenues of the traditional electric operating companies are generated from contracts with retail electric customers. These revenues, generated from the integrated service to deliver electricity when and if called upon by the customer, are recognized as a single performance obligation satisfied over time, at a tariff rate, and as electricity is delivered to the customer during the month. Unbilled revenues related to retail sales are accrued at the end of each fiscal period. Retail rates may include provisions to adjust revenues for fluctuations in fuel costs, fuel hedging, the energy component of purchased power costs, and certain other costs. Revenues are adjusted for differences between these actual costs and amounts billed in current regulated rates. Under or over recovered regulatory clause revenues are recorded in the balance sheets and are recovered from or returned to customers, respectively, through adjustments to the billing factors. See Note 2 for additional information regarding regulatory matters of the traditional electric operating companies. Wholesale capacity revenues from PPAs are recognized in amounts billable under the contract terms. Energy and other revenues are generally recognized as services are provided. The contracts for capacity and energy in a wholesale PPA have multiple performance obligations where the contract's total transaction price is allocated to each performance obligation based on the standalone selling price. The standalone selling price is primarily determined by the price charged to customers for the specific goods or services transferred with the performance obligations. Generally, the traditional electric operating companies recognize revenue as the performance obligations are satisfied over time as electricity is delivered to the customer or as generation capacity is available to the customer. For both retail and wholesale revenues, the traditional electric operating companies have elected to recognize revenue for their sales of electricity and capacity using the invoice practical expedient as they generally have a right to consideration in an amount that corresponds directly with the value to the customer of the performance completed to date and that may be invoiced. Payment for goods and services rendered is typically due in the subsequent month following satisfaction of the Registrants' performance obligation. Southern Power Southern Power sells capacity and energy at rates specified under contractual terms in long-term PPAs. These PPAs are accounted for as leases, normal sale derivatives, or contracts with customers. Capacity revenues from PPAs classified as operating leases are recognized on a straight-line basis over the term of the agreement. Energy revenues are recognized in the period the energy is delivered. Capacity revenues from PPAs classified as sales-type leases are recognized by accounting for interest income on the net investment in the lease. Southern Power's non-lease contracts commonly include capacity and energy which are considered separate performance obligations. In these contracts, the total transaction price is allocated to each performance obligation based on the standalone selling price. The standalone selling price is primarily determined by the price charged to customers for the specific goods or services transferred with the performance obligations. Generally, Southern Power recognizes revenue as the performance obligations are satisfied over time, as electricity is delivered to the customer or as generation capacity is made available to the customer. Southern Power generally has a right to consideration in an amount that corresponds directly with the value to the customer of the performance completed to date and may recognize revenue in the amount to which the entity has a right to invoice. Payment for goods and services rendered is typically due in the subsequent month following satisfaction of Southern Power's performance obligation. When multiple contracts exist with the same counterparty, the revenues from each contract are accounted for as separate arrangements. Southern Power may also enter into contracts to sell short-term capacity in the wholesale electricity markets. These sales are generally classified as mark-to-market derivatives and net unrealized gains and losses on such contracts are recorded in wholesale revenues. See Note 14 and "Financial Instruments" herein for additional information. Southern Company Gas Gas Distribution Operations Southern Company Gas records revenues when goods or services are provided to customers. Those revenues are based on rates approved by the state regulatory agencies of the natural gas distribution utilities. Atlanta Gas Light operates in a deregulated natural gas market whereby Marketers, rather than a traditional utility, sell natural gas to end-use customers in Georgia and handle customer billing functions. As required by the Georgia PSC, Atlanta Gas Light bills Marketers in equal monthly installments for each residential, commercial, and industrial end-use customer's distribution costs as well as for capacity costs utilizing a seasonal rate design for the calculation of each residential end-use customer's annual straight-fixed-variable charge, which reflects the historic volumetric usage pattern for the entire residential class. The majority of the revenues of Southern Company Gas are generated from contracts with natural gas distribution customers. Revenues from this integrated service to deliver gas when and if called upon by the customer are recognized as a single performance obligation satisfied over time and are recognized at a tariff rate as gas is delivered to the customer during the month. The standalone selling price is primarily determined by the price charged to customers for the specific goods or services transferred with the performance obligations. Generally, Southern Company Gas recognizes revenue as the performance obligations are satisfied over time as natural gas is delivered to the customer. The performance obligations related to wholesale gas services are satisfied, and revenue is recognized, at a point in time when natural gas is delivered to the customer. Southern Company Gas has elected to recognize revenue for sales of gas using the invoice practical expedient as it generally has a right to consideration in an amount that corresponds directly with the value to the customer of the performance completed to date and that may be invoiced. Payment for goods and services rendered is typically due in the subsequent month following satisfaction of Southern Company Gas' performance obligation. With the exception of Atlanta Gas Light, the natural gas distribution utilities have rate structures that include volumetric rate designs that allow the opportunity to recover certain costs based on gas usage. Revenues from sales and transportation services are recognized in the same period in which the related volumes are delivered to customers. Revenues from residential and certain commercial and industrial customers are recognized on the basis of scheduled meter readings. Additionally, unbilled revenues are recognized for estimated deliveries of gas not yet billed to these customers, from the last bill date to the end of the accounting period. For other commercial and industrial customers, revenues are based on actual deliveries through the end of the period. *The tariffs for the natural gas distribution utilities include provisions which allow for the recognition of certain revenues prior to the time such revenues are billed to customers. These provisions are referred to as alternative revenue programs and provide for the recognition of certain revenues prior to billing, as long as the amounts recognized will be collected from customers within 24 months of recognition. Revenue related to alternative revenue programs was $20 million, $(5) million, and $11 million in 2023, 2022, and 2021, respectively. These programs are as follows: *Weather normalization adjustments – reduce customer bills when winter weather is colder than normal and increase customer bills when weather is warmer than normal and are included in the tariffs for Virginia Natural Gas and Chattanooga Gas; *Revenue normalization mechanisms – mitigate the impact of conservation and declining customer usage and are contained in the tariffs for Virginia Natural Gas and Nicor Gas; and *Revenue true-up adjustment – included within the provisions of the GRAM program in which Atlanta Gas Light participates as a short-term alternative to formal rate case filings, the revenue true-up feature provides for a positive (or negative) adjustment to record revenue in the amount of any variance to budgeted revenues, which are submitted and approved annually as a requirement of GRAM. Such adjustments are reflected in customer billings in a subsequent program year. *Wholesale Gas Services *Prior to the sale of Sequent on July 1, 2021, Southern Company Gas netted revenues from energy and risk management activities with the associated costs. Profits from sales between segments were eliminated and recognized as goods or services sold to end-use customers. Southern Company Gas recorded wholesale gas services' transactions that qualified as derivatives at fair value with changes in fair value recognized in earnings in the period of change and characterized as unrealized gains or losses. Gains and losses on derivatives held for energy trading purposes were presented on a net basis in revenue. See Note 15 under "Southern Company Gas" for additional information on the sale of Sequent. Gas Marketing Services Southern Company Gas recognizes revenues from natural gas sales and transportation services in the same period in which the related volumes are delivered to customers and recognizes sales revenues from residential and certain commercial and industrial customers on the basis of scheduled meter readings. Southern Company Gas also recognizes unbilled revenues for estimated deliveries of gas not yet billed to these customers from the most recent meter reading date to the end of the accounting period. For other commercial and industrial customers and for all wholesale customers, revenues are based on actual deliveries during the period. Southern Company Gas recognizes revenues on 12-month utility-bill management contracts as the lesser of cumulative earned or cumulative billed amounts. Concentration of Revenue Southern Company, Alabama Power, Georgia Power, Mississippi Power (with the exception of its full requirements cost-based MRA electric tariffs described below), Southern Power, and Southern Company Gas each have a diversified base of customers and no single customer comprises 10% or more of each company's revenues. Mississippi Power provides service under long-term contracts with rural electric cooperative associations and a municipality located in southeastern Mississippi under requirements cost-based MRA electric tariffs, which are subject to regulation by the FERC. The contracts with these wholesale customers represented 14.0% of Mississippi Power's total operating revenues in 2023. Fuel Costs Fuel costs for the traditional electric operating companies and Southern Power are expensed as the fuel is used. Fuel expense generally includes fuel transportation costs and the cost of purchased emissions allowances as they are used. For Alabama Power and Georgia Power, fuel expense also includes the amortization of the cost of nuclear fuel. For the traditional electric operating companies, fuel costs also include gains and/or losses from fuel-hedging programs as approved by their respective state PSCs. Cost of Natural Gas Excluding Atlanta Gas Light, which does not sell natural gas to end-use customers, Southern Company Gas charges its utility customers for natural gas consumed using natural gas cost recovery mechanisms set by the applicable state regulatory agencies. Under these mechanisms, all prudently-incurred natural gas costs are passed through to customers without markup, subject to regulatory review. Southern Company Gas defers or accrues the difference between the actual cost of natural gas and the amount of commodity revenue earned in a given period such that no operating income is recognized related to these costs. The deferred or accrued amount is either billed or refunded to customers prospectively through adjustments to the commodity rate. Deferred and accrued natural gas costs are included in the balance sheets as regulatory assets and regulatory liabilities, respectively. Southern Company Gas' gas marketing services' customers are charged for actual or estimated natural gas consumed. Within cost of natural gas, Southern Company Gas also includes costs of lost and unaccounted for gas and gains and losses associated with certain derivatives. Income Taxes The Registrants use the liability method of accounting for deferred income taxes and provide deferred income taxes for all significant income tax temporary differences. In accordance with regulatory requirements, deferred federal ITCs for the traditional electric operating companies are amortized over the average life of the related property, with such amortization normally applied as a credit to reduce depreciation and amortization in the statements of income. Southern Power's and the natural gas distribution utilities' deferred federal ITCs, as well as certain state ITCs for Nicor Gas, are amortized to income tax expense over the life of the respective asset. Under current tax law, certain projects at Southern Power related to the construction of renewable facilities are eligible for federal ITCs. Southern Power estimates eligible costs which, as they relate to acquisitions, may not be finalized until the allocation of the purchase price to assets has been finalized. Southern Power applies the deferred method to ITCs, whereby the ITCs are recorded as a deferred credit and amortized to income tax expense over the life of the respective asset. Furthermore, the tax basis of the asset is reduced by 50% of the ITCs received, resulting in a net deferred tax asset. Southern Power has elected to recognize the tax benefit of this basis difference as a reduction to income tax expense in the year in which the plant reaches commercial operation. State ITCs are recognized as an income tax benefit in the period in which the credits are generated. In addition, certain projects are eligible for federal and state PTCs, which are recognized as an income tax benefit based on KWH production. Federal ITCs and PTCs, as well as state ITCs and other state tax credits available to reduce income taxes payable, were not fully utilized in 2023 and will be carried forward and utilized in future years. In addition, Southern Company is expected to have various state net operating loss (NOL) carryforwards for certain of its subsidiaries, including Mississippi Power and Southern Power, which would result in income tax benefits in the future, if utilized. See Note 10 under "Current and Deferred Income Taxes – Tax Credit Carryforwards" and " – Net Operating Loss Carryforwards" for additional information. In June 2023, the IRS issued temporary regulations related to the transferability of certain tax credits under the IRA. Southern Company and certain subsidiaries have tax credits that are eligible to be transferred. The discount recorded on transferred credits is booked through income tax expense. Under current tax law, Georgia Power is eligible to generate advanced nuclear PTCs for Plant Vogtle Unit 3, which are recognized as an income tax benefit based on KWH production and are eligible to be transferred. Pursuant to the Global Amendments to the Vogtle Joint Ownership Agreements (as defined in Note 2 under "Georgia Power – Nuclear Construction – Joint Owner Contracts"), Georgia Power is purchasing advanced nuclear PTCs for Plant Vogtle Unit 3 from the other Vogtle Owners. The gain recognized on the purchase of the joint owner PTCs is recognized as an income tax benefit. The Registrants recognize tax positions that are "more likely than not" of being sustained upon examination by the appropriate taxing authorities. See Note 10 under "Unrecognized Tax Benefits" for additional information. Other Taxes Taxes imposed on and collected from customers on behalf of governmental agencies are presented net on the Registrants' statements of income and are excluded from the transaction price in determining the revenue related to contracts with a customer. Southern Company Gas is taxed on its gas revenues by various governmental authorities, but is allowed to recover these taxes from its customers. Revenue taxes imposed on the natural gas distribution utilities are recorded at the amount charged to customers, which may include a small administrative fee, as operating revenues, and the related taxes imposed on Southern Company Gas are recorded as operating expenses on the statements of income. Revenue taxes included in operating expenses were $129 million, $158 million, and $119 million in 2023, 2022, and 2021, respectively. Allowance for Funds Used During Construction and Interest Capitalized The traditional electric operating companies and the natural gas distribution utilities record AFUDC, which represents the estimated debt and equity costs of capital funds that are necessary to finance the construction of new regulated facilities. While cash is not realized currently, AFUDC increases the revenue requirement and is recovered over the service life of the asset through a higher rate base and higher depreciation. The equity component of AFUDC is not taxable. Interest related to financing the construction of new facilities at Southern Power and new facilities not included in the traditional electric operating companies' and Southern Company Gas' regulated rates is capitalized in accordance with standard interest capitalization requirements. Total AFUDC and interest capitalized for the applicable Registrants in 2023, 2022, and 2021 was as follows:
*See Note 2 under "Georgia Power – Nuclear Construction" for information on the inclusion of a portion of construction costs related to Plant Vogtle Unit 4 in Georgia Power's rate base. The average AFUDC composite rates for 2023, 2022, and 2021 for the traditional electric operating companies and the natural gas distribution utilities were as follows:
(a)Excludes AFUDC related to the construction of Plant Vogtle Units 3 and 4. See Note 2 under "Georgia Power – Nuclear Construction" for additional information. (b)Mississippi Power's AFUDC was immaterial in 2023. Impairment of Long-Lived Assets The Registrants evaluate long-lived assets and finite-lived intangible assets for impairment when events or changes in circumstances indicate that the carrying amount of such assets may not be recoverable. The determination of whether an impairment has occurred is based on either a specific regulatory disallowance, a sales transaction price that is less than the asset group's carrying amount, or an estimate of undiscounted future cash flows attributable to the asset group, as compared with the carrying amount of the assets. If an impairment has occurred, the amount of the impairment loss recognized is determined by either the amount of regulatory disallowance or by the amount the carrying amount exceeds the estimated fair value of the assets. For assets identified as held for sale, the carrying amount is compared to the estimated fair value less the cost to sell in order to determine if an impairment loss is required. Until the assets are disposed of, their estimated fair value is re-evaluated when circumstances or events change. See Notes 7 and 9 under "Southern Company Gas" and "Southern Company Leveraged Lease," respectively, and Note 15 under "Southern Company" and "Southern Company Gas" for information regarding impairment charges recorded during the periods presented. Goodwill and Other Intangible Assets Southern Power's intangible assets consist primarily of certain PPAs acquired, which are amortized over the term of the respective PPA. Southern Company Gas' goodwill and other intangible assets primarily relate to its 2016 acquisition by Southern Company. In addition to these items, Southern Company's goodwill and other intangible assets also relate to its 2016 acquisition of PowerSecure. For its 2023 and 2022 annual impairment tests, Southern Company Gas management performed the qualitative assessment and determined that it was more likely than not that the fair value of all of its reporting units with goodwill exceeded their carrying amounts, and therefore no quantitative assessment was required. For its 2021 annual impairment test, Southern Company Gas management performed the quantitative assessment and confirmed that the fair values of all of its reporting units with goodwill exceeded their carrying amounts. For its 2023 and 2021 annual impairment tests, PowerSecure management performed the quantitative assessment, which resulted in the fair value of PowerSecure exceeding its carrying amount. For its 2022 annual impairment test, PowerSecure management performed the quantitative assessment, which resulted in the fair value of PowerSecure being lower than its carrying amount. The fair value was estimated using a discounted cash flow analysis. The decline in fair value primarily resulted from declining macroeconomic conditions, reducing sales growth and estimated cash flows. As a result, a goodwill impairment of $119 million was recorded in the fourth quarter 2022. At December 31, 2023 and 2022, goodwill was as follows:
At December 31, 2023 and 2022, other intangible assets were as follows:
*All subject to amortization. Amortization associated with other intangible assets in 2023, 2022, and 2021 was as follows:
(a)Includes $20 million annually recorded as a reduction to operating revenues. (b)Recorded as a reduction to operating revenues. At December 31, 2023, the estimated amortization associated with other intangible assets for the next five years is as follows:
Acquisition Accounting At the time of an acquisition, management will assess whether acquired assets and activities meet the definition of a business. Acquisitions that meet the definition of a business are accounted for under the acquisition method, and operating results from the date of acquisition are included in the acquiring entity's financial statements. Identifiable assets acquired, liabilities assumed, and any noncontrolling interests (including any intangible assets) are recognized and measured at fair value. Assets acquired that do not meet the definition of a business are accounted for as an asset acquisition. The purchase price of each asset acquisition is allocated based on the relative fair value of assets acquired. Determining the fair value of assets acquired and liabilities assumed requires management judgment and management may engage independent valuation experts to assist in this process. Fair values are determined by using market participant assumptions and typically include the timing and amounts of future cash flows, incurred construction costs, the nature of acquired contracts, discount rates, power market prices, and expected asset lives. For potential or successful acquisitions that meet the definition of a business, any due diligence or transaction costs incurred are expensed as incurred. If the acquisition is an asset acquisition, direct and incremental transaction costs can be capitalized as a component of the cost of the assets acquired. Historically, any contingent consideration relates to fixed amounts due to the seller once an acquired construction project is placed in service. For contingent consideration with variable payments, management fair values the arrangement with any changes recorded in the statements of income. See Note 13 for additional fair value information. Development Costs For Southern Power, development costs are capitalized once a project is probable of completion, primarily based on a review of its economics and operational feasibility, as well as the status of power off-take agreements and regulatory approvals, if applicable. Southern Power's capitalized development costs are included in CWIP on the balance sheets. All of Southern Power's development costs incurred prior to the determination that a project is probable of completion are expensed as incurred and included in other operations and maintenance expense in the statements of income. If it is determined that a project is no longer probable of completion, any of Southern Power's capitalized development costs are expensed and included in other operations and maintenance expense in the statements of income. Long-Term Service Agreements The traditional electric operating companies and Southern Power have entered into LTSAs for the purpose of securing maintenance support for certain of their generating facilities. The LTSAs cover all planned inspections on the covered equipment, which generally includes the cost of all labor and materials. The LTSAs also obligate the counterparties to cover the costs of unplanned maintenance on the covered equipment subject to limits and scope specified in each contract. Payments made under the LTSAs for the performance of any planned inspections or unplanned capital maintenance are recorded in the statements of cash flows as investing activities. Receipts of major parts into materials and supplies inventory prior to planned inspections are treated as noncash transactions in the statements of cash flows. Any payments made prior to the work being performed are recorded as prepayments in other current assets and noncurrent assets on the balance sheets. At the time work is performed, an appropriate amount is accrued for future payments or transferred from the prepayment and recorded as property, plant, and equipment or expensed. Transmission Receivables/Prepayments As a result of Southern Power's acquisition and construction of generating facilities, Southern Power has transmission receivables and/or prepayments representing the portion of interconnection network and transmission upgrades that will be reimbursed to Southern Power. Upon completion of the related project, transmission costs are generally reimbursed by the interconnection provider within a five-year period and the receivable/prepayments are reduced as payments or services are received. Cash, Cash Equivalents, and Restricted Cash For purposes of the financial statements, temporary cash investments are considered cash equivalents. Temporary cash investments are securities with original maturities of 90 days or less. The following table provides a reconciliation of cash, cash equivalents, and restricted cash reported within the balance sheets that total to the amount shown in the statements of cash flows for the applicable Registrants:
(a)For Alabama Power, reflects proceeds from the issuance of solid waste disposal facility revenue bonds in 2023. For Georgia Power, reflects proceeds from the issuance of solid waste disposal facility revenue bonds in 2022. See Note 8 under "Long-term Debt" for additional information. For Southern Power, reflects $17 million at December 31, 2023 resulting from an arbitration award held to fund future replacement costs and $3 million at both December 31, 2023 and 2022 held to fund estimated construction completion costs at the Deuel Harvest wind facility. See Note 3 under "General Litigation Matters – Southern Power" and Note 15 under "Southern Power" for additional information. For Southern Company Gas, reflects collateral for workers' compensation, life insurance, and long-term disability insurance. (b)Total may not add due to rounding. Storm Damage and Reliability Reserves In accordance with their respective state PSC orders, the traditional electric operating companies accrue certain amounts annually related to storm damage recovery. Each traditional electric operating company maintains a reserve to cover or is allowed to defer and recover the cost of damages from major storms to its transmission and distribution lines and, for Mississippi Power, the cost of uninsured damages to its generation facilities and other property. Alabama Power also has authority from the Alabama PSC to accrue certain additional amounts as circumstances warrant. Alabama Power recorded an additional accrual of $65 million in 2021. Storm damage reserve activity for the traditional electric operating companies during 2023 was as follows:
The traditional electric operating companies accrued the following amounts related to storm damage recovery in 2022 and 2021:
(a)Alabama Power's 2021 amount includes the $65 million additional accrual discussed above. (b)Mississippi Power's net accrual includes carrying costs, as well as amortization of related excess deferred income tax benefits. In 2022, costs for weather-related damages charged against storm damage reserves totaled $24 million and $82 million for Alabama Power and Georgia Power, respectively, and were immaterial for Mississippi Power. See Note 2 under "Alabama Power – Rate NDR," "Georgia Power – Storm Damage Recovery," and "Mississippi Power – System Restoration Rider" for additional information regarding each company's storm damage reserve. During 2022, the Alabama PSC and the Mississippi PSC authorized Alabama Power and Mississippi Power, respectively, to make accruals to a reliability reserve if certain conditions are met. During 2023 and 2022, Alabama Power and Mississippi Power accrued the following amounts to their reliability reserves:
See Note 2 under "Alabama Power – Reliability Reserve Accounting Order" and "Mississippi Power – Reliability Reserve Accounting Order" for additional information. Materials and Supplies Materials and supplies for the traditional electric operating companies generally includes the average cost of transmission, distribution, and generating plant materials. Materials and supplies for Southern Company Gas generally includes propane gas inventory, liquefied natural gas inventory, fleet fuel, and other materials and supplies. Materials and supplies for Southern Power generally includes the average cost of generating plant materials. Materials are recorded to inventory when purchased and then expensed or capitalized to property, plant, and equipment, as appropriate, at weighted average cost when installed. In addition, certain major parts are recorded as inventory when acquired and then capitalized at cost when installed to property, plant, and equipment. Fuel Inventory Fuel inventory for the traditional electric operating companies includes the average cost of coal, natural gas, oil, transportation, and emissions allowances. Fuel inventory for Southern Power, which is included in other current assets, includes the average cost of oil, natural gas, and emissions allowances. Fuel is recorded to inventory when purchased and then expensed, at weighted average cost, as used. Emissions allowances granted by the EPA are included in inventory at zero cost. The traditional electric operating companies recover fuel expense through fuel cost recovery rates approved by each state PSC or, for wholesale rates, the FERC. Natural Gas for Sale With the exception of Nicor Gas, Southern Company Gas records natural gas inventories on a weighted average cost of gas basis. In Georgia's deregulated, competitive environment, Marketers sell natural gas to firm end-use customers at market-based prices. On a monthly basis, Atlanta Gas Light assigns to Marketers the majority of the pipeline storage services that it has under contract, along with a corresponding amount of inventory. Atlanta Gas Light retains and manages a portion of its pipeline storage assets and related natural gas inventories for system balancing and to serve system demand. Nicor Gas' natural gas inventory is carried at cost on a LIFO basis. Inventory decrements occurring during the year that are restored prior to year-end are charged to cost of natural gas at the estimated annual replacement cost. Inventory decrements that are not restored prior to year-end are charged to cost of natural gas at the actual LIFO cost of the inventory layers liquidated. The cost of natural gas, including inventory costs, is recovered from customers under a purchased gas recovery mechanism adjusted for differences between actual costs and amounts billed; therefore, LIFO liquidations have no impact on Southern Company's or Southern Company Gas' net income. At December 31, 2023, the Nicor Gas LIFO inventory balance was $186 million. Based on the average cost of gas purchased in December 2023, the estimated replacement cost of Nicor Gas' inventory at December 31, 2023 was $268 million. Provision for Uncollectible Accounts The customers of the traditional electric operating companies and the natural gas distribution utilities are billed monthly. For the majority of receivables, a provision for uncollectible accounts is established based on historical collection experience and other factors. For the remaining receivables, if the company is aware of a specific customer's inability to pay, a provision for uncollectible accounts is recorded to reduce the receivable balance to the amount reasonably expected to be collected. If circumstances change, the estimate of the recoverability of accounts receivable could change as well. Circumstances that could affect this estimate include, but are not limited to, customer credit issues, customer deposits, and general economic conditions. Customers' accounts are written off once they are deemed to be uncollectible. For all periods presented, uncollectible accounts averaged less than 1% of revenues for each Registrant. Credit risk exposure at Nicor Gas is mitigated by a bad debt rider approved by the Illinois Commission. The bad debt rider provides for the recovery from (or refund to) customers of the difference between Nicor Gas' actual bad debt experience on an annual basis and the benchmark bad debt expense used to establish its base rates for the respective year. Concentration of Credit Risk Concentration of credit risk occurs at Atlanta Gas Light for amounts billed for services and other costs to its customers, which consist of 13 Marketers in Georgia (including SouthStar). The credit risk exposure to the Marketers varies seasonally, with the lowest exposure in the non-peak summer months and the highest exposure in the peak winter months. Marketers are responsible for the retail sale of natural gas to end-use customers in Georgia. The functions of the retail sale of gas include the purchase and sale of natural gas, customer service, billings, and collections. The provisions of Atlanta Gas Light's tariff allow Atlanta Gas Light to obtain credit security support in an amount equal to a minimum of two times a Marketer's highest month's estimated bill from Atlanta Gas Light. Financial Instruments The traditional electric operating companies and Southern Power use derivative financial instruments to limit exposure to fluctuations in interest rates, the prices of certain fuel purchases, electricity purchases and sales, and occasionally foreign currency exchange rates. Southern Company Gas uses derivative financial instruments to limit exposure to fluctuations in natural gas prices, weather, interest rates, and commodity prices. All derivative financial instruments are recognized as either assets or liabilities on the balance sheets (included in "Other" or shown separately as "Risk Management Activities") and are measured at fair value. See Note 13 for additional information regarding fair value. Substantially all of the traditional electric operating companies' and Southern Power's bulk energy purchases and sales contracts that meet the definition of a derivative are excluded from fair value accounting requirements because they qualify for the "normal" scope exception, and are accounted for under the accrual method. Derivative contracts that qualify as cash flow hedges of anticipated transactions or are recoverable through the traditional electric operating companies' and the natural gas distribution utilities' fuel-hedging programs result in the deferral of related gains and losses in AOCI or regulatory assets and liabilities, respectively, until the hedged transactions occur. Other derivative contracts that qualify as fair value hedges are marked to market through current period income and are recorded on a net basis in the statements of income. Cash flows from derivatives are classified on the statements of cash flows in the same category as the hedged item. See Note 14 for additional information regarding derivatives. The Registrants offset fair value amounts recognized for multiple derivative instruments executed with the same counterparty under netting arrangements. The Registrants had no outstanding collateral repayment obligations or rights to reclaim collateral arising from derivative instruments recognized at December 31, 2023. The Registrants are exposed to potential losses related to financial instruments in the event of counterparties' nonperformance. The Registrants have established risk management policies and controls to determine and monitor the creditworthiness of counterparties in order to mitigate their exposure to counterparty credit risk. Southern Company Gas Southern Company Gas enters into weather derivative contracts as economic hedges of natural gas revenues in the event of warmer-than-normal weather in the Heating Season. Exchange-traded options are carried at fair value, with changes reflected in natural gas revenues. Non-exchange-traded options are accounted for using the intrinsic value method. Changes in the intrinsic value for non-exchange-traded contracts are also reflected in natural gas revenues in the statements of income. Southern Company Gas enters into transactions to secure transportation capacity between delivery points in order to serve its customers and various markets. NYMEX futures and OTC contracts are used to capture the price differential or spread between the locations served by the capacity to substantially protect the natural gas revenues that will ultimately be realized when the physical flow of natural gas between delivery points occurs. These contracts generally meet the definition of derivatives and are carried at fair value on the balance sheets, with changes in fair value included in earnings in the period of change. These contracts are not designated as hedges for accounting purposes. The purchase, transportation, storage, and sale of natural gas are accounted for on a weighted average cost or accrual basis, as appropriate, rather than on the fair value basis utilized for the derivatives used to mitigate the natural gas price risk associated with the storage and transportation portfolio. Monthly demand charges are incurred for the contracted storage and transportation capacity and payments associated with asset management agreements, and these demand charges and payments are recognized on the statements of income in the period they are incurred. This difference in accounting methods can result in volatility in reported earnings, even though the economic margin is substantially unchanged from the dates the transactions were consummated. Comprehensive Income The objective of comprehensive income is to report a measure of all changes in common stock equity of an enterprise that result from transactions and other economic events of the period other than transactions with owners. Comprehensive income consists of net income attributable to the Registrant, changes in the fair value of qualifying cash flow hedges, and reclassifications for amounts included in net income. Comprehensive income also consists of certain changes in pension and other postretirement benefit plans for Southern Company, Southern Power, and Southern Company Gas. AOCI (loss) balances, net of tax effects, for Southern Company, Southern Power, and Southern Company Gas were as follows:
*May not add due to rounding. Variable Interest Entities The Registrants may hold ownership interests in a number of business ventures with varying ownership structures. Partnership interests and other variable interests are evaluated to determine if each entity is a VIE. The primary beneficiary of a VIE is required to consolidate the VIE when it has both the power to direct the activities of the VIE that most significantly impact the VIE's economic performance and the obligation to absorb losses or the right to receive benefits from the VIE that could potentially be significant to the VIE. See Note 7 for additional information regarding VIEs. 2. REGULATORY MATTERS Regulatory Assets and Liabilities Details of regulatory assets and (liabilities) reflected in the balance sheets at December 31, 2023 and 2022 are provided in the following tables:
Unless otherwise noted, the following recovery and amortization periods for these regulatory assets and (liabilities) have been approved by the respective state PSC or regulatory agency: (a)AROs and other cost of removal obligations generally are recorded over the related property lives, which may range up to 64 years for Alabama Power, 56 years for Georgia Power, 55 years for Mississippi Power, and 85 years for Southern Company Gas. AROs and cost of removal obligations are settled and trued up following completion of the related activities. Alabama Power is recovering CCR ARO expenditures over a 38-year period ending in 2054 through Rate CNP Compliance. Effective January 1, 2023, Georgia Power is recovering CCR ARO expenditures over four-year periods through its ECCR tariff. Prior to 2023, expenditures were recovered over three-year periods. See "Georgia Power – Rate Plans" herein and Note 6 for additional information. (b)Recovered and amortized over the average remaining service period, which may range up to 13 years for Alabama Power and Mississippi Power and up to 14 years for Georgia Power and Southern Company Gas. Southern Company's balances also include amounts at SCS and Southern Nuclear that are allocated to the applicable regulated utilities. See Note 11 for additional information. (c)Alabama Power: Primarily represents the net book value of Plant Gorgas Unit 10 ($451 million at December 31, 2023) being amortized over 14 years (through 2037) and Plant Barry Unit 4 ($39 million at December 31, 2023) being amortized over 11 years (through 2034). See "Alabama Power – Environmental Accounting Order" herein for additional information. Georgia Power: Net book values of Plant Wansley Units 1 and 2, Plant Hammond Units 1 through 4, and Plant Branch Unit 4 (totaling $488 million, $339 million, and $8 million, respectively, at December 31, 2023) are being amortized over remaining periods between one and 12 years (between 2024 and 2035). Balance also includes unusable materials and supplies inventories, for which the Georgia PSC will determine a recovery period in a future base rate case. Mississippi Power: Represents net book value of certain environmental compliance assets at Plant Watson and Plant Greene County. The retail portion is being amortized over a 10-year period through 2030 and the wholesale portion is being amortized over a 14-year period through 2035. See "Mississippi Power – Environmental Compliance Overview Plan" herein for additional information. (d)Deferred income tax charges are recovered and deferred income tax credits are primarily amortized over the related property lives, which may range up to 64 years for Alabama Power, 56 years for Georgia Power, 55 years for Mississippi Power, and 85 years for Southern Company Gas. See Note 10 for additional information. As a result of the Tax Reform Legislation, these accounts include certain deferred income tax assets and liabilities not subject to normalization, as described further below: Alabama Power: Related amounts at December 31, 2023 include excess federal deferred income tax liabilities that are available for the benefit of customers in 2024 and/or 2025, as discussed under "Alabama Power – Excess Accumulated Deferred Income Tax Accounting Order" herein. Remaining amounts are being recovered and amortized ratably over the related property lives. Georgia Power: Related amounts include $145 million of deferred income tax assets related to construction costs for Plant Vogtle Units 3 and 4 to be recovered over a 10-year period beginning the month after Unit 4 achieves commercial operation. See "Georgia Power – Nuclear Construction – Regulatory Matters" herein for additional information on recovery of costs related to Plant Vogtle Units 3 and 4. Mississippi Power: Related amounts include retail deferred income tax liabilities ($11 million at December 31, 2023) that are expected to be fully amortized through 2024. Southern Company Gas: Related amounts include deferred income tax liabilities ($1 million at December 31, 2023) being amortized through 2024. See "Southern Company Gas – Rate Proceedings" herein for additional information. (e)Alabama Power: Balances are recorded monthly and expected to be recovered over periods of up to seven years, with the majority expected to be recovered within one year. See "Alabama Power – Rate CNP PPA," " – Rate CNP Compliance," and " – Rate ECR" herein for additional information. Georgia Power: Balances are recorded monthly and expected to be recovered or returned within two years. See "Georgia Power – Rate Plans" herein for additional information. Mississippi Power: At December 31, 2023, $12 million is expected to be recovered through various rate recovery mechanisms over a period to be determined in future rate filings. See "Mississippi Power – Ad Valorem Tax Adjustment" herein for additional information. Southern Company Gas: Balances are recorded and recovered or amortized over periods generally not exceeding five years. In addition to natural gas cost recovery mechanisms, the natural gas distribution utilities have various other cost recovery mechanisms for the recovery of costs, including those related to infrastructure replacement programs. (f)Fuel-hedging assets and liabilities are recorded over the life of the underlying hedged purchase contracts. Upon final settlement, actual costs incurred are recovered through the applicable traditional electric operating company's fuel cost recovery mechanism. Purchase contracts generally do not exceed three and a half years for Alabama Power, three years for Georgia Power, and four years for Mississippi Power. (g)Alabama Power: Represents deferred depreciation expense for Plant Barry Unit 5 ($57 million at December 31, 2023) and Plant Barry common coal assets ($24 million at December 31, 2023) to be amortized until 2036 beginning when Plant Barry Unit 5 is retired and Plant Gaston Unit 5 coal assets ($62 million at December 31, 2023) to be amortized until 2039 beginning when the assets are retired. Georgia Power: Represents deferred depreciation expense for Plant Scherer Units 1 through 3 ($70 million at December 31, 2023) to be amortized over six years beginning in 2029 and Plant Bowen Units 1 and 2 ($40 million at December 31, 2023) to be amortized over four years beginning in 2031, both as approved under Georgia Power's 2022 ARP, and Plant Vogtle Unit 3 and common facilities ($17 million at December 31, 2023) to be amortized over a 10-year period beginning the month after Plant Vogtle Unit 4 achieves commercial operation. See "Georgia Power – Nuclear Construction – Regulatory Matters" herein for additional information on recovery of costs related to Plant Vogtle Units 3 and 4. (h)Effective January 1, 2023, Georgia Power is recovering $5 million annually for environmental remediation under the 2022 ARP. Southern Company Gas' costs are recovered through environmental cost recovery mechanisms when the remediation work is performed. See Note 3 under "Environmental Remediation" for additional information. (i)Recovered over either the remaining life of the original issue or, if refinanced, over the remaining life of the new issue. At December 31, 2023, the remaining amortization periods do not exceed 24 years for Alabama Power, 29 years for Georgia Power, 18 years for Mississippi Power, and four years for Southern Company Gas. (j)Recorded as earned by employees and recovered as paid, generally within one year. Includes both vacation and banked holiday pay, if applicable. (k)Represents certain deferred operations and maintenance costs associated with software and cloud computing projects. For Alabama Power, costs are amortized ratably over the life of the related software, which ranges up to 10 years (through 2034). See "Alabama Power – Software Accounting Order" herein for additional information. For Georgia Power, costs incurred through 2022 are being amortized over five years (through 2027) and the recovery period for costs incurred after 2022 will be determined in its next base rate case. For Mississippi Power, the recovery period will be determined in Mississippi Power's annual PEP filing process. For Southern Company Gas, costs are being amortized ratably over the life of the related software, which ranges up to 10 years (through 2034). (l)Alabama Power: Effective January 1, 2023, balance is being amortized through Rate RSE over a five-year period ending in 2027. Southern Company Gas: Represents amounts related to Nicor Gas' volume balancing adjustment rider expected to be recovered over a period of less than two years. (m)See "Georgia Power – Storm Damage Recovery" herein and Note 1 under "Storm Damage and Reliability Reserves" for additional information. Mississippi Power's balance represents deferred storm costs associated with Hurricanes Ida and Zeta being recovered through PEP over a seven-year period through 2029. (n)Nuclear outage costs are deferred to a regulatory asset when incurred and amortized over a subsequent period of 18 months for Alabama Power and up to 24 months for Georgia Power. See Note 5 for additional information. (o)Recovered over the remaining lives of the original debt issuances at acquisition, which range up to 15 years at December 31, 2023. (p)Represents deferred costs of certain repairs at Atlanta Gas Light being amortized over 20 years. (q)Represents the difference between Mississippi Power's revenue requirement for Plant Daniel Units 3 and 4 under purchase accounting and operating lease accounting. At December 31, 2023, consists of the $17 million retail portion being amortized through 2039 over the remaining life of the related property and the $8 million wholesale portion being amortized through 2035. (r)At December 31, 2023, includes $9 million of regulatory assets (wholesale) expected to be fully amortized by 2035 and $2 million of regulatory liabilities (retail) expected to be fully amortized by 2024. (s)Comprised of numerous immaterial components with remaining amortization periods at December 31, 2023 generally not exceeding 20 years for Alabama Power, 10 years for Georgia Power, 14 years for Mississippi Power, and 15 years for Southern Company Gas. (t)Utilized as related expenses are incurred. See "Alabama Power – Rate NDR" and " – Reliability Reserve Accounting Order," "Georgia Power – Storm Damage Recovery," and "Mississippi Power – System Restoration Rider" and " – Reliability Reserve Accounting Order" herein and Note 1 under "Storm Damage and Reliability Reserves" for additional information. (u)Primarily includes approximately $15 million and $62 million at December 31, 2023 and 2022, respectively, for Alabama Power and $119 million at December 31, 2022 for Georgia Power as a result of each company exceeding its allowed retail return range. Georgia Power's balances also include immaterial amounts related to refunds for transmission service customers. See "Alabama Power – Rate RSE" and "Georgia Power – Rate Plans" herein for additional information. (v)Comprised of numerous immaterial components with remaining amortization periods at December 31, 2023 generally not exceeding 11 years for Alabama Power, nine years for Georgia Power, four years for Mississippi Power, and 20 years for Southern Company Gas. (w)Generally not earning a return as they are excluded from rate base or are offset in rate base by a corresponding asset or liability. Alabama Power Alabama Power's revenues from regulated retail operations are collected through various rate mechanisms subject to the oversight of the Alabama PSC. Alabama Power currently recovers its costs from the regulated retail business primarily through Rate RSE, Rate CNP, Rate ECR, and Rate NDR. In addition, the Alabama PSC issues accounting orders to address current events impacting Alabama Power. Renewable Generation Certificate Through the issuance of a Renewable Generation Certificate (RGC), Alabama Power is authorized by the Alabama PSC to procure renewable capacity and energy and to market the related energy and environmental attributes to customers and other third parties. On April 4, 2023, the Alabama PSC approved two new solar PPAs totaling 160 MWs. Upon approval of these PPAs, Alabama Power had procured solar capacity totaling approximately 490 MWs under the RGC's original 500-MW limit. On June 14, 2023, the Alabama PSC issued an order approving modifications to Alabama Power's RGC. The modifications authorized Alabama Power to procure an additional 2,400 MWs of renewable capacity and energy by June 14, 2029 and to market the related energy and environmental attributes to customers and other third parties. The modifications also increased the size of allowable renewable projects from 80 MWs to 200 MWs and increased the annual approval limit from 160 MWs to 400 MWs. Rate RSE The Alabama PSC has adopted Rate RSE that provides for periodic annual adjustments based upon Alabama Power's projected weighted common equity return (WCER) compared to an allowable range. Rate RSE adjustments are based on forward-looking information for the applicable upcoming calendar year. Rate RSE adjustments for any two-year period, when averaged together, cannot exceed 4.0% and any annual adjustment is limited to 5.0%. When the projected WCER is under the allowed range, there is an adjusting point of 5.98% and eligibility for a performance-based adder of seven basis points, or 0.07%, to the WCER adjusting point if Alabama Power (i) has an "A" credit rating equivalent with at least one of the recognized rating agencies or (ii) is in the top one-third of a designated customer value benchmark survey. Alabama Power continues to reduce growth in total debt by increasing equity, with corresponding reductions in debt issuances, thereby de-leveraging its capital structure. Alabama Power's goal is to achieve an equity ratio of approximately 55% by the end of 2025. At December 31, 2023 and 2022, Alabama Power's equity ratio was approximately 52.3% and 52.2%, respectively. Generally, during a year without a Rate RSE upward adjustment, if Alabama Power's actual WCER is between 6.15% and 7.65%, customers will receive 25% of the amount between 6.15% and 6.65%, 40% of the amount between 6.65% and 7.15%, and 75% of the amount between 7.15% and 7.65%. Customers will receive all amounts in excess of an actual WCER of 7.65%. During a year with a Rate RSE upward adjustment, if Alabama Power's actual WCER exceeds 6.15%, customers receive 50% of the amount between 6.15% and 6.90% and all amounts in excess of an actual WCER of 6.90%. Alabama Power's ability to retain a portion of the revenue that causes the actual WCER for a given year to exceed the allowed range positions Alabama Power to address the pressure on its credit quality, without increasing retail rates under Rate RSE in the near term. There is no provision for additional customer billings should the actual retail return fall below the WCER range. Retail rates under Rate RSE did not change for 2022 or 2023. For the years ended December 31, 2021, 2022, and 2023, Alabama Power's WCER exceeded 6.15%, resulting in Alabama Power establishing a current regulatory liability of $181 million, $62 million, and $15 million, respectively, for Rate RSE refunds. In accordance with an Alabama PSC order issued in February 2022, Alabama Power applied $126 million of the 2021 refund to reduce the Rate ECR under recovered balance and the remaining $55 million was refunded to customers through bill credits in July 2022. In accordance with an Alabama PSC order issued on February 7, 2023, Alabama Power refunded the 2022 amount to customers through bill credits in August 2023. The $15 million regulatory liability at December 31, 2023 will be refunded to customers through bill credits in April 2024. On December 1, 2023, Alabama Power made its required annual Rate RSE submission to the Alabama PSC of projected data for calendar year 2024. Projected earnings were within the specified range; therefore, retail rates under Rate RSE remain unchanged for 2024. Excess Accumulated Deferred Income Tax Accounting Order In December 2022, the Alabama PSC directed Alabama Power to accelerate the amortization of a regulatory liability associated with excess federal accumulated deferred income taxes. Under this order, in 2023, approximately $304 million was returned to customers through bill credits to offset the impact of the rate increase discussed under "Rate CNP Depreciation" herein. On October 3, 2023, the Alabama PSC issued an order modifying its December 2022 order and authorizing Alabama Power to (i) flow back in 2023 approximately $24 million of certain federal excess accumulated deferred income taxes resulting from the Tax Cuts and Jobs Act of 2017 and (ii) make available any remaining balance of excess accumulated deferred income taxes at the end of 2023 for the benefit of customers in 2024 and/or 2025. At December 31, 2023, the remaining balance was $81 million, of which approximately $67 million and $14 million will flow back in 2024 and 2025, respectively, for the benefit of customers. Rate CNP New Plant Rate CNP New Plant allows for recovery of Alabama Power's retail costs associated with newly developed or acquired certificated generating facilities placed into retail service. No adjustments to Rate CNP New Plant occurred during the period January 2021 through October 2022. In July 2022, the Alabama PSC approved a CCN authorizing Alabama Power to complete the acquisition of the Calhoun Generating Station. The transaction closed in September 2022 and, in October 2022, Alabama Power filed Rate CNP New Plant with the Alabama PSC to recover the related costs. The filing reflected an increase in annual revenues of $34 million, or 0.6%, effective with November 2022 billings. In 2020, the Alabama PSC approved a CCN authorizing Alabama Power to complete the acquisition of the Central Alabama Generating Station, which occurred in August 2020. Through May 2023, Alabama Power recovered substantially all costs associated with the Central Alabama Generating Station through Rate RSE, offset by revenues from a power sales agreement. Beginning in July 2022, fuel costs associated with Central Alabama Generating Station are being recovered through Rate ECR. On March 24, 2023, Alabama Power filed Rate CNP New Plant with the Alabama PSC to recover costs associated with the acquisition of the Central Alabama Generating Station. The filing reflected an annual increase in retail revenues of $78 million, or 1.1%, effective with June 2023 billings. On May 24, 2023, the Central Alabama Generating Station was placed into retail service. The Alabama PSC's 2020 CCN also authorized Alabama Power to construct an approximately 720-MW combined cycle facility at Alabama Power's Plant Barry (Plant Barry Unit 8) and the recovery of estimated in-service costs. On November 1, 2023, the unit was placed in service. On December 1, 2023, Alabama Power filed Rate CNP New Plant with the Alabama PSC to recover the related costs. The filing reflected an annual increase in retail revenues of $91 million, or 1.4%, effective with January 2024 billings. Rate CNP PPA Rate CNP PPA allows for the recovery of Alabama Power's retail costs associated with certificated PPAs. Revenues for Rate CNP PPA, as recorded on the financial statements, are adjusted for differences in actual recoverable costs and amounts billed in current regulated rates. Accordingly, changes in the billing factors will have no significant effect on Southern Company's or Alabama Power's revenues or net income but will affect annual cash flow. No adjustments to Rate CNP PPA occurred during the period 2021 through 2023 and no adjustment is expected for 2024. At December 31, 2023 and 2022, Alabama Power had an under recovered Rate CNP PPA balance of $103 million and $120 million, respectively, of which $18 million and $18 million, respectively, is included in other regulatory assets, current and $85 million and $102 million, respectively, is included in other regulatory assets, deferred on the balance sheet. Rate CNP Compliance Rate CNP Compliance allows for the recovery of Alabama Power's retail costs associated with laws, regulations, and other such mandates directed at the utility industry involving the environment, security, reliability, safety, sustainability, or similar considerations impacting Alabama Power's facilities or operations. Rate CNP Compliance is based on forward-looking information and provides for the recovery of these costs pursuant to factors that are calculated and submitted to the Alabama PSC by December 1 with rates effective for the following calendar year. Compliance costs to be recovered include operations and maintenance expenses, depreciation, and a return on certain invested capital. Revenues for Rate CNP Compliance, as recorded on the financial statements, are adjusted for differences in actual recoverable costs and amounts billed in current regulated rates. Accordingly, changes in the billing factors will have no significant effect on Southern Company's or Alabama Power's revenues or net income, but will affect annual cash flow. Changes in Rate CNP Compliance-related operations and maintenance expenses and depreciation generally will have no effect on net income. In November 2021, December 2022, and December 2023, Alabama Power submitted calculations to the Alabama PSC associated with its cost of complying with governmental mandates for the following calendar year, as provided under Rate CNP Compliance. The 2021 filing reflected a projected under recovered retail revenue requirement of approximately $59 million. In December 2021, the Alabama PSC issued a consent order that Alabama Power leave the 2021 Rate CNP Compliance factors in effect for 2022, with any prior year under collected amount deemed recovered before any current year amounts are recovered and any remaining under recovery reflected in the 2022 filing. The 2022 filing reflected a $255 million, or 3.7%, annual increase effective with January 2023 billings, primarily due to updated depreciation rates. The 2023 filing reflected a $23 million, or 0.3%, annual decrease effective with January 2024 billings. At December 31, 2023, Alabama Power had an under recovered Rate CNP Compliance balance of $33 million, of which $8 million is included in other regulatory assets, current and $25 million is included in other regulatory assets, deferred on the balances sheet, compared to an under recovered balance at December 31, 2022 of $47 million included in other regulatory assets, current on the balance sheet. Rate CNP Depreciation In December 2022, the Alabama PSC approved Rate CNP Depreciation, which allows Alabama Power to recover changes in depreciation resulting from updates to certain depreciation rates, excluding any depreciation recovered through Rate CNP New Plant, Rate CNP Compliance, or costs associated with the capitalization of asset retirement costs. Rate CNP Depreciation resulted in an annual revenue increase of approximately $318 million, or 4.6%, effective with January 2023 billings. See "Excess Accumulated Deferred Income Tax Accounting Order" herein for information related to 2023 customer bill credits approved by the Alabama PSC. Rate ECR Rate ECR recovers Alabama Power's retail energy costs based on an estimate of future energy costs and the current over or under recovered balance. Revenues recognized under Rate ECR and recorded on the financial statements are adjusted for the difference in actual recoverable fuel costs and amounts billed in current regulated rates. The difference in the recoverable fuel costs and amounts billed gives rise to the over or under recovered amounts recorded as regulatory assets or liabilities. Alabama Power, along with the Alabama PSC, continually monitors the over or under recovered cost balance to determine whether an adjustment to billing rates is required. Changes in the Rate ECR factor have no significant effect on Southern Company's or Alabama Power's net income but will impact the related operating cash flows. The Alabama PSC may approve billing rates under Rate ECR of up to 5.910 cents per KWH. The Alabama PSC approved adjustments to Rate ECR from 1.960 cents per KWH to 2.557 cents per KWH, or approximately $310 million annually, effective with August 2022 billings and from 2.557 cents per KWH to 3.510 cents per KWH, or approximately $500 million annually, effective with December 2022 billings. On November 9, 2023, the Alabama PSC approved a decrease to Rate ECR from 3.510 cents per KWH to 3.270 cents per KWH, or approximately $126 million annually, effective with December 2023 billings. The rate will adjust to 5.910 cents per KWH in January 2025 absent a further order from the Alabama PSC. At December 31, 2023 and 2022, Alabama Power's under recovered fuel costs totaled $246 million and $622 million, respectively, of which $246 million and $102 million, respectively, is included in regulatory assets – under recovered retail fuel clause revenues and $520 million of the December 31, 2022 balance is included in other regulatory assets, deferred on the balance sheets. These classifications are based on estimates, which include such factors as weather, generation availability, energy demand, and the price of energy. A change in any of these factors could have a significant impact on the timing of any recovery or return of fuel costs. Software Accounting Order The Alabama PSC authorizes Alabama Power to establish a regulatory asset for operations and maintenance costs associated with software implementation projects. The regulatory asset is amortized ratably over the life of the related software. At December 31, 2023 and 2022, the regulatory asset balance totaled $59 million and $46 million, respectively, and is included in other regulatory assets, deferred on the balance sheet. Plant Greene County Alabama Power jointly owns Plant Greene County with an affiliate, Mississippi Power. See Note 5 under "Joint Ownership Agreements" for additional information. In 2021, the Mississippi PSC concluded its review of Mississippi Power's 2021 IRP, which included a schedule to retire Mississippi Power's 40% ownership interest in Plant Greene County Units 1 and 2 in December 2025 and 2026, respectively, consistent with each unit's remaining useful life. Alabama Power and Mississippi Power have continued to evaluate operating conditions and business needs relevant to the anticipated retirement of Plant Greene County and now expect the units to remain in service beyond the previously indicated dates. The Plant Greene County unit retirements require the completion by Alabama Power of transmission and system reliability improvements, as well as agreement by Alabama Power. The ultimate outcome of this matter cannot be determined at this time. See "Mississippi Power – Integrated Resource Plan" herein for additional information. Rate NDR Based on an order from the Alabama PSC, Alabama Power maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate NDR charge to customers consisting of two components. The first component is intended to establish and maintain a reserve balance for future storms and is an on-going part of customer billing. When the reserve balance falls below $50 million, a reserve establishment charge will be activated (and the on-going reserve maintenance charge concurrently suspended) until the reserve balance reaches $75 million. The second component of the Rate NDR charge is intended to allow recovery of any existing deferred storm-related operations and maintenance costs and any future reserve deficits over a 48-month period (24-month period prior to modifications approved by the Alabama PSC in July 2022). The Alabama PSC order gives Alabama Power authority to record a deficit balance in the NDR when costs of storm damage exceed any established reserve balance. The maximum total Rate NDR charge was limited to $10.00 per month per non-residential customer account and $5.00 per month per residential customer account through July 12, 2022. Subsequently, modifications approved by the Alabama PSC replaced the maximum total Rate NDR charge with a maximum charge to recover a deficit of $5 per month per non-residential customer account and $2.50 per month per residential customer account. Alabama Power has the authority, based on an order from the Alabama PSC, to accrue certain additional amounts as circumstances warrant, which can be used to offset storm charges. Alabama Power made an additional accrual of $65 million in 2021. Alabama Power collected approximately $12 million, $14 million, and $6 million in 2023, 2022, and 2021, respectively, under Rate NDR. Beginning with August 2022 billings, the reserve establishment charge was suspended and the reserve maintenance charge was activated as a result of the NDR balance exceeding $75 million. Alabama Power expects to collect approximately $12 million annually under Rate NDR unless the NDR balance falls below $50 million. At December 31, 2023 and 2022, the NDR balance was $76 million and $97 million, respectively, and is included in other regulatory liabilities, deferred on the balance sheets. As revenue from the Rate NDR charge is recognized, an equal amount of operations and maintenance expenses related to the NDR will also be recognized. As a result, the Rate NDR charge will not have an effect on net income but will impact operating cash flows. Reliability Reserve Accounting Order In July 2022, the Alabama PSC approved an accounting order authorizing Alabama Power to create a reliability reserve separate from the NDR and transition the previous Rate NDR authority related to reliability expenditures to the reliability reserve. Alabama Power may make accruals to the reliability reserve if the NDR balance exceeds $35 million. At December 31, 2023 and 2022, Alabama Power accrued $52 million and $166 million, respectively, to the reserve. On July 11, 2023, the Alabama PSC issued an order authorizing Alabama Power to expand the existing authority of its reliability reserve to include certain production-related expenses that are intended to maintain reliability in between scheduled generating unit maintenance outages. On August 18, 2023, Alabama Power notified the Alabama PSC of its intent to use a portion of its reliability reserve balance in 2023. During the fourth quarter 2023, Alabama Power used $75 million of the reliability reserve for reliability-related transmission, distribution, and generation expenses and nuclear production-related expenses. At December 31, 2023 and 2022, Alabama Power's reliability reserve balance was $143 million and $166 million, respectively, and is included in other regulatory liabilities, deferred on the balance sheets. Environmental Accounting Order Based on an order from the Alabama PSC (Environmental Accounting Order), Alabama Power is authorized to establish a regulatory asset to record the unrecovered investment costs, including the unrecovered plant asset balance and the unrecovered costs associated with site removal and closure associated with future unit retirements caused by environmental regulations. The regulatory asset is amortized and recovered over the affected unit's remaining useful life, as established prior to the decision regarding early retirement, through Rate CNP Compliance. With the completion of the Calhoun Generating Station acquisition, Alabama Power expected to retire Plant Barry Unit 5 in late 2023 or early 2024, subject to certain operating conditions. In September 2022, Alabama Power reclassified approximately $600 million for Plant Barry Unit 5 from plant in service, net of depreciation to other utility plant, net and will continue to depreciate the asset according to the original depreciation rates. Alabama Power has continued to evaluate operating conditions relevant to the expected retirement of Plant Barry Unit 5 and now expects to retire the unit on or before December 31, 2028. At retirement, Alabama Power will reclassify the remaining net investment costs of the unit to a regulatory asset to be recovered over the unit's remaining useful life, as established prior to the decision to retire, through Rate CNP Compliance. See "Rate CNP New Plant" herein for additional information. In December 2022, in conjunction with Alabama Power's compliance plan for the EPA's final steam electric ELG reconsideration rule, Plant Barry Unit 4 ceased using coal and began operating solely on natural gas. As a result, approximately $42 million of plant in service, net of depreciation was reclassified to a regulatory asset to be recovered through Rate CNP Compliance through 2034, the unit's remaining useful life. Georgia Power Georgia Power's revenues from regulated retail operations are collected through various rate mechanisms subject to the oversight of the Georgia PSC. Georgia Power recovers its costs from the regulated retail business through traditional base tariffs, Demand-Side Management (DSM) tariffs, the ECCR tariff, and Municipal Franchise Fee (MFF) tariffs. These tariffs were set under the 2019 ARP for the years 2020 through 2022 and under the 2022 ARP for the years 2023 through 2025 as described herein. In addition, fuel costs are collected through a separate fuel cost recovery tariff. See "Nuclear Construction – Regulatory Matters" herein for information regarding the approved recovery through retail base rates of certain costs related to Plant Vogtle Unit 3 and the common facilities shared between Plant Vogtle Units 3 and 4 (Common Facilities) that became effective August 1, 2023 based on the in-service date of July 31, 2023 for Unit 3, as well as the base rate adjustments that will occur the first day of the month after Unit 4 achieves commercial operation. Financing costs on certified construction costs of Plant Vogtle Units 3 and 4 that are not included in rate base are being collected through Georgia Power's NCCR tariff. When the base rate adjustments occur following commercial operation of Unit 4, the NCCR tariff will cease to be collected and financing costs will be included in Georgia Power's general retail revenue requirements. See "Nuclear Construction" herein for additional information on Plant Vogtle Units 3 and 4. Rate Plans 2022 ARP In December 2022, the Georgia PSC voted to approve the 2022 ARP, under which Georgia Power increased its rates on January 1, 2023. On November 16, 2023, the Georgia PSC approved tariff adjustments effective January 1, 2024. Details of tariff adjustments are provided in the following table:
Under the 2022 ARP, Georgia Power will adjust traditional base, ECCR, DSM, and MFF rates effective January 1, 2025, with the incremental revenue requirements related to DSM tariffs and CCR AROs subject to updates through annual compliance filings to be made at least 90 days prior to the effective date. In the 2022 ARP, the Georgia PSC approved recovery through the ECCR tariff of estimated CCR ARO compliance costs for 2023, 2024, and 2025 over four-year periods beginning January 1 of each respective year, with recovery of construction contingency beginning in the year following actual expenditures, resulting in $60 million and $20 million reductions in the related amortization expense for 2024 and 2023, respectively. Compliance costs incurred were $300 million in 2023 and are expected to be $305 million and $330 million in 2024 and 2025, respectively. The CCR ARO costs are expected to be revised for actual expenditures and updated estimates through future annual compliance filings. Further, under the 2022 ARP, Georgia Power's retail ROE is set at 10.50% and its equity ratio is set at 56%. Earnings will be evaluated against a retail ROE range of 9.50% to 11.90%. Any retail earnings above 11.90% will be shared, with 40% being applied to reduce regulatory assets, 40% directly refunded to customers, and the remaining 20% retained by Georgia Power. There will be no recovery of any earnings shortfall below 9.50% on an actual basis. However, if at any time during the term of the 2022 ARP, Georgia Power projects that its retail earnings will be below 9.50% for any calendar year, it may petition the Georgia PSC for implementation of the Interim Cost Recovery (ICR) tariff to adjust Georgia Power's retail rates to achieve a 9.50% ROE. The Georgia PSC would have 90 days to rule on Georgia Power's request. The ICR tariff would expire at the earlier of January 1, 2026 or the end of the calendar year in which the ICR tariff becomes effective. In lieu of requesting implementation of an ICR tariff, or if the Georgia PSC chooses not to implement the ICR tariff, Georgia Power may file a full rate case. In 2023, Georgia Power's retail ROE was within the allowed retail ROE range. Except as provided above, Georgia Power will not file for a general base rate increase while the 2022 ARP is in effect. Georgia Power is required to file a general base rate case by July 1, 2025, in response to which the Georgia PSC would be expected to determine whether the 2022 ARP should be continued, modified, or discontinued. 2019 ARP The Georgia PSC approved the following tariff adjustments under the 2019 ARP effective January 1 2022:
In the 2019 ARP, the Georgia PSC approved recovery through the ECCR tariff of the estimated under recovered balance of CCR ARO compliance costs. Under the 2019 ARP, the under recovered balance at December 31, 2019 and compliance costs for 2020 were recovered over the three-year period ended December 31, 2022. Recovery of estimated compliance costs for 2021 and 2022 are being recovered over four-year periods beginning January 1 of each respective year, as authorized under the 2019 ARP and modified under the 2022 ARP, with recovery of construction contingency beginning in the year following actual expenditure. The CCR ARO costs recovered through the ECCR tariff are revised for actual expenditures and updated estimates through annual compliance filings, which resulted in an approximate $10 million increase effective January 1, 2022 in the related cost recovery. Georgia Power's retail ROE under the 2019 ARP was set at 10.50% and earnings were evaluated against a retail ROE range of 9.50% to 12.00%. Any retail earnings above 12.00% were shared, with 40% applied to reduce regulatory assets, 40% directly refunded to customers, and the remaining 20% retained by Georgia Power. In 2020, Georgia Power's retail ROE was within the allowed retail ROE range. In 2021, Georgia Power's retail ROE exceeded 12.00%, and Georgia Power reduced regulatory assets by approximately $5 million and accrued approximately $5 million which was refunded to customers in 2022. In 2022, Georgia Power's retail ROE exceeded 12.00%, and Georgia Power reduced regulatory assets by $117 million and refunded $117 million to customers through bill credits in the first quarter 2023. Integrated Resource Plans In July 2022, the Georgia PSC approved Georgia Power's 2022 IRP, as modified by a stipulated agreement among Georgia Power, the staff of the Georgia PSC, and certain intervenors and as further modified by the Georgia PSC. In the 2022 IRP decision, the Georgia PSC approved, among other things, the certification of six PPAs (including five affiliate PPAs with Southern Power that are subject to approval by the FERC) with capacities of 1,567 MWs beginning in 2024, 380 MWs beginning in 2025, and 228 MWs beginning in 2028, procured through RFPs authorized in the 2019 IRP. See Note 9 for additional information. On October 27, 2023, Georgia Power filed an updated IRP (2023 IRP Update) with the Georgia PSC, which sets forth a plan to support the recent increase in the state of Georgia's projected energy needs since the 2022 IRP. In the 2023 IRP Update, Georgia Power requested the following: *Authority to develop, own, and operate up to 1,400 MWs from three simple cycle combustion turbines at Plant Yates. *Certification of an affiliate PPA with Mississippi Power for 750 MWs, which began January 1, 2024 and will continue through December 2028. *Certification of a non-affiliate PPA for 230 MWs starting the month after conclusion of the 2023 IRP Update proceeding continuing through December 2028. *Authority to develop, own, and operate up to 1,000 MWs of battery energy storage system facilities, including storage systems collocated with existing and new Georgia Power-owned solar facilities. *Approval of transmission projects necessary to support the generation resources requested in the 2023 IRP Update. The 2023 IRP Update assumes a retirement date at the end of 2035 for Plant Bowen Units 1 and 2 (1,400 MWs). Georgia Power expects to make a formal recommendation in the 2025 IRP on the retirement or continued operations for Plant Bowen Units 1 and 2, as well as evaluate extending the operation of Plant Scherer Unit 3 (614 MWs based on 75% ownership) and Plant Gaston Units 1 through 4 (500 MWs based on 50% ownership through SEGCO) beyond the retirement dates in 2028 that were approved in the 2022 IRP. See Note 7 under "SEGCO" for additional information. Georgia Power expects the Georgia PSC to render a final decision on the 2023 IRP Update on April 16, 2024. On January 12, 2024, Georgia Power entered into an Agreement for Engineering, Procurement, and Construction with Mitsubishi Power Americas, Inc. and Black & Veatch Construction, Inc. to construct three 442-MW simple cycle combustion turbine units at Plant Yates (Plant Yates Units 8, 9, and 10), which are expected to be placed in service in the fourth quarter 2026, the second quarter 2027, and the third quarter 2027, respectively. See Note 17 under "Georgia Power – Integrated Resource Plans" for additional information. The ultimate outcome of these matters cannot be determined at this time. In August 2022, Restore Chattooga Gorge Coalition (RCG) filed a petition in the Superior Court of Fulton County, Georgia against Georgia Power and the Georgia PSC. The petition challenged Georgia Power's plan to expend $115 million to modernize Plant Tugalo (a hydro facility), as approved in the 2019 IRP, and sought judicial review of the Georgia PSC's order in the 2022 IRP proceeding with respect to the denial of RCG's challenge to the modernization plan. On October 23, 2023, the court granted Georgia Power's and the Georgia PSC's motions to dismiss the RCG petition. This matter is now concluded. Fuel Cost Recovery Georgia Power has established fuel cost recovery rates approved by the Georgia PSC. During the second half of 2021, the price of natural gas rose significantly and resulted in an under recovered fuel balance exceeding $200 million. Therefore, in November 2021, the Georgia PSC voted to approve Georgia Power's interim fuel rider, which increased fuel rates by 15%, or approximately $252 million annually, effective January 1, 2022. During 2022, Georgia Power's under recovered fuel balance continued to increase significantly due to higher fuel and purchased power costs. On May 16, 2023, the Georgia PSC approved a stipulation agreement between Georgia Power and the staff of the Georgia PSC to increase annual fuel billings by 54%, or approximately $1.1 billion, effective June 1, 2023. The increase includes a three-year recovery period for $2.2 billion of Georgia Power's under recovered fuel balance at May 31, 2023. Under the approved stipulation agreement, Georgia Power is allowed to adjust its fuel cost recovery rates under an interim fuel rider prior to the next fuel case, subject to a maximum 40% cumulative change, if its under or over recovered fuel balance accumulated since May 31, 2023 exceeds $200 million. Georgia Power is scheduled to file its next fuel case no later than February 28, 2026. Georgia Power's under recovered fuel balance totaled $1.9 billion at December 31, 2023, of which $694 million is included in under recovered fuel clause revenues and under recovered retail fuel clause revenues on Southern Company's and Georgia Power's balance sheets, respectively, and $1.2 billion is included in deferred under recovered retail fuel clause revenues on Southern Company's and Georgia Power's balance sheets. The under recovered fuel balance totaled $2.1 billion at December 31, 2022 and is included in deferred under recovered retail fuel clause revenues on Southern Company's and Georgia Power's balance sheets. Georgia Power's fuel cost recovery mechanism includes costs associated with a natural gas hedging program, as revised and approved by the Georgia PSC, allowing the use of an array of derivative instruments within a 36-month time horizon. Fuel cost recovery revenues as recorded on the financial statements are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on Southern Company's or Georgia Power's revenues or net income but will affect operating cash flows. Storm Damage Recovery Georgia Power defers and recovers certain costs related to damages from major storms as mandated by the Georgia PSC. During 2021 and 2022, Georgia Power recovered $213 million annually under the 2019 ARP. Beginning January 1, 2023, Georgia Power is recovering $31 million annually under the 2022 ARP. At December 31, 2022, Georgia Power's storm damage reserve balance was $83 million and is included in other regulatory liabilities, deferred on Southern Company's balance sheet and other deferred credits and liabilities on Georgia Power's balance sheet. During 2023, significant storms caused damage to Georgia Power's transmission and distribution facilities. The incremental restoration costs related to these storms exceeded the storm damage reserve and were deferred in the regulatory asset for storm damage. At December 31, 2023, Georgia Power's regulatory asset balance related to storm damage was $54 million, of which $31 million is included in other regulatory assets, current and $23 million is included in other regulatory assets, deferred on Southern Company's and Georgia Power's balance sheets. The rate of storm damage cost recovery is expected to be adjusted in future regulatory proceedings as necessary. As a result of this regulatory treatment, costs related to storms are not expected to have a material impact on Southern Company's or Georgia Power's net income but do impact the related operating cash flows. See Note 1 under "Storm Damage and Reliability Reserves" for additional information. Nuclear Construction In 2009, the Georgia PSC certified construction of Plant Vogtle Units 3 and 4, in which Georgia Power holds a 45.7% ownership interest. In 2012, the NRC issued the related combined construction and operating licenses, which allowed full construction of the two AP1000 nuclear units (with electric generating capacity of approximately 1,100 MWs each) and related facilities to begin. Until March 2017, construction on Plant Vogtle Units 3 and 4 continued under the Vogtle 3 and 4 Agreement, which was a substantially fixed price agreement. In connection with the EPC Contractor's bankruptcy filing in March 2017, Georgia Power, acting for itself and as agent for the other Vogtle Owners, entered into several transitional arrangements to allow construction to continue. In July 2017, Georgia Power, acting for itself and as agent for the other Vogtle Owners, entered into the Vogtle Services Agreement, whereby Westinghouse provides facility design and engineering services, procurement and technical support, and staff augmentation on a time and materials cost basis. The Vogtle Services Agreement provides that it will continue until the start-up and testing of Plant Vogtle Units 3 and 4 are complete and electricity is generated and sold from both units. In October 2017, Georgia Power, acting for itself and as agent for the other Vogtle Owners, executed the Bechtel Agreement, under which Bechtel is reimbursed for actual costs plus a base fee and an at-risk fee, subject to adjustment based on Bechtel's performance against cost and schedule targets. Each Vogtle Owner is severally (not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to Bechtel under the Bechtel Agreement. See Note 8 under "Long-term Debt – DOE Loan Guarantee Borrowings" for information on the Amended and Restated Loan Guarantee Agreement, including applicable covenants, events of default, and mandatory prepayment events. Cost and Schedule Georgia Power's approximate proportionate share of the remaining estimated capital cost to complete Plant Vogtle Units 3 and 4, including contingency, through the second quarter 2024 is as follows:
(*)Includes approximately $610 million of costs that are not shared with the other Vogtle Owners, including $33 million of construction monitoring costs, and approximately $567 million of incremental costs under the cost-sharing provisions of the joint ownership agreements described below. Excludes financing costs expected to be capitalized through AFUDC of approximately $440 million, of which $417 million had been accrued through December 31, 2023. (*)Net of $1.7 billion received from Toshiba under the Guarantee Settlement Agreement and approximately $188 million in related customer refunds. Georgia Power estimates that its financing costs for construction of Plant Vogtle Units 3 and 4 will total approximately $3.53 billion, of which $3.50 billion had been incurred through December 31, 2023. Georgia Power placed Unit 3 in service on July 31, 2023. As part of its ongoing processes, Southern Nuclear continues to evaluate cost and schedule forecasts for Unit 4 on a regular basis to incorporate current information available, particularly in the areas of start-up testing and related test results and engineering support. As of December 31, 2023, based on completion of construction work and the assessment of start-up and pre-operational testing remaining, Southern Nuclear has an estimated $36 million for construction contingency remaining in the estimate to complete. This contingency is projected to be allocated in the future to address any further Unit 4 schedule extensions or remediation of other issues discovered during start-up testing. Hot functional testing for Unit 4 was completed on May 1, 2023. On July 20, 2023, Southern Nuclear announced that all Unit 4 ITAACs had been submitted to the NRC, and, on July 28, 2023, the NRC published its 103(g) finding that the accepted criteria in the combined license for Unit 4 had been met, which allowed nuclear fuel to be loaded and start-up testing to begin. Fuel load for Unit 4 was completed on August 19, 2023. On October 6, 2023, Georgia Power announced that during start-up and pre-operational testing for Unit 4, Southern Nuclear identified a motor fault in one of four reactor coolant pumps (RCPs). This RCP was replaced with an on-site spare RCP from inventory. On February 1, 2024, Georgia Power announced that during start-up and pre-operational testing for Unit 4, Southern Nuclear identified, and has remediated, vibrations associated with certain piping within the cooling system. Considering the remaining pre-operational testing, Unit 4 is projected to be placed in service during the second quarter 2024. On February 14, 2024, Unit 4 achieved self-sustaining nuclear fission, commonly referred to as initial criticality. With Unit 3's four RCPs operating as designed, Southern Nuclear believes that the motor fault on this single Unit 4 RCP is an isolated event. However, any findings related to the root cause of the motor fault on the single Unit 4 RCP could require engineering changes or remediation related to the other seven Unit 3 and Unit 4 RCPs. The projected schedule for Unit 4 significantly depends on the progression of start-up and pre-operational testing, which may be impacted by equipment or other operational failures. As Unit 4 progresses further through testing, ongoing and potential future challenges may also include the management of contractors and vendors; the availability of materials and parts, and/or related cost escalation; the availability of supervisory and technical support resources; and the timeframe and duration of pre-operational testing. New challenges also may continue to arise as Unit 4 moves further into testing and start-up, which may result in required engineering changes or remediation related to plant systems, structures, or components (some of which are based on new technology that only within the last several years began initial operation in the global nuclear industry at this scale). These challenges may result in further schedule delays and/or cost increases. With the receipt of the NRC's 103(g) findings for Units 3 and 4 in August 2022 and July 2023, respectively, the site is subject to the NRC's operating reactor oversight process and must meet applicable technical and operational requirements contained in its operating license. Various design and other licensing-based compliance matters may result in additional license amendment requests or require other resolution. If any license amendment requests or other licensing-based compliance issues are not resolved in a timely manner, there may be delays in the Unit 4 project schedule that could result in increased costs. The ultimate outcome of these matters cannot be determined at this time. However, any extension of the in-service date beyond June 2024 for Unit 4, including the joint owner cost sharing impacts described below, is estimated to result in additional base capital costs for Georgia Power of up to $25 million per month as well as any additional related construction, support resources, or testing costs. Pursuant to the regulatory orders discussed below, any further changes to the capital cost forecast will not be recoverable through regulated rates and will be required to be charged to income. Such charges could be material. See Note 17 under "Georgia Power – Nuclear Construction" for additional information. Joint Owner Contracts In November 2017, the Vogtle Owners entered into an amendment to their joint ownership agreements for Plant Vogtle Units 3 and 4 to provide for, among other conditions, additional Vogtle Owner approval requirements. Effective in August 2018, the Vogtle Owners further amended the joint ownership agreements to clarify and provide procedures for certain provisions of the joint ownership agreements related to adverse events that require the vote of the holders of at least 90% of the ownership interests in Plant Vogtle Units 3 and 4 to continue construction (as amended, and together with the November 2017 amendment, the Vogtle Joint Ownership Agreements). The Vogtle Joint Ownership Agreements also confirm that the Vogtle Owners' sole recourse against Georgia Power or Southern Nuclear for any action or inaction in connection with their performance as agent for the Vogtle Owners is limited to removal of Georgia Power and/or Southern Nuclear as agent, except in cases of willful misconduct. Amendments to the Vogtle Joint Ownership Agreements In connection with a September 2018 vote by the Vogtle Owners to continue construction, Georgia Power entered into (i) a binding term sheet (Vogtle Owner Term Sheet) with the other Vogtle Owners and MEAG Power's wholly-owned subsidiaries MEAG Power SPVJ, LLC (MEAG SPVJ), MEAG Power SPVM, LLC (MEAG SPVM), and MEAG Power SPVP, LLC (MEAG SPVP) to take certain actions which partially mitigate potential financial exposure for the other Vogtle Owners, including additional amendments to the Vogtle Joint Ownership Agreements and the purchase of PTCs from the other Vogtle Owners at pre-established prices, and (ii) a term sheet (MEAG Term Sheet) with MEAG Power and MEAG SPVJ to provide up to $300 million of funding with respect to MEAG SPVJ's ownership interest in Plant Vogtle Units 3 and 4 under certain circumstances. In January 2019, Georgia Power, MEAG Power, and MEAG SPVJ entered into an agreement to implement the provisions of the MEAG Term Sheet. In February 2019, Georgia Power, the other Vogtle Owners, and MEAG Power's wholly-owned subsidiaries MEAG SPVJ, MEAG SPVM, and MEAG SPVP entered into certain amendments to the Vogtle Joint Ownership Agreements to implement the provisions of the Vogtle Owner Term Sheet (Global Amendments). Pursuant to the Global Amendments: (i) each Vogtle Owner paid its proportionate share of qualifying construction costs for Plant Vogtle Units 3 and 4 based on its ownership percentage up to the estimated cost at completion (EAC) for Plant Vogtle Units 3 and 4, of which Georgia Power's share is $8.4 billion (VCM 19 Forecast Amount), plus $800 million; (ii) Georgia Power was responsible for 55.7% of actual qualifying construction costs between $800 million and $1.6 billion over the VCM 19 Forecast Amount (resulting in $80 million of potential additional costs to Georgia Power), with the remaining Vogtle Owners responsible for 44.3% of such costs pro rata in accordance with their respective ownership interests; and (iii) Georgia Power was responsible for 65.7% of qualifying construction costs between $1.6 billion and $2.1 billion over the VCM 19 Forecast Amount (resulting in a further $100 million of potential additional costs to Georgia Power), with the remaining Vogtle Owners responsible for 34.3% of such costs pro rata in accordance with their respective ownership interests. The Global Amendments provide that if the EAC was revised and exceeded the VCM 19 Forecast Amount by more than $2.1 billion, each of the other Vogtle Owners had a one-time option at the time the project budget cost forecast was so revised to tender a portion of its ownership interest to Georgia Power in exchange for Georgia Power's agreement to pay 100% of such Vogtle Owner's remaining share of total construction costs in excess of the VCM 19 Forecast Amount plus $2.1 billion. In addition, pursuant to the Global Amendments, the holders of at least 90% of the ownership interests in Plant Vogtle Units 3 and 4 must vote to continue construction if certain adverse events (Project Adverse Events) occur, including, among other events: (i) the bankruptcy of Toshiba; (ii) the termination or rejection in bankruptcy of certain agreements, including the Vogtle Services Agreement, the Bechtel Agreement, or the agency agreement with Southern Nuclear; (iii) Georgia Power's public announcement of its intention not to submit for rate recovery any portion of its investment in Plant Vogtle Units 3 and 4 or the Georgia PSC determines that any of Georgia Power's costs relating to the construction of Plant Vogtle Units 3 and 4 will not be recovered in retail rates, excluding any additional amounts paid by Georgia Power on behalf of the other Vogtle Owners pursuant to the Global Amendments described above and the first 6% of costs during any six-month VCM reporting period that are disallowed by the Georgia PSC for recovery, or for which Georgia Power elects not to seek cost recovery, through retail rates; and (iv) an incremental extension of one year or more from the seventeenth VCM report estimated in-service dates of November 2021 and November 2022 for Units 3 and 4, respectively. The schedule extension announced in February 2022 triggered the requirement for a vote to continue construction and all the Vogtle Owners voted to continue construction. The filing of Georgia Power's prudency application with the Georgia PSC, which included Georgia Power's public announcement of its intention not to submit for rate recovery an amount that is greater than the first 6% of costs during any six-month VCM reporting period, triggered the requirement for a vote to continue construction and all the Vogtle Owners voted to continue construction. See additional information on Georgia Power's prudency application filing below. In September 2022, Georgia Power and MEAG Power reached an agreement to resolve a dispute regarding the cost-sharing and tender provisions of the Global Amendments. Under the terms of the agreement, among other items, (i) MEAG Power will not exercise its tender option and will retain its full ownership interest in Plant Vogtle Units 3 and 4; (ii) Georgia Power will reimburse a portion of MEAG Power's costs of construction for Plant Vogtle Units 3 and 4 as such costs are incurred and with no further adjustment for force majeure costs, which payments will total approximately $92 million based on the current project capital cost forecast; and (iii) Georgia Power will reimburse 20% of MEAG Power's costs of construction with respect to any amounts over the current project capital cost forecast, with no further adjustment for force majeure costs. In addition, MEAG Power agreed to vote to continue construction upon occurrence of a Project Adverse Event unless the commercial operation date of either of Plant Vogtle Unit 3 or Unit 4 is not projected to occur by December 31, 2025. On October 5, 2023 and October 17, 2023, Georgia Power reached agreements with OPC and Dalton, respectively, to resolve its respective dispute with each of OPC and Dalton regarding the cost-sharing and tender provisions of the Global Amendments. Under the terms of the agreements with OPC and Dalton, among other items, (i) each of OPC and Dalton retracted its exercise of the tender option and will retain its full ownership interest in Plant Vogtle Units 3 and 4, (ii) Georgia Power made payments immediately after execution of the agreements of $308 million and $17 million to OPC and Dalton, respectively, representing payment for a portion of each of OPC's and Dalton's costs of construction for Plant Vogtle Units 3 and 4 previously incurred, (iii) Georgia Power will pay a portion of each of OPC's and Dalton's further costs of construction for Plant Vogtle Units 3 and 4 as such costs are incurred and with no further adjustment for force majeure costs, which payments will be in an aggregate amount of approximately $105 million and $6 million for OPC and Dalton, respectively, based on the current project capital cost forecast, and (iv) Georgia Power will pay 66% of each of OPC's and Dalton's costs of construction with respect to any amounts above the current project capital cost forecast, with no further adjustment for force majeure costs. Georgia Power recorded pre-tax charges to income through the fourth quarter 2022 of $407 million ($304 million after tax) associated with the cost-sharing provisions of the Global Amendments, including the settlement with MEAG Power. Based on the current project capital cost forecast and the settlements with OPC and Dalton described above, Georgia Power recorded a pre-tax charge to income of approximately $160 million ($120 million after tax) in the third quarter 2023. These charges are included in the total project capital cost forecast and will not be recovered from retail customers. The ultimate impact of these matters on the project capital cost forecast for Plant Vogtle Units 3 and 4 cannot be determined at this time. Regulatory Matters In 2009, the Georgia PSC voted to certify construction of Plant Vogtle Units 3 and 4 with a certified capital cost of $4.418 billion. In addition, in 2009 the Georgia PSC approved inclusion of the Plant Vogtle Units 3 and 4 related CWIP accounts in rate base, and the State of Georgia enacted the Georgia Nuclear Energy Financing Act, which allows Georgia Power to recover financing costs for Plant Vogtle Units 3 and 4. Financing costs are recovered on all applicable certified costs through annual adjustments to the NCCR tariff up to the certified capital cost of $4.418 billion. At December 31, 2023, Georgia Power had recovered approximately $3.0 billion of financing costs. Financing costs related to capital costs above $4.418 billion up to $7.562 billion approved for recovery as described below are being recognized through AFUDC and will be recovered through retail rates over the life of Plant Vogtle Units 3 and 4; however, Georgia Power is not recording AFUDC related to any capital costs in excess of $7.562 billion. In December 2022, the Georgia PSC approved Georgia Power's filing to increase the NCCR tariff by $36 million annually, effective January 1, 2023. On November 1, 2023, Georgia Power filed a request to continue for 2024 the NCCR tariff that was effective during 2023. The staff of the Georgia PSC accepted the proposal and no further approval from the Georgia PSC was required. See additional information below on AFUDC and the NCCR tariff following commercial operation of Unit 4. In 2016, the Georgia PSC voted to approve a settlement agreement (Vogtle Cost Settlement Agreement) resolving certain prudency matters in connection with the fifteenth VCM report. In January 2018, the Georgia PSC issued an order approving Georgia Power's seventeenth VCM report and modified the Vogtle Cost Settlement Agreement. The Vogtle Cost Settlement Agreement, as modified by the January 2018 order, resolved certain regulatory matters related to Plant Vogtle Units 3 and 4 including, but not limited to: (i) a revised capital cost forecast of $7.3 billion (after reflecting the impact of payments received under the Guarantee Settlement Agreement and related customer refunds) was found reasonable; (ii) confirmed that a prudence proceeding on cost recovery would occur following Unit 4 fuel load, consistent with applicable Georgia law; (iii) reduced the ROE used to calculate the NCCR tariff (a) from 10.95% (the ROE rate setting point authorized by the Georgia PSC at that time) to 10.00% effective January 1, 2016, (b) from 10.00% to 8.30%, effective January 1, 2020, and (c) from 8.30% to 5.30%, effective January 1, 2021 (provided that the ROE in no case will be less than Georgia Power's average cost of long-term debt); and (iv) reduced the ROE used for AFUDC equity for Plant Vogtle Units 3 and 4 from 10.00% to Georgia Power's average cost of long-term debt, effective January 1, 2018. The January 2018 order also stated that if Plant Vogtle Units 3 and 4 are not commercially operational by June 1, 2021 and June 1, 2022, respectively, the ROE used to calculate the NCCR tariff will be further reduced by 10 basis points each month (but not lower than Georgia Power's average cost of long-term debt) until the respective Unit is commercially operational. The ROE reductions negatively impacted earnings by approximately $310 million, $300 million, and $270 million in 2023, 2022, and 2021, respectively, and are estimated to have a negative earnings impact of approximately $90 million in 2024. In 2021, the Georgia PSC approved an order under which Georgia Power would include in rate base an allocation of $2.1 billion to Plant Vogtle Unit 3 and the Common Facilities from the $3.6 billion of Plant Vogtle Units 3 and 4 costs previously deemed prudent by the Georgia PSC and would recover the related depreciation expense through retail base rates effective the month after Unit 3 is placed in service. In compliance with the Georgia PSC order, Georgia Power increased annual retail base rates by $318 million effective August 1, 2023 based on the in-service date of July 31, 2023 for Unit 3. The related increase in annual retail base rates included recovery of all projected operations and maintenance expenses for Unit 3 and the Common Facilities and other related costs of operation, partially offset by the related PTCs. Financing costs (debt and equity) on the remaining portion of the total Unit 3 and the Common Facilities construction costs continue to be recovered through the NCCR tariff or deferred. Georgia Power is deferring as a regulatory asset the debt component of financing costs ($14 million at December 31, 2023) as well as the remaining depreciation expense ($17 million at December 31, 2023) until Unit 4 costs are placed in retail base rates. The equity component of financing costs ($23 million at December 31, 2023) represents an unrecognized ratemaking amount that is not reflected on Georgia Power's balance sheets. This amount will be recognized in Georgia Power's income statements in the periods it is billable to customers. On August 19, 2023, fuel load for Unit 4 was completed, and, on August 30, 2023, Georgia Power filed an application to adjust rates to include reasonable and prudent Plant Vogtle Units 3 and 4 costs (Application). On December 19, 2023, the Georgia PSC voted to approve the Application as modified by the related stipulated agreement (Prudency Stipulation) among Georgia Power, the staff of the Georgia PSC, and certain intervenors. While recognizing the Prudency Stipulation, the Application provided the necessary support to justify the reasonableness, prudence, and recovery of $8.826 billion in total construction and capital costs, $1.07 billion in associated retail rate base items, and the operating costs related to the full operation and output of Plant Vogtle Units 3 and 4. Under the terms of the approved Prudency Stipulation, Georgia Power will recover $7.562 billion in total construction and capital costs and associated retail rate base items of $1.02 billion, which includes AFUDC financing costs above $4.418 billion (the Georgia PSC-certified amount) up to $7.562 billion. Georgia Power will also recover projected operations and maintenance expenses, depreciation expense, nuclear decommissioning accruals, and property taxes, net of projected PTCs. After considering construction and capital costs already in retail base rates of $2.1 billion and $362 million of associated retail rate base items (approved by the Georgia PSC in 2021) and upon achieving commercial operation of Unit 4, Georgia Power will include in retail rate base the remaining $5.462 billion of construction and capital costs as well as $656 million of associated retail rate base items. When the rate adjustment occurs, Georgia Power's NCCR tariff will cease to be collected and financing costs will be included in Georgia Power's general retail revenue requirements. Further, as included in the approved Prudency Stipulation, if commercial operation for Unit 4 is not achieved by March 31, 2024, Georgia Power's ROE used to determine the NCCR tariff and calculate AFUDC will be reduced to zero, which will result in an estimated negative impact to earnings of approximately $30 million per month until the month following the date commercial operation for Unit 4 is achieved. As of each Unit's respective first refueling outage, if the respective Unit's performance has materially deviated from expected performance, the Georgia PSC may order Georgia Power to credit customers for operations and maintenance expenses or disallow costs associated with the repair or replacement of any system, structure, or component found to have caused the material deviation in performance if proven to be the result of imprudent engineering, construction, procurement, testing, or start-up. Annual retail base revenues will increase approximately $729 million and the average retail base rates will be adjusted by approximately 5% (net of the elimination of the NCCR tariff described above) effective the first day of the month after Unit 4 achieves commercial operation. The approval of the Application and the Prudency Stipulation resolves all issues for determination by the Georgia PSC regarding the reasonableness, prudence, and cost recovery for the remaining Plant Vogtle Units 3 and 4 construction and capital costs not already in retail base rates. As a result of the Georgia PSC's approval of the Prudency Stipulation, Georgia Power recorded a pre-tax credit to income of approximately $228 million ($170 million after tax) in the fourth quarter 2023 to recognize CWIP costs previously charged to income, which are now recoverable through retail rates. Associated AFUDC on these costs was also recognized. The ultimate outcome of these matters cannot be determined at this time. Mississippi Power Mississippi Power's rates and charges for service to retail customers are subject to the regulatory oversight of the Mississippi PSC. Mississippi Power's rates are a combination of base rates and several separate cost recovery clauses for specific categories of costs. These separate cost recovery clauses address such items as fuel and purchased power, ad valorem taxes, property damage, and the costs of compliance with environmental laws and regulations. Costs not addressed through one of the specific cost recovery clauses are expected to be recovered through Mississippi Power's base rates. Performance Evaluation Plan Mississippi Power's retail base rates generally are set under the PEP, a rate plan approved by the Mississippi PSC. In recognition that Mississippi Power's long-term financial success is dependent upon how well it satisfies its customers' needs, PEP includes performance indicators that directly tie customer service indicators to Mississippi Power's allowed ROE. PEP measures Mississippi Power's performance on a 10-point scale as a weighted average of results in three areas: average customer price, as compared to prices of other regional utilities (weighted at 40%); service reliability, measured in percentage of time customers had electric service (40%); and customer satisfaction, measured in a survey of residential customers (20%). Typically, two PEP filings are made for each calendar year: the PEP projected filing in March of the current year and the PEP lookback filing in March of the subsequent year. The annual PEP projected filings utilize a historic test year adjusted for "known and measurable" changes and discounted cash flow and regression formulas to determine base ROE. The PEP lookback filing reflects the actual revenue requirement. In June 2021 and June 2022, the Mississippi PSC approved Mississippi Power's annual retail PEP filings, resulting in annual increases in revenues of approximately $16 million, or 1.8%, and $18 million, or 1.9%, respectively, effective with the first billing cycle of April 2021 and April 2022, respectively. On June 13, 2023, the Mississippi PSC approved Mississippi Power's annual retail PEP filing for 2023 indicating no change in retail rates. Integrated Resource Plan In 2020, the Mississippi PSC issued an order requiring Mississippi Power to incorporate into its 2021 IRP a schedule of early or anticipated retirement of 950 MWs of fossil-steam generation by year-end 2027 to reduce the excess reserve margin Mississippi Power anticipated at that time. The order stated that Mississippi Power will be allowed to defer any retirement-related costs as regulatory assets for future recovery. In 2021, the Mississippi PSC concluded its review of Mississippi Power's 2021 IRP. The 2021 IRP included a schedule to retire Plant Watson Unit 4 (268 MWs) and Mississippi Power's 40% ownership interest in Plant Greene County Units 1 and 2 (103 MWs each) in December 2023, 2025, and 2026, respectively, consistent with each unit's remaining useful life in the most recent approved depreciation studies. In addition, the schedule reflected the early retirement of Mississippi Power's 50% undivided ownership interest in Plant Daniel Units 1 and 2 (502 MWs) by the end of 2027. The Plant Greene County unit retirements require the completion by Alabama Power of transmission and system reliability improvements, as well as agreement by Alabama Power. The remaining net book value of Plant Daniel Units 1 and 2 was approximately $489 million at December 31, 2023 and Mississippi Power is continuing to depreciate these units using the current approved rates. Mississippi Power expects to reclassify the net book value remaining at retirement to a regulatory asset to be amortized over a period to be determined by the Mississippi PSC in future proceedings, consistent with the 2020 order. The Plant Watson and Greene County units are expected to be fully depreciated upon retirement. See Note 3 under "Other Matters – Mississippi Power" for additional information on Plant Daniel Units 1 and 2. In October 2023, Mississippi Power signed an affiliate PPA with Georgia Power for 750 MWs of capacity, which began January 1, 2024 and will continue through December 2028. In order to fulfill this PPA and serve the interests of customers, Mississippi Power now expects electric generating units identified in its 2021 IRP to remain in service beyond the previously indicated dates. Mississippi Power is expected to file its next IRP in April 2024 in accordance with the rules and orders of the Mississippi PSC. The ultimate outcome of these matters cannot be determined at this time. Environmental Compliance Overview Plan In accordance with a 2011 accounting order from the Mississippi PSC, Mississippi Power has the authority to defer in a regulatory asset for future recovery all plant retirement- or partial retirement-related costs resulting from environmental regulations. In June 2021, April 2022, and April 2023, the Mississippi PSC approved Mississippi Power's annual ECO Plan filings, resulting in a decrease in revenues of approximately $9 million annually effective with the first billing cycle of July 2021, an increase in revenues of approximately $1 million annually effective with the first billing cycle of May 2022, and a $3 million annual increase in revenues effective with the first billing cycle of May 2023, respectively. On February 12, 2024, Mississippi Power submitted its annual ECO Plan filing to the Mississippi PSC, which requested a $9 million annual increase in revenues. The ultimate outcome of this matter cannot be determined at this time. Fuel Cost Recovery Mississippi Power annually establishes, and is required to file for an adjustment to, the retail fuel cost recovery factor that is approved by the Mississippi PSC. The Mississippi PSC approved increases of $2 million and $43 million effective in February 2021 and 2022, respectively. In November 2022, Mississippi Power filed a request with the Mississippi PSC to increase retail fuel revenues by $25 million annually effective with the first billing cycle of February 2023 and an additional $25 million annually effective with the first billing cycle of June 2023. On January 10, 2023, the Mississippi PSC voted to defer approval of the filing. Mississippi Power is allowed to maintain current billing rates and continue accruing its weighted-average cost of capital on any under or over fuel recovery balance. On February 6, 2024, the Mississippi PSC approved Mississippi Power's request to increase retail fuel revenues by $18 million annually effective with the first billing cycle of March 2024. The approved filing included the deferral of approximately $61 million of under recovered fuel costs as of October 2023, which is expected to be included in Mississippi Power's next fuel filing. Mississippi Power will continue to accrue its weighted-average cost of capital on any under or over fuel recovery balance. At December 31, 2023, Mississippi Power had $50 million of deferred under recovered retail fuel clause revenues and $27 million of over recovered retail fuel clause revenues primarily associated with its fuel-hedging program on its balance sheet. At December 31, 2022, under recovered retail fuel costs of approximately $1 million were included in other customer accounts receivable on Mississippi Power's balance sheet. See Note 1 under "Fuel Costs" for additional information. Mississippi Power has wholesale MRA and Market Based (MB) fuel cost recovery factors. Effective with the first billing cycles for January 2022, 2023, and 2024, annual revenues under the wholesale MRA fuel rate increased $11 million and $22 million and decreased $4 million, respectively. The wholesale MB fuel rate did not change materially in any period presented. At December 31, 2023 and 2022, wholesale fuel costs were over recovered $5 million and under recovered $6 million, respectively. Mississippi Power's operating revenues are adjusted for differences in actual recoverable fuel cost and amounts billed in accordance with the currently approved cost recovery rate. Accordingly, changes in the billing factor should have no significant effect on Mississippi Power's revenues or net income but will affect operating cash flows. Ad Valorem Tax Adjustment Mississippi Power annually establishes an ad valorem tax adjustment factor that is approved by the Mississippi PSC. Effective with the first billing cycle of May 2021, July 2022, and June 2023, the Mississippi PSC approved changes in annual revenues collected through the ad valorem tax adjustment factor resulting in a $28 million increase, a $5 million increase, and a $7 million decrease, respectively. The 2021 increase included approximately $19 million of ad valorem taxes previously recovered through PEP in accordance with a 2019 rate case settlement agreement. System Restoration Rider Mississippi Power carries insurance for the cost of certain types of damage to generation plants and general property. However, Mississippi Power is self-insured for the cost of storm, fire, and other uninsured casualty damage to its property, including transmission and distribution facilities. As permitted by the Mississippi PSC and the FERC, Mississippi Power accrues for the cost of such damage through an annual expense accrual which is credited to regulatory liability accounts for the retail and wholesale jurisdictions. The cost of repairing actual damage resulting from such events that individually exceed $50,000 is charged to the reserve. Every year, the Mississippi PSC, the MPUS, and Mississippi Power agree on SRR revenue level(s). Mississippi Power's net retail SRR accrual, which includes carrying costs and previously included amortization of related excess deferred income tax benefits, was $11.7 million in 2023, $6.9 million in 2022, and $(1.8) million in 2021. At December 31, 2023 and 2022, the retail property damage reserve balance was $45 million and $37 million, respectively. In 2021, the Mississippi PSC approved Mississippi Power's annual SRR filing, which requested an increase in retail revenues of approximately $9 million annually effective with the first billing cycle of March 2022. On April 4, 2023, the Mississippi PSC approved Mississippi Power's annual SRR filing, which indicated no change in retail rates. Mississippi Power's minimum annual SRR accrual was increased from $8.3 million to $11.7 million. In the event the expected annual charges exceed the annual accrual or the target balance has been met, Mississippi Power and the Mississippi PSC will determine the appropriate change to the annual accrual. Additionally, if PEP earnings are above a certain threshold, Mississippi Power has the ability to apply any required PEP refund as an additional accrual to the property damage reserve in lieu of customer refunds. On February 1, 2024, Mississippi Power submitted its annual SRR filing to the Mississippi PSC, which indicated no change in retail rates. The filing includes a request to increase the minimum annual SRR accrual from $11.7 million to $12.6 million. Reliability Reserve Accounting Order In December 2022, the Mississippi PSC approved an accounting order authorizing Mississippi Power to create a reliability reserve for the purpose of deferring generation, transmission, and distribution reliability-related expenditures for use in a future year. Mississippi Power may make accruals to the reliability reserve each year after meeting with the MPUS and Mississippi PSC staff. Mississippi Power will provide annually, through its capital plan, energy delivery plan, or PEP filing, any amounts to be charged against the reliability reserve during the current year. During 2023 and 2022, Mississippi Power accrued $11 million and $25 million, respectively, to the reliability reserve. At December 31, 2023 and 2022, the reliability reserve balance was $36 million and $25 million, respectively. Municipal and Rural Associations Tariff Mississippi Power provides wholesale electric service to Cooperative Energy, East Mississippi Electric Power Association, and the City of Collins, all located in southeastern Mississippi, under a long-term, cost-based, FERC-regulated MRA tariff. In 2017, Mississippi Power and Cooperative Energy executed, and the FERC accepted, a Shared Service Agreement (SSA), as part of the MRA tariff, under which Mississippi Power and Cooperative Energy share in providing electricity to the Cooperative Energy delivery points under the tariff. In August 2022, the FERC accepted an amended SSA between Mississippi Power and Cooperative Energy, effective July 1, 2022, under which Cooperative Energy will continue to decrease its use of Mississippi Power's generation services under the MRA tariff up to 2.5% annually through 2035. At December 31, 2023, Mississippi Power is serving approximately 390 MWs of Cooperative Energy's annual demand. Beginning in 2036, Cooperative Energy will provide 100% of its electricity requirements at the MRA delivery points under the tariff. Neither party has the option to cancel the amended SSA. On October 27, 2023, the FERC approved a settlement agreement filed by Mississippi Power and Cooperative Energy on July 31, 2023 related to Mississippi Power's July 2022 request for a $23 million increase in annual wholesale base revenues under the MRA tariff. The settlement agreement provides for a $16 million increase in annual wholesale base revenues, effective September 14, 2022, and a refund to customers of approximately $6 million primarily related to the difference between the approved rates and interim rates. Southern Company Gas Utility Regulation and Rate Design The natural gas distribution utilities are subject to regulation and oversight by their respective state regulatory agencies. Rates charged to customers vary according to customer class (residential, commercial, or industrial) and rate jurisdiction. These agencies approve rates designed to provide the opportunity to generate revenues to recover all prudently-incurred costs, including a return on rate base sufficient to pay interest on debt and provide a reasonable ROE. As a result of operating in a deregulated environment, Atlanta Gas Light earns revenue by charging rates to its customers based primarily on monthly fixed charges that are set by the Georgia PSC and adjusted periodically. The Marketers add these fixed charges when billing their respective customers. This mechanism, called a straight-fixed-variable rate design, minimizes the seasonality of Atlanta Gas Light's revenues since the monthly fixed charge is not volumetric or directly weather dependent. With the exception of Atlanta Gas Light, the earnings of the natural gas distribution utilities can be affected by customer consumption patterns that are largely a function of weather conditions and price levels for natural gas. Specifically, customer demand substantially increases during the Heating Season when natural gas is used for heating purposes. Southern Company Gas has various mechanisms, such as weather and revenue normalization mechanisms and weather derivative instruments, that limit exposure to weather changes within typical ranges in these utilities' respective service territories. In addition to natural gas cost recovery mechanisms, other cost recovery mechanisms and regulatory riders, which vary by utility, allow recovery of certain costs, such as those related to infrastructure replacement programs as well as environmental remediation, energy efficiency plans, and bad debts. In traditional rate designs, utilities recover a significant portion of the fixed customer service and pipeline infrastructure costs based on assumed natural gas volumes used by customers. With the exception of Chattanooga Gas, the natural gas distribution utilities have decoupled regulatory mechanisms that Southern Company Gas believes encourage conservation by separating the recoverable amount of these fixed costs from the amounts of natural gas used by customers. See "Rate Proceedings" herein for additional information. Also see "Infrastructure Replacement Programs and Capital Projects" herein for additional information regarding infrastructure replacement programs at certain of the natural gas distribution utilities. The following table provides regulatory information for Southern Company Gas' natural gas distribution utilities:
(a)Designed to help stabilize operating results by allowing recovery of costs in the event of unseasonal weather, but are not direct offsets to the potential impacts on earnings of weather and customer consumption. (b)Allows for recovery of fixed customer service costs separately from assumed natural gas volumes used by customers and provides a benchmark level of revenue for recovery. (c)See "Infrastructure Replacement Programs and Capital Projects" herein for additional information. Chattanooga Gas' pipeline replacement program costs are recovered through its annual base rate review mechanism. (d)The recovery (refund) of bad debt expense over (under) an established benchmark expense. The gas portion of bad debt expense is recovered through purchased gas adjustment mechanisms. Nicor Gas also has a rider to recover the non-gas portion of bad debt expense. (e)Recovery of costs associated with plans to achieve specified energy savings goals. (f)Regulatory mechanism allowing annual adjustments to base rates up or down based on authorized ROE and/or ROE range. Infrastructure Replacement Programs and Capital Projects In addition to capital expenditures recovered through base rates by each of the natural gas distribution utilities, Nicor Gas and Virginia Natural Gas have separate rate riders that provide timely recovery of capital expenditures for specific infrastructure replacement programs and Atlanta Gas Light has a separate rate rider that provides for the timely recovery of capital expenditures for a specific reinforcement capital program. Total capital expenditures incurred during 2023 for all gas distribution operations were $1.6 billion. The following table and discussions provide updates on the infrastructure replacement programs and capital projects at the natural gas distribution utilities at December 31, 2023. These programs are risk-based and designed to update and replace cast iron, bare steel, and mid-vintage plastic materials or expand Southern Company Gas' distribution systems to improve reliability and meet operational flexibility and growth.
*Included replacement of pipes, compressors, and transmission mains along with other improvements such as new meters. This program ended November 30, 2023 with all expenditures placed in service. Recovery of program costs is described under "Nicor Gas" herein. Nicor Gas Illinois legislation allows Nicor Gas to provide more widespread safety and reliability enhancements to its distribution system through 2023 and stipulates that rate increases to customers as a result of any infrastructure investments shall not exceed a cumulative annual average of 4.0% or, in any given year, 5.5% of base rate revenues. In 2014, the Illinois Commission approved the nine-year regulatory infrastructure program, Investing in Illinois, which concluded in 2023 and is subject to annual review, as discussed further below. In accordance with orders from the Illinois Commission, Nicor Gas recovers program costs incurred through a separate rider and base rates. See "Rate Proceedings – Nicor Gas" herein for additional information. On June 15, 2023, the Illinois Commission concluded its review of the Qualifying Infrastructure Plant (QIP) capital investments by Nicor Gas for calendar year 2019 under the QIP rider, also referred to as Investing in Illinois program. The Illinois Commission disallowed $32 million of the $415 million of capital investments commissioned in 2019, together with the related return on investment. Nicor Gas recorded a pre-tax charge to income in the second quarter 2023 of $38 million ($28 million after tax) associated with the disallowance of capital investments placed in service in 2019. The disallowance is reflected on the statement of income as an $8 million reduction to revenues and $30 million in estimated loss on regulatory disallowance. On August 3, 2023, the Illinois Commission denied a rehearing request filed by Nicor Gas. On August 24, 2023, Nicor Gas filed a notice of appeal with the Illinois Appellate Court. Nicor Gas defends these investments in infrastructure as prudently incurred. The following table provides a summary of QIP capital investments during the nine-year program:
(a)Appealed to the Illinois Appellate Court. (b)Capital investments are subject to the required QIP annual review proceeding; years 2020 through 2022 are pending with the Illinois Commission. (c)Disallowed in Nicor Gas' 2023 general base rate case proceeding. See "Rate Proceedings – Nicor Gas" herein for additional information regarding the Illinois Commission's disallowance of certain capital investments. Any further cost disallowances by the Illinois Commission in the pending cases could be material to the financial statements of Southern Company Gas. The ultimate outcome of these matters cannot be determined at this time. Virginia Natural Gas The SAVE program, an accelerated infrastructure replacement program, allows Virginia Natural Gas to continue replacing aging pipeline infrastructure through 2024. The program includes authorized annual investments of $60 million in 2021 and $70 million in each year from 2022 through 2024, with a total potential variance of up to $5 million allowed for the program, for a maximum total investment over the six-year term (2019 through 2024) of $365 million. On February 9, 2024, Virginia Natural Gas filed with the Virginia Commission a request to extend the existing SAVE program through 2029. The request includes investments of $70 million in each year from 2025 through 2029, with a potential variance of up to $5 million allowed for the program, for a maximum total investment over the five-year extension (2025 through 2029) of $355 million. Virginia Natural Gas expects the Virginia Commission to issue a final order on this matter in the second quarter 2024. The ultimate outcome of this matter cannot be determined at this time. The SAVE program is subject to annual review by the Virginia Commission. In accordance with the base rate case approved by the Virginia Commission in 2023, Virginia Natural Gas is recovering program costs incurred prior to January 1, 2023 through base rates. Program costs incurred subsequent to January 1, 2023 are currently being recovered through a separate rider and are subject to future base rate case proceedings. See "Rate Proceedings – Virginia Natural Gas" herein for additional information. Atlanta Gas Light In 2019, the Georgia PSC approved the continuation of GRAM as part of Atlanta Gas Light's 2019 rate case order. Various infrastructure programs previously authorized by the Georgia PSC, including the Integrated Vintage Plastic Replacement Program to replace aging plastic pipe and the Integrated System Reinforcement Program to upgrade Atlanta Gas Light's distribution system and LNG facilities in Georgia, continue under GRAM and the recovery of and return on the infrastructure program investments are included in annual base rate adjustments. The amounts to be recovered through rates related to allowed, but not incurred, costs have been quantified as an unrecognized ratemaking amount that is not reflected on the balance sheets. These allowed costs are primarily the equity return on the capital investment under the infrastructure programs in place prior to GRAM and are being recovered through GRAM and base rates until the earlier of the full recovery of such amounts or December 31, 2025. The under recovered balance at December 31, 2023 was $44 million, including $23 million of unrecognized equity return, and is expected to be recovered by December 31, 2025. The Georgia PSC reviews Atlanta Gas Light's performance annually under GRAM. See "Unrecognized Ratemaking Amounts" herein for additional information. Atlanta Gas Light and the staff of the Georgia PSC previously agreed to a variation of the Integrated Customer Growth Program to extend pipeline facilities to serve customers in areas without pipeline access and create new economic development opportunities in Georgia. A separate tariff provides recovery of up to $15 million annually for strategic economic development projects approved by the Georgia PSC. See "Rate Proceedings – Atlanta Gas Light" herein for additional information regarding the Georgia PSC's 2021 approval of Atlanta Gas Light's GRAM filing and Integrated Capacity and Delivery Plan. The Georgia PSC also approved a new System Reinforcement Rider for authorized large pressure improvement and system reliability projects, which is expected to recover related capital investments totaling $286 million for the years 2022 through 2024, of which $104 million and $76 million was incurred in 2023 and 2022, respectively. Chattanooga Gas In 2021, the Tennessee Public Utilities Commission approved Chattanooga Gas' pipeline replacement program to replace approximately 73 miles of distribution main over a seven-year period. The estimated total cost of the program is $118 million, which will be recovered through Chattanooga Gas' annual base rate review mechanism. Natural Gas Cost Recovery With the exception of Atlanta Gas Light, the natural gas distribution utilities are authorized by the relevant regulatory agencies in the states in which they serve to use natural gas cost recovery mechanisms that adjust rates to reflect changes in the wholesale cost of natural gas and ensure recovery of all costs prudently incurred in purchasing natural gas for customers. The natural gas distribution utilities defer or accrue the difference between the actual cost of natural gas and the amount of commodity revenue earned in a given period. The deferred or accrued amount is either billed or refunded to customers prospectively through adjustments to the commodity rate. Deferred natural gas costs are reflected as regulatory assets and accrued natural gas costs are reflected as regulatory liabilities. Natural gas costs generally do not have a significant effect on Southern Company's or Southern Company Gas' net income, but could have a significant effect on cash flows. Since Atlanta Gas Light does not sell natural gas directly to its end-use customers, it does not utilize a traditional natural gas cost recovery mechanism. However, Atlanta Gas Light does maintain natural gas inventory for the Marketers in Georgia and recovers the cost through recovery mechanisms approved by the Georgia PSC. At December 31, 2023, the over recovered balance was $214 million, which was included in natural gas cost over recovery on Southern Company's and Southern Company Gas' balance sheets. At December 31, 2022, the under recovered balance was $108 million, which was included in natural gas cost under recovery on Southern Company's and Southern Company Gas' balance sheets. Rate Proceedings Nicor Gas In 2021, the Illinois Commission approved a $240 million annual base rate increase, which became effective November 24, 2021. The base rate increase included $94 million related to the recovery of program costs under the Investing in Illinois program and was based on a ROE of 9.75% and an equity ratio of 54.5%. On November 16, 2023, the Illinois Commission approved a $223 million annual base rate increase for Nicor Gas, which became effective December 1, 2023. The base rate increase was based on a return on equity of 9.51% and an equity ratio of 50.00%. In connection with Nicor Gas' general base rate case proceeding, the Illinois Commission disallowed $126.8 million of capital investments that have been completed or planned to be completed through December 31, 2024. This includes $31 million for capital investments placed in service in 2022 and 2023 under the Investing in Illinois program and $95.9 million for other transmission and distribution capital investments. Nicor Gas recorded a pre-tax charge to income in the fourth quarter 2023 of $58 million ($44 million after tax) associated with the disallowances, with the remaining $69 million related to prospective projects that will be postponed and/or reevaluated. The disallowance is reflected on the statement of income in estimated loss on regulatory disallowance. See "Infrastructure Replacement Programs and Capital Projects – Nicor Gas" herein for additional information regarding the Illinois Commission's disallowance of certain capital investments. On January 3, 2024, the Illinois Commission denied a request by Nicor Gas for rehearing on the base rate case disallowances associated with capital investment, as well as on other issues determined in the Illinois Commission's November 16, 2023 base rate case decision. On February 6, 2024, Nicor Gas filed a notice of appeal with the Illinois Appellate Court related to the Illinois Commission's rate case ruling. The ultimate outcome of this matter cannot be determined at this time. Atlanta Gas Light The Georgia PSC evaluates Atlanta Gas Light's earnings against a ROE range of 10.05% to 10.45%, with disposition of any earnings above 10.45% to be determined by the Georgia PSC. Additionally, the Georgia PSC allows inclusion in base rates of the recovery of and return on the infrastructure program investments, including, but not limited to, GRAM adjustments. GRAM filing rate adjustments are based on an authorized ROE of 10.25%. GRAM adjustments for 2021 could not exceed 5% of 2020 base rates. The 5% limitation does not set a precedent in any future rate proceedings by Atlanta Gas Light. In April 2021, Atlanta Gas Light filed its Integrated Capacity and Delivery Plan (i-CDP) with the Georgia PSC, which included a series of ongoing and proposed pipeline safety, reliability, and growth programs for the next 10 years (2022 through 2031), as well as the required capital investments and related costs to implement the programs. The i-CDP reflected capital investments totaling approximately $0.5 billion to $0.6 billion annually. In November 2021, the Georgia PSC approved a stipulation agreement between Atlanta Gas Light and the staff of the Georgia PSC, under which, for the years 2022 through 2024, Atlanta Gas Light will incrementally reduce its combined GRAM and System Reinforcement Rider request by 10% through Atlanta Gas Light's GRAM mechanism, which resulted in a reduction of $5 million for 2022, $7 million for 2023, and $9 million for 2024. The stipulation agreement also provided for $1.7 billion of total capital investment for the years 2022 through 2024. In November 2021, December 2022, and December 2023, the Georgia PSC approved Atlanta Gas Light's annual GRAM filings, which resulted in an annual rate increase of $43 million effective January 1, 2022, an annual rate increase of $53 million effective January 1, 2023, and an annual rate increase of $53 million effective January 1, 2024, respectively. On February 1, 2024, Atlanta Gas Light filed its triennial i-CDP with the Georgia PSC, which included a series of ongoing and proposed pipeline safety, reliability, and growth programs for the next 10 years (2025 through 2034), as well as the required capital investments and related costs to implement the programs. The i-CDP reflected capital investments totaling approximately $0.7 billion to $1.0 billion annually. Atlanta Gas Light expects the Georgia PSC to issue a final order on this matter in the third quarter 2024. The ultimate outcome of this matter cannot be determined at this time. Virginia Natural Gas In 2021, the Virginia Commission approved a stipulation agreement related to Virginia Natural Gas' 2020 general rate case filing, which allowed for a $43 million increase in annual base rate revenues, including $14 million related to the recovery of investments under the SAVE program, based on a ROE of 9.5% and an equity ratio of 51.9%. Interim rates became effective as of November 1, 2020, subject to refund, based on Virginia Natural Gas' original requested increase of approximately $50 million. Refunds to customers related to the difference between the approved rates effective October 1, 2021 and the interim rates were completed during the fourth quarter 2021. On August 28, 2023, the Virginia Commission approved a stipulation agreement related to Virginia Natural Gas' August 2022 general base rate case filing, which allowed for a $48 million increase in annual base rate revenues based on a ROE of 9.70% and an equity ratio of 49.06%. Interim rates became effective as of January 1, 2023, subject to refund, based on Virginia Natural Gas' original requested increase of approximately $69 million. Refunds to customers related to the difference between the approved rates effective September 1, 2023 and the interim rates were completed during the fourth quarter 2023. Unrecognized Ratemaking Amounts The following table illustrates Southern Company Gas' authorized ratemaking amounts that are not recognized on its balance sheets. These amounts are primarily comprised of an allowed equity rate of return on assets associated with certain regulatory infrastructure programs. These amounts will be recognized as revenues in Southern Company Gas' financial statements in the periods they are billable to customers, the majority of which will be recovered by 2025.
4. REVENUE FROM CONTRACTS WITH CUSTOMERS The Registrants generate revenues from a variety of sources, some of which are not accounted for as revenue from contracts with customers, such as leases, derivatives, and certain cost recovery mechanisms. See Note 1 under "Revenues" for additional information on the revenue policies of the Registrants. See Notes 9 and 14 for additional information on revenue accounted for under lease and derivative accounting guidance, respectively. The following table disaggregates revenue from contracts with customers for the periods presented:
(a)Other revenue sources relate to revenues from customers accounted for as derivatives and leases, alternative revenue programs at Southern Company Gas, and cost recovery mechanisms and revenues (including those related to fuel costs) that meet other scope exceptions for revenues from contracts with customers at the traditional electric operating companies. (b)Other adjustments relate to the cost of Southern Company Gas' energy and risk management activities. Wholesale gas services revenues are presented net of the related costs of those activities on the statement of income. See Notes 15 and 16 under "Southern Company Gas" for information on the sale of Sequent and components of wholesale gas services' operating revenues, respectively. Contract Balances The following table reflects the closing balances of receivables, contract assets, and contract liabilities related to revenues from contracts with customers at December 31, 2023 and 2022:
Contract assets for Georgia Power primarily relate to retail customer fixed bill programs, where the payment is contingent upon Georgia Power's continued performance and the customer's continued participation in the program over a one-year contract term, and unregulated service agreements, where payment is contingent on project completion. Contract liabilities for Georgia Power primarily relate to cash collections recognized in advance of revenue for unregulated service agreements. Southern Company Gas' contract assets relate to work performed on an energy efficiency enhancement and upgrade contract with the U.S. General Services Administration. Southern Company Gas receives cash advances from a third-party financial institution to fund work performed, of which approximately $59 million had been received at December 31, 2023. These advances have been accounted for as long-term debt on the balance sheets. See Note 1 under "Affiliate Transactions" for additional information regarding the construction contract. At December 31, 2023 and 2022, Southern Company's unregulated distributed generation business had contract assets of $91 million and $65 million, respectively, and contract liabilities of $115 million and $32 million, respectively, for outstanding performance obligations. Revenues recognized in 2023 and 2022, which were included in contract liabilities at December 31, 2023 and 2022, respectively, were $36 million annually for Southern Company and immaterial for the other Registrants. Contract liabilities are primarily classified as current on the balance sheets as the corresponding revenues are generally expected to be recognized within one year. Remaining Performance Obligations The Subsidiary Registrants may enter into long-term contracts with customers in which revenues are recognized as performance obligations are satisfied over the contract term. For the traditional electric operating companies and Southern Power, these contracts primarily relate to PPAs whereby electricity and generation capacity are provided to a customer. The revenue recognized for the delivery of electricity is variable; however, certain PPAs include a fixed payment for fixed generation capacity over the term of the contract. For Southern Company Gas, these contracts primarily relate to the U.S. General Services Administration contract described above. Southern Company's unregulated distributed generation business also has partially satisfied performance obligations related to certain fixed price contracts. Revenues from contracts with customers related to these performance obligations remaining at December 31, 2023 are expected to be recognized as follows:
5. PROPERTY, PLANT, AND EQUIPMENT Property, plant, and equipment is stated at original cost or fair value at acquisition, as appropriate, less any regulatory disallowances and impairments. Original cost may include: materials; labor; minor items of property; appropriate administrative and general costs; payroll-related costs such as taxes, pensions, and other benefits; and the interest capitalized and/or cost of equity funds used during construction. The Registrants' property, plant, and equipment in service consisted of the following at December 31, 2023 and 2022:
The cost of replacements of property, exclusive of minor items of property, is capitalized. The cost of maintenance, repairs, and replacement of minor items of property is charged to other operations and maintenance expenses as incurred or performed with the exception of nuclear refueling costs and certain maintenance costs including those described below. In accordance with orders from their respective state PSCs, Alabama Power and Georgia Power defer nuclear refueling outage operations and maintenance expenses to a regulatory asset when the charges are incurred. Alabama Power amortizes the costs over a subsequent 18-month period with Plant Farley's fall outage cost amortization beginning in January of the following year and spring outage cost amortization beginning in July of the same year. Georgia Power amortizes its costs over each unit's operating cycle, or 18 months for Plant Vogtle Units 1, 2, and 3 and 24 months for Plant Hatch Units 1 and 2. Georgia Power's amortization period begins the month the refueling outage starts. A portion of Mississippi Power's railway track maintenance costs is charged to fuel stock and recovered through Mississippi Power's fuel clause. The portion of Southern Company Gas' non-working gas used to maintain the structural integrity of natural gas storage facilities that is considered to be non-recoverable is depreciated, while the recoverable or retained portion is not depreciated. See Note 9 for information on finance lease right-of-use (ROU) assets, net, which are included in property, plant, and equipment. The Registrants have deferred certain implementation costs related to cloud hosting arrangements. At December 31, 2023 and 2022, deferred cloud implementation costs, net of amortization, which are generally included in other deferred charges and assets on the Registrants' balance sheets, are as follows:
Once a hosted software is placed into service, the related deferred costs are amortized on a straight-line basis over the remaining expected hosting arrangement term, including any renewal options that are reasonably certain of exercise. The amortization is reflected with the associated cloud hosting fees, which are generally reflected in other operations and maintenance expenses on the Registrants' statements of income. In 2023, amortization of deferred cloud implementation costs recognized was $46 million for Southern Company, $11 million for Alabama Power, $19 million for Georgia Power, $8 million for Southern Company Gas, and immaterial for the other Registrants. In 2022, amortization of deferred cloud implementation costs recognized was $29 million for Southern Company, $8 million for Alabama Power, $12 million for Georgia Power, and immaterial for the other Registrants. In 2021, amortization from deferred cloud implementation costs recognized was immaterial for all Registrants. See Note 2 under "Regulatory Assets and Liabilities" and "Alabama Power – Software Accounting Order" for information on deferrals of certain other operations and maintenance costs associated with software and cloud computing projects by the traditional electric operating companies and natural gas distribution utilities, as authorized by their respective state PSCs or applicable state regulatory agencies. Depreciation and Amortization The traditional electric operating companies' and Southern Company Gas' depreciation of the original cost of utility plant in service is provided primarily by using composite straight-line rates. The approximate rates for 2023, 2022, and 2021 are as follows:
Depreciation studies are conducted periodically to update the composite rates. These studies are filed with the respective state PSC and/or other applicable state and federal regulatory agencies for the traditional electric operating companies and the natural gas distribution utilities. Effective January 1, 2023, Alabama Power's and Georgia Power's depreciation rates were revised. See Note 2 for additional information. When property, plant, and equipment subject to composite depreciation is retired or otherwise disposed of in the normal course of business, its original cost, together with the cost of removal, less salvage, is charged to accumulated depreciation. For other property dispositions, the applicable cost and accumulated depreciation are removed from the balance sheet accounts, and a gain or loss is recognized. Minor items of property included in the original cost of the asset are retired when the related property unit is retired. At December 31, 2023 and 2022, accumulated depreciation for Southern Company and Southern Company Gas consisted of utility plant in service totaling $36.6 billion and $34.3 billion, respectively, for Southern Company and $5.3 billion and $5.1 billion, respectively, for Southern Company Gas, as well as other plant in service totaling $1.1 billion and $1.0 billion, respectively, for Southern Company and $210 million and $184 million, respectively, for Southern Company Gas. Other plant in service includes the non-utility assets of Southern Company Gas, as well as, for Southern Company, certain other non-utility subsidiaries. Depreciation of the original cost of other plant in service is provided primarily on a straight-line basis over estimated useful lives. Useful lives for Southern Company Gas's non-utility assets range from five to 12 years for transportation equipment, 30 to 75 years for storage facilities, and up to 75 years for other assets. Useful lives for the assets of Southern Company's other non-utility subsidiaries range up to 30 years. Southern Power Southern Power applies component depreciation, where depreciation is computed principally by the straight-line method over the estimated useful life of the asset. Certain of Southern Power's generation assets related to natural gas-fired facilities are depreciated on a units-of-production basis, using hours or starts, to better match outage and maintenance costs to the usage of, and revenues from, these assets. The primary assets in Southern Power's property, plant, and equipment are generating facilities, which generally have estimated useful lives as follows:
When Southern Power's depreciable property, plant, and equipment is retired, or otherwise disposed of in the normal course of business, the applicable cost and accumulated depreciation is removed and a gain or loss is recognized in the statements of income. Southern Power reviews its estimated useful lives and salvage values on an ongoing basis. The results of these reviews could result in changes which could have a material impact on Southern Power's net income. Joint Ownership Agreements At December 31, 2023, the Registrants' percentage ownership and investment (exclusive of nuclear fuel) in jointly-owned facilities in commercial operation were as follows:
(a)Jointly owned by Alabama Power and Mississippi Power and operated and maintained by Alabama Power. (b)Jointly owned with PowerSouth and operated and maintained by Alabama Power. (c)Georgia Power owns undivided interests in Plants Hatch, Vogtle, and Scherer in varying amounts jointly with one or more of the following entities: OPC, MEAG Power, Dalton, FP&L, and JEA. Georgia Power has been contracted to operate and maintain the plants as agent for the co-owners and is jointly and severally liable for third party claims related to these plants. (d)Unit 4 remains under construction. See Note 2 under "Georgia Power – Nuclear Construction" for additional information. (e)Jointly owned with OPC, which is the operator of the plant. (f)Jointly owned by FP&L and Mississippi Power. In accordance with the operating agreement, Mississippi Power acts as FP&L's agent with respect to the operation and maintenance of these units. See Note 3 under "Other Matters – Mississippi Power – Plant Daniel" for additional information. (g)Jointly owned with The Williams Companies, Inc., the Dalton Pipeline is a 115-mile natural gas pipeline that serves as an extension of the Transcontinental Gas Pipe Line Company, LLC pipeline system into northwest Georgia. Southern Company Gas leases its 50% undivided ownership for approximately $26 million annually through 2042. The lessee is responsible for maintaining the pipeline during the lease term and for providing service to transportation customers under its FERC-regulated tariff. The Registrants' proportionate share of their jointly-owned facility operating expenses is included in the corresponding operating expenses in the statements of income and each Registrant is responsible for providing its own financing. Assets Subject to Lien Mississippi Power provides retail service to its largest retail customer, Chevron Products Company (Chevron), at its refinery in Pascagoula, Mississippi through at least 2038 in accordance with agreements approved by the Mississippi PSC. The agreements grant Chevron a security interest in the co-generation assets located at the refinery and owned by Mississippi Power, with a lease receivable balance of $147 million at December 31, 2023, that is exercisable upon the occurrence of (i) certain bankruptcy events or (ii) other events of default coupled with specific reductions in steam output at the facility and a downgrade of Mississippi Power's credit rating to below investment grade by two of the three rating agencies. See Note 9 under "Lessor" for additional information. See Note 8 under "Long-term Debt" for information regarding debt secured by certain assets of Georgia Power and Southern Company Gas. 6. ASSET RETIREMENT OBLIGATIONS AROs are computed as the present value of the estimated costs for an asset's future retirement and are recorded in the period in which the liability is incurred. The estimated costs are capitalized as part of the related long-lived asset and depreciated over the asset's useful life. In the absence of quoted market prices, AROs are estimated using present value techniques in which estimates of future cash outlays associated with the asset retirements are discounted using a credit-adjusted risk-free rate. Estimates of the timing and amounts of future cash outlays are based on projections of when and how the assets will be retired and the cost of future removal activities. Each traditional electric operating company and natural gas distribution utility has received accounting guidance from its state PSC or applicable state regulatory agency allowing the continued accrual or recovery of other retirement costs for long-lived assets that it does not have a legal obligation to retire. Accordingly, the accumulated removal costs for these obligations are reflected in the balance sheets as regulatory liabilities and amounts to be recovered are reflected in the balance sheets as regulatory assets. The ARO liabilities for the traditional electric operating companies primarily relate to facilities that are subject to the CCR Rule and the related state rules, principally ash ponds. In addition, Alabama Power and Georgia Power have retirement obligations related to the decommissioning of nuclear facilities (Alabama Power's Plant Farley and Georgia Power's ownership interests in Plant Hatch and Plant Vogtle Units 1 through 3). See "Nuclear Decommissioning" herein for additional information. Other significant AROs include various landfill sites and asbestos removal for Alabama Power, Georgia Power, and Mississippi Power and gypsum cells and mine reclamation for Mississippi Power. The ARO liability for Southern Power primarily relates to its solar and wind facilities, which are located on long-term land leases requiring the restoration of land at the end of the lease. The traditional electric operating companies and Southern Company Gas also have identified other retirement obligations, such as obligations related to certain electric transmission and distribution facilities, certain asbestos-containing material within long-term assets not subject to ongoing repair and maintenance activities, certain wireless communication towers, the disposal of polychlorinated biphenyls in certain transformers, leasehold improvements, equipment on customer property, and property associated with the Southern Company system's rail lines and natural gas pipelines. However, liabilities for the removal of these assets have not been recorded because the settlement timing for certain retirement obligations related to these assets is indeterminable and, therefore, the fair value of the retirement obligations cannot be reasonably estimated. A liability for these retirement obligations will be recognized when sufficient information becomes available to support a reasonable estimation of the ARO. Southern Company and the traditional electric operating companies will continue to recognize in their respective statements of income allowed removal costs in accordance with regulatory treatment. Any differences between costs recognized in accordance with accounting standards related to asset retirement and environmental obligations and those reflected in rates are recognized as either a regulatory asset or liability in the balance sheets as ordered by the various state PSCs. Details of the AROs included in the balance sheets are as follows:
*Included in other deferred credits and liabilities on Southern Power's consolidated balance sheets. In December 2022, Georgia Power recorded a net decrease of approximately $780 million to its AROs related to the CCR Rule and the related state rule resulting from changes in estimates, including lower future inflation rates, higher discount rates, and timing of closure activities, as well as a change in closure methodology for one ash pond as approved in Georgia Power's 2022 IRP. Following initial criticality for Plant Vogtle Unit 3 on March 6, 2023, Georgia Power recorded AROs of approximately $90 million. Subsequent to December 31, 2023, Plant Vogtle Unit 4 achieved initial criticality, which will result in Georgia Power recording AROs of approximately $118 million during the first quarter 2024. See Note 2 under "Georgia Power – Nuclear Construction" for additional information. In September 2023 and November 2023, Georgia Power recorded net decreases of approximately $175 million and $210 million, respectively, to its AROs related to the CCR Rule and the related state rule resulting from changes in estimates, including lower future inflation rates and the timing of closure activities. In June 2023, Alabama Power completed an updated decommissioning cost site study for Plant Farley. The estimated cost of decommissioning based on the study resulted in a decrease in Alabama Power's ARO liability of approximately $15 million. See "Nuclear Decommissioning" herein for additional information. The cost estimates for AROs related to the disposal of CCR are based on information at December 31, 2023 using various assumptions related to closure and post-closure costs, timing of future cash outlays, inflation and discount rates, and the potential methods for complying with the CCR Rule and the related state rules. The traditional electric operating companies have periodically updated, and expect to continue periodically updating, their related cost estimates and ARO liabilities for each CCR unit as additional information related to these assumptions becomes available. Some of these updates have been, and future updates may be, material. The cost estimates for Alabama Power are based on closure-in-place for all ash ponds. The cost estimates for Georgia Power and Mississippi Power are based on a combination of closure-in-place for some ash ponds and closure by removal for others. Additionally, the closure designs and plans in the States of Alabama and Georgia are subject to approval by environmental regulatory agencies. Absent continued recovery of ARO costs through regulated rates, results of operations, cash flows, and financial condition for Southern Company and the traditional electric operating companies could be materially impacted. The ultimate outcome of these matters cannot be determined at this time. See Note 3 under "General Litigation Matters – Alabama Power" for additional information. Nuclear Decommissioning The NRC requires licensees of commercial nuclear power reactors to establish a plan for providing reasonable assurance of funds for future decommissioning. Alabama Power and Georgia Power have external trust funds (Funds) to comply with the NRC's regulations. Use of the Funds is restricted to nuclear decommissioning activities. The Funds are managed and invested in accordance with applicable requirements of various regulatory bodies, including the NRC, the FERC, and state PSCs, as well as the IRS. While Alabama Power and Georgia Power are allowed to prescribe an overall investment policy to the Funds' managers, neither Southern Company nor its subsidiaries or affiliates are allowed to engage in the day-to-day management of the Funds or to mandate individual investment decisions. Day-to-day management of the investments in the Funds is delegated to unrelated third-party managers with oversight by the management of Alabama Power and Georgia Power. The Funds' managers are authorized, within certain investment guidelines, to actively buy and sell securities at their own discretion in order to maximize the return on the Funds' investments. The Funds are invested in a tax-efficient manner in a diversified mix of equity and fixed income securities and are reported as trading securities. Alabama Power and Georgia Power record the investment securities held in the Funds at fair value, as disclosed in Note 13, as management believes that fair value best represents the nature of the Funds. Gains and losses, whether realized or unrealized, are recorded in the regulatory liability for AROs in the balance sheets and are not included in net income or OCI. Fair value adjustments and realized gains and losses are determined on a specific identification basis. Investment securities in the Funds for December 31, 2023 and 2022 were as follows:
*For Southern Company and Georgia Power, these amounts include investment securities pledged to creditors and collateral received and excludes payables related to a securities lending program Georgia Power's Funds previously participated in through the managers of the Funds. Under this program, Georgia Power's Funds' investment securities were loaned to institutional investors for a fee. Securities loaned were fully collateralized by cash, letters of credit, and/or securities issued or guaranteed by the U.S. government or its agencies or instrumentalities. At December 31, 2022, approximately $35 million of the fair market value of Georgia Power's Funds' securities were on loan and pledged to creditors under the Funds' managers' securities lending program. At December 31, 2022, the fair value of the collateral received was approximately $36 million and could only be sold by the borrower upon the return of the loaned securities. The collateral received was treated as a non-cash item in the statements of cash flows. These amounts exclude receivables related to investment income and pending investment sales and payables related to pending investment purchases. The fair value increases (decreases) of the Funds, including unrealized gains (losses) and reinvested interest and dividends and excluding the Funds' expenses, for 2023, 2022, and 2021 are shown in the table below.
The investment securities held in the Funds continue to be managed with a long-term focus. Accordingly, all purchases and sales within the Funds are presented separately in the statements of cash flows as investing cash flows, consistent with the nature of the securities and purpose for which the securities were acquired. For Alabama Power, approximately $13 million and $14 million at December 31, 2023 and 2022, respectively, previously recorded in internal reserves is being transferred into the Funds through 2040 as approved by the Alabama PSC. The NRC's minimum external funding requirements are based on a generic estimate of the cost to decommission only the radioactive portions of a nuclear unit based on the size and type of reactor. Alabama Power and Georgia Power have filed plans with the NRC designed to ensure that, over time, the deposits and earnings of the Funds will provide the minimum funding amounts prescribed by the NRC. At December 31, 2023 and 2022, the accumulated provisions for the external decommissioning trust funds were as follows:
Site study cost is the estimate to decommission a specific facility as of the site study year. The decommissioning cost estimates are based on removal of the plant from service and prompt dismantlement. The actual decommissioning costs may vary from these estimates because of changes in the assumed date of decommissioning, changes in NRC requirements, or changes in the assumptions used in making these estimates. The estimated costs of decommissioning at December 31, 2023 based on the most current studies were as follows:
*Based on Georgia Power's ownership interests. For ratemaking purposes, Alabama Power's decommissioning costs are based on the site study and Georgia Power's decommissioning costs are based on the NRC generic estimate to decommission the radioactive portion of the facilities and the site study estimate for spent fuel management. Significant assumptions used to determine these costs for ratemaking were an estimated inflation rate of 4.5% for Plant Farley, 2.5% for Plants Hatch and Vogtle Units 1 and 2, and 2.4% for Plant Vogtle Unit 3 and an estimated trust earnings rate of 7.0% for Plant Farley, 4.5% for Plants Hatch and Vogtle Units 1 and 2, and 4.4% for Plant Vogtle Unit 3. Amounts previously contributed to the Funds for Plant Farley are currently projected to be adequate to meet the decommissioning obligations. Alabama Power's site-specific estimates of decommissioning costs for Plant Farley are updated every five years. The next site study for Alabama Power is expected to be completed in 2028. Projections of funds are reviewed with the Alabama PSC to ensure that, over time, the deposits and earnings of the Funds will provide adequate funding to cover the site-specific costs. If necessary, Alabama Power would seek the Alabama PSC's approval to address any changes in a manner consistent with NRC and other applicable requirements. Under the 2019 ARP, Georgia Power's annual decommissioning cost for ratemaking in 2021 and 2022 was a total of $4 million for Plant Hatch and Plant Vogtle Units 1 and 2. Effective January 1, 2023, as approved in the 2022 ARP, there is no annual decommissioning cost for ratemaking for Plant Hatch and Plant Vogtle Units 1 and 2. Any funding amount required by the NRC during the period covered by the 2022 ARP will be deferred to a regulatory asset and recovery is expected to be determined in Georgia Power's next base rate case. See Note 2 under "Georgia Power – Rate Plans – 2022 ARP" for additional information. Effective August 1, 2023, as approved under the Plant Vogtle Unit 3 and Common Facilities rate proceeding, Georgia Power's annual decommissioning cost for ratemaking is $8 million for Plant Vogtle Unit 3. See Note 2 under "Georgia Power – Nuclear Construction – Regulatory Matters" for additional information. 7. CONSOLIDATED ENTITIES AND EQUITY METHOD INVESTMENTS The Registrants may hold ownership interests in a number of business ventures with varying ownership structures. Partnership interests and other variable interests are evaluated to determine if each entity is a VIE. If a venture is a VIE for which a Registrant is the primary beneficiary, the assets, liabilities, and results of operations of the entity are consolidated. The Registrants reassess the conclusion as to whether an entity is a VIE upon certain occurrences, which are deemed reconsideration events. For entities that are not determined to be VIEs, the Registrants evaluate whether they have control or significant influence over the investee to determine the appropriate consolidation and presentation. Generally, entities under the control of a Registrant are consolidated, and entities over which a Registrant can exert significant influence, but which a Registrant does not control, are accounted for under the equity method of accounting. Investments accounted for under the equity method are recorded within equity investments in unconsolidated subsidiaries in the balance sheets and, for Southern Company and Southern Company Gas, the equity income is recorded within earnings from equity method investments in the statements of income. See "SEGCO" and "Southern Company Gas" herein for additional information. Southern Company At December 31, 2023 and 2022, Southern Holdings had equity method investments totaling $126 million and $112 million, respectively, primarily related to investments in venture capital funds focused on energy and utility investments. Earnings from these investments were immaterial for all periods presented. SEGCO Alabama Power and Georgia Power own equally all of the outstanding capital stock of SEGCO, which owns electric generating units at Plant Gaston with a total rated capacity of 1,020 MWs, as well as associated transmission facilities. Retirement of SEGCO's generating units is currently expected to occur by December 31, 2028. However, Alabama Power, in conjunction with Georgia Power, is evaluating extending the operation of Plant Gaston Units 1 through 4 beyond the indicated retirement date. See Note 2 under "Georgia Power – Integrated Resource Plans" for additional information. Alabama Power and Georgia Power account for SEGCO using the equity method; Southern Company consolidates SEGCO. The capacity of these units is sold equally to Alabama Power and Georgia Power. Alabama Power and Georgia Power make payments sufficient to provide for the operating expenses, taxes, interest expense, and a ROE. The share of purchased power included in purchased power, affiliates in the statements of income totaled $112 million in 2023, $124 million in 2022, and $75 million in 2021 for Alabama Power and $115 million in 2023, $127 million in 2022, and $77 million in 2021 for Georgia Power. SEGCO paid dividends of $25 million in 2023, $14 million in 2022, and $14 million in 2021, one half of which were paid to each of Alabama Power and Georgia Power. In addition, Alabama Power and Georgia Power each recognize 50% of SEGCO's net income. Alabama Power, which owns and operates a generating unit adjacent to the SEGCO generating units, has a joint ownership agreement with SEGCO for the ownership of an associated gas pipeline. Alabama Power owns 14% of the pipeline with the remaining 86% owned by SEGCO. See Note 3 under "Guarantees" for additional information regarding guarantees of Alabama Power and Georgia Power related to SEGCO. Southern Power Variable Interest Entities Southern Power has certain subsidiaries that are determined to be VIEs. Southern Power is considered the primary beneficiary of these VIEs because it controls the most significant activities of the VIEs, including operating and maintaining the respective assets, and has the obligation to absorb expected losses of these VIEs to the extent of its equity interests. SP Solar and SP Wind SP Solar is owned by Southern Power and a limited partner. A wholly-owned subsidiary of Southern Power is the general partner and holds a 1% ownership interest, and another wholly-owned subsidiary of Southern Power owns a 66% ownership interest. The limited partner holds the remaining 33% noncontrolling interest. SP Solar qualifies as a VIE since the arrangement is structured as a limited partnership and the 33% limited partner does not have substantive kick-out rights against the general partner. At December 31, 2023 and 2022, SP Solar had total assets of $5.6 billion and $5.9 billion, respectively, total liabilities of $0.4 billion, and noncontrolling interests of $1.0 billion and $1.1 billion, respectively. Cash distributions from SP Solar are allocated 67% to Southern Power and 33% to the limited partner in accordance with their partnership interest percentage. Under the terms of the limited partnership agreement, distributions without limited partner consent are limited to available cash and SP Solar is obligated to distribute all such available cash to its partners each quarter. Available cash includes all cash generated in the quarter subject to the maintenance of appropriate operating reserves. SP Wind is owned by Southern Power and three financial investors. A wholly-owned subsidiary of Southern Power owns 100% of the Class B membership interests and the three financial investors own 100% of the Class A membership interests. SP Wind qualifies as a VIE since the structure of the arrangement is similar to a limited partnership and the Class A members do not have substantive kick-out rights against Southern Power. At December 31, 2023 and 2022, SP Wind had total assets of $2.1 billion and $2.2 billion, respectively, total liabilities of $187 million and $169 million, respectively, and noncontrolling interests of $38 million and $39 million, respectively. Under the terms of the limited liability agreement, distributions without Class A member consent are limited to available cash and SP Wind is obligated to distribute all such available cash to its members each quarter. Available cash includes all cash generated in the quarter subject to the maintenance of appropriate operating reserves. Cash distributions from SP Wind are generally allocated 60% to Southern Power and 40% to the three financial investors in accordance with the limited liability agreement. Southern Power consolidates both SP Solar and SP Wind, as the primary beneficiary, since it controls the most significant activities of each entity, including operating and maintaining their assets. Certain transfers and sales of the assets in the VIEs are subject to partner consent and the liabilities are non-recourse to the general credit of Southern Power. Liabilities consist of customary working capital items and do not include any long-term debt. Other Variable Interest Entities Southern Power has other consolidated VIEs that relate to certain subsidiaries that have either sold noncontrolling interests to tax equity investors or acquired less than a 100% interest from facility developers. These entities are considered VIEs because the arrangements are structured similar to a limited partnership and the noncontrolling members do not have substantive kick-out rights. At December 31, 2023 and 2022, the other VIEs had total assets of $1.7 billion and $1.8 billion, respectively, total liabilities of $0.2 billion, and noncontrolling interests of $0.8 billion. Under the terms of the partnership agreements, distributions of all available cash are required each month or quarter and additional distributions require partner consent. Equity Method Investments During 2023 and 2022, Southern Power sold its remaining equity method investments in wind projects and received proceeds totaling $50 million and $38 million, respectively. Earnings (loss) from these investments, including the gains associated with the sales, were immaterial for all periods presented. Southern Company Gas Equity Method Investments The carrying amounts of Southern Company Gas' equity method investments at December 31, 2023 and 2022 and related earnings (loss) from those investments for the years ended December 31, 2023, 2022, and 2021 were as follows:
*For 2021, includes pre-tax impairment charges totaling $84 million. See "PennEast Pipeline Project" herein for additional information, including the September 2021 cancellation of the project. PennEast Pipeline Project In 2014, Southern Company Gas entered into a partnership in which it holds a 20% ownership interest in the PennEast Pipeline, an interstate pipeline company formed to develop and operate an approximate 118-mile natural gas pipeline between New Jersey and Pennsylvania. In 2019, an appellate court ruled that the PennEast Pipeline does not have federal eminent domain authority over lands in which a state has property rights interests. In June 2021, the U.S. Supreme Court ruled in favor of PennEast Pipeline following a review of the appellate court decision. Southern Company Gas assesses its equity method investments for impairment whenever events or changes in circumstances indicate that the investment may be impaired. Following the U.S. Supreme Court ruling, during the second quarter 2021, Southern Company Gas management reassessed the project construction timing, including the anticipated timing for receipt of a FERC certificate and all remaining state and local permits, as well as potential challenges thereto, and performed an impairment analysis. The outcome of the analysis resulted in a pre-tax impairment charge of $82 million ($58 million after tax). In September 2021, PennEast Pipeline announced that further development of the project was no longer supported, and, as a result, all further development of the project ceased. During the third quarter 2021, Southern Company Gas recorded an additional pre-tax charge of $2 million ($2 million after tax) related to its share of the project level impairment, as well as $7 million of additional tax expense, resulting in total pre-tax charges of $84 million ($67 million after tax) during 2021 related to the project. 8. FINANCING Long-term Debt Details of long-term debt at December 31, 2023 and 2022 are provided in the following table:
(a)Includes a fair value gain (loss) of $(12) million and $(31) million at December 31, 2023 and 2022, respectively, related to Southern Power's foreign currency hedge on its euro-denominated senior notes. (b)Secured by a first priority lien on (i) Georgia Power's undivided ownership interest in Plant Vogtle Units 3 and 4 (primarily the units, the related real property, and any nuclear fuel loaded in the reactor core) and (ii) Georgia Power's rights and obligations under the principal contracts relating to Plant Vogtle Units 3 and 4. See "DOE Loan Guarantee Borrowings" herein for additional information. (c)Revenue bond obligations represent loans to the traditional electric operating companies from public authorities of funds derived from sales by such authorities of revenue bonds issued to finance pollution control and solid waste disposal and wastewater facilities. In some cases, the revenue bond obligations represent obligations under installment sales agreements with respect to facilities constructed with the proceeds of revenue bonds issued by public authorities. The traditional electric operating companies are required to make payments sufficient for the authorities to meet principal and interest requirements of such bonds. Proceeds from certain issuances are restricted until qualifying expenditures are incurred. (d)Secured by substantially all of Nicor Gas' properties. (e)Secured by the underlying lease ROU asset. See Note 9 for additional information. Maturities of long-term debt for the next five years are as follows:
(a)See notes (b) and (c) below. (b)Alabama Power's 2024 maturities include $200 million aggregate principal amount of Series 2023A Floating Rate Senior Notes due May 15, 2073 that are repayable at the option of the holders at certain dates beginning in 2024. As a result, the senior notes are classified as securities due within one year on the balance sheets of Southern Company and Alabama Power at December 31, 2023. (c)Amounts include principal amortization related to the FFB borrowings; however, the final maturity date is February 20, 2044. See "DOE Loan Guarantee Borrowings" herein for additional information. (d)Southern Power's 2026 maturities include $564 million of euro-denominated debt at the U.S. dollar denominated hedge settlement amount. DOE Loan Guarantee Borrowings Pursuant to the loan guarantee program established under Title XVII of the Energy Policy Act of 2005 (Title XVII Loan Guarantee Program), Georgia Power and the DOE entered into a loan guarantee agreement in 2014 and the Amended and Restated Loan Guarantee Agreement in 2019. Under the Amended and Restated Loan Guarantee Agreement, the DOE agreed to guarantee the obligations of Georgia Power under the FFB Credit Facilities. Under the FFB Credit Facilities, Georgia Power was authorized to make term loan borrowings through the FFB in an amount up to approximately $5.130 billion, provided that total aggregate borrowings under the FFB Credit Facilities could not exceed 70% of (i) Eligible Project Costs minus (ii) approximately $1.492 billion (reflecting the amounts received by Georgia Power under the Guarantee Settlement Agreement less the related customer refunds). In 2021, Georgia Power made the final borrowings under the FFB Credit Facilities and no further borrowings are permitted. During 2023, Georgia Power made principal amortization payments of $86 million under the FFB Credit Facilities. At December 31, 2023 and 2022, Georgia Power had $4.8 billion and $4.9 billion of borrowings outstanding under the FFB Credit Facilities, respectively. All borrowings under the FFB Credit Facilities are full recourse to Georgia Power, and Georgia Power is obligated to reimburse the DOE for any payments the DOE is required to make to the FFB under its guarantee. Georgia Power's reimbursement obligations to the DOE are full recourse and secured by a first priority lien on (i) Georgia Power's undivided ownership interest in Plant Vogtle Units 3 and 4 (primarily the units, the related real property, and any nuclear fuel loaded in the reactor core) and (ii) Georgia Power's rights and obligations under the principal contracts relating to Plant Vogtle Units 3 and 4. There are no restrictions on Georgia Power's ability to grant liens on other property. The final maturity date for each advance under the FFB Credit Facilities is February 20, 2044. Interest is payable quarterly and principal payments began in 2020. Each borrowing under the FFB Credit Facilities bears interest at a fixed rate equal to the applicable U.S. Treasury rate at the time of the borrowing plus a spread equal to 0.375%. Under the Amended and Restated Loan Guarantee Agreement, Georgia Power is subject to customary borrower affirmative and negative covenants and events of default. In addition, Georgia Power is subject to project-related reporting requirements and other project-specific covenants and events of default. In the event certain mandatory prepayment events occur, Georgia Power will be required to prepay the outstanding principal amount of all borrowings under the FFB Credit Facilities over a period of five years (with level principal amortization). Among other things, these mandatory prepayment events include (i) the termination of the Vogtle Services Agreement or rejection of the Vogtle Services Agreement in any Westinghouse bankruptcy if Georgia Power does not maintain access to intellectual property rights under the related intellectual property licenses; (ii) termination of the Bechtel Agreement by Bechtel or in connection with a cancellation of Plant Vogtle Units 3 and 4, unless the Vogtle Owners enter into a replacement agreement; (iii) cancellation of Plant Vogtle Unit 4 by the Georgia PSC or by Georgia Power; (iv) failure of the holders of 90% of the ownership interests in Plant Vogtle Units 3 and 4 to vote to continue construction following certain schedule extensions; (v) cost disallowances by the Georgia PSC that could have a material adverse effect on completion of Plant Vogtle Unit 4 or Georgia Power's ability to repay the outstanding borrowings under the FFB Credit Facilities; or (vi) loss of or failure to receive necessary regulatory approvals. Under certain circumstances, insurance proceeds and any proceeds from an event of taking must be applied to immediately prepay outstanding borrowings under the FFB Credit Facilities. Georgia Power also may voluntarily prepay outstanding borrowings under the FFB Credit Facilities. Under the FFB Credit Facilities, any prepayment (whether mandatory or optional) will be made with a make-whole premium or discount, as applicable. In connection with any cancellation of Plant Vogtle Unit 4, the DOE may elect to continue construction of Plant Vogtle Unit 4. In such an event, the DOE will have the right to assume Georgia Power's rights and obligations under the principal agreements relating to Plant Vogtle Units 3 and 4 and to acquire all or a portion of Georgia Power's ownership interest in Plant Vogtle Units 3 and 4. See Note 2 under "Georgia Power – Nuclear Construction" for additional information. Secured Debt Each of Southern Company's subsidiaries is organized as a legal entity, separate and apart from Southern Company and its other subsidiaries. There are no agreements or other arrangements among the Southern Company system companies under which the assets of one company have been pledged or otherwise made available to satisfy obligations of Southern Company or any of its other subsidiaries. As discussed under "Long-term Debt" herein, the Registrants had secured debt outstanding at December 31, 2023 and 2022. Each Registrant's senior notes, junior subordinated notes, revenue bond obligations, bank term loans, credit facility borrowings, and notes payable are effectively subordinated to all secured debt of each respective Registrant. Equity Units In May 2022, Southern Company remarketed $862.5 million aggregate principal amount of its Series 2019A Remarketable Junior Subordinated Notes due August 1, 2024 (2019A RSNs) and $862.5 million aggregate principal amount of its Series 2019B Remarketable Junior Subordinated Notes due August 1, 2027 (2019B RSNs), pursuant to the terms of its 2019 Series A Equity Units (Equity Units). In connection with the remarketing, the interest rates on the 2019A RSNs and the 2019B RSNs were reset to 4.475% and 5.113%, respectively, payable on a semi-annual basis. In August 2022, the proceeds were ultimately used to settle the purchase contracts entered into as part of the Equity Units and Southern Company issued approximately 25.2 million shares of common stock and received proceeds of $1.725 billion. At December 31, 2023 and 2022, the 2019A RSNs and the 2019B RSNs are included on Southern Company's consolidated balance sheets in long-term debt or, as applicable, securities due within one year. Convertible Senior Notes In February 2023, Southern Company issued $1.5 billion aggregate principal amount of Series 2023A 3.875% Convertible Senior Notes due December 15, 2025 (Series 2023A Convertible Senior Notes). In March 2023, Southern Company issued an additional $225 million aggregate principal amount of the Series 2023A Convertible Senior Notes upon the exercise by the initial purchasers of their over-allotment option. Interest on the Series 2023A Convertible Senior Notes is payable semiannually, which began on June 15, 2023. The Series 2023A Convertible Senior Notes will mature on December 15, 2025, unless earlier converted or repurchased, but are not redeemable at the option of Southern Company. The Series 2023A Convertible Senior Notes are direct, unsecured, and unsubordinated obligations of Southern Company, ranking equally with all of Southern Company's other unsecured and unsubordinated indebtedness from time to time outstanding, and are effectively subordinated to all secured indebtedness of Southern Company. Holders may convert their Series 2023A Convertible Senior Notes at their option prior to the close of business on the business day preceding September 15, 2025, but only under the following circumstances: *during any calendar quarter (and only during such calendar quarter), if the last reported sale price of Southern Company's common stock for at least 20 trading days (whether or not consecutive) during the period of 30 consecutive trading days ending on, and including, the last trading day of the immediately preceding calendar quarter is greater than or equal to 130% of the conversion price on each applicable trading day as determined by Southern Company; *during the five business day period after any 10 consecutive trading day period (Measurement Period) in which the trading price per $1,000 principal amount of Series 2023A Convertible Senior Notes for each trading day of the Measurement Period was less than 98% of the product of the last reported sale price of the common stock and the conversion rate on each such trading day; or *upon the occurrence of certain corporate events specified in the indenture governing the Series 2023A Convertible Senior Notes. On or after September 15, 2025, a holder may convert all or any portion of its Series 2023A Convertible Senior Notes at any time prior to the close of business on the second scheduled trading day immediately preceding the maturity date regardless of the foregoing conditions. Southern Company will settle conversions of the Series 2023A Convertible Senior Notes by paying cash up to the aggregate principal amount of the Series 2023A Convertible Senior Notes to be converted and paying or delivering, as the case may be, cash, shares of common stock or a combination of cash and shares of common stock, at Southern Company's election, in respect of the remainder, if any, of Southern Company's conversion obligation in excess of the aggregate principal amount of the Series 2023A Convertible Senior Notes being converted. The Series 2023A Convertible Senior Notes are initially convertible at a rate of 11.8818 shares of common stock per $1,000 principal amount converted, which is approximately equal to $84.16 per share of common stock. The conversion rate will be subject to adjustment upon the occurrence of certain specified events but will not be adjusted for accrued and unpaid interest. In addition, upon the occurrence of a make-whole fundamental change (as defined in the indenture governing the Series 2023A Convertible Senior Notes), Southern Company will, in certain circumstances, increase the conversion rate by a number of additional shares of common stock for conversions in connection with the make-whole fundamental change. Upon the occurrence of a fundamental change (as defined in the indenture governing the Series 2023A Convertible Senior Notes), holders of the Series 2023A Convertible Senior Notes may require Southern Company to purchase all or a portion of their Series 2023A Convertible Senior Notes, in principal amounts equal to $1,000 or an integral multiple thereof, for cash at a price equal to 100% of the principal amount of the Series 2023A Convertible Senior Notes to be purchased plus any accrued and unpaid interest. Bank Credit Arrangements At December 31, 2023, committed credit arrangements with banks were as follows:
(a)Arrangement expiring in 2028 represents a $2.45 billion combined arrangement for Southern Company and Southern Power as borrowers. Pursuant to the combined facility, the allocations between Southern Company and Southern Power may be adjusted. (b)Does not include Southern Power Company's $75 million and $100 million continuing letter of credit facilities for standby letters of credit, expiring in 2025 and 2026, respectively, of which $8 million and $7 million, respectively, was unused at December 31, 2023. Southern Power's subsidiaries are not parties to its bank credit arrangements or letter of credit facilities. (c)Southern Company Gas, as the parent entity, guarantees the obligations of Southern Company Gas Capital, which is the borrower of $800 million of the credit arrangement expiring in 2028. Southern Company Gas' committed credit arrangement expiring in 2028 also includes $700 million for which Nicor Gas is the borrower and which is restricted for working capital needs of Nicor Gas. Pursuant to the multi-year credit arrangement expiring in 2028, the allocations between Southern Company Gas Capital and Nicor Gas may be adjusted. Nicor Gas is also the borrower under a $100 million credit arrangement expiring in 2024. See "Structural Considerations" herein for additional information. The bank credit arrangements require payment of commitment fees based on the unused portion of the commitments. Commitment fees average less than 1/4 of 1% for the Registrants and Nicor Gas. Subject to applicable market conditions, Southern Company and its subsidiaries expect to renew or replace their bank credit arrangements as needed, prior to expiration. In connection therewith, Southern Company and its subsidiaries may extend the maturity dates and/or increase or decrease the lending commitments thereunder. These bank credit arrangements, as well as the term loan arrangements of the Registrants, Nicor Gas, and SEGCO, contain covenants that limit debt levels and contain cross-acceleration provisions to other indebtedness (including guarantee obligations) that are restricted only to the indebtedness of the individual company. The cross-acceleration provisions to other indebtedness would trigger an event of default if the applicable borrower defaulted on indebtedness, the payment of which was then accelerated. Southern Company's, certain of Mississippi Power's, Southern Company Gas', and Nicor Gas' credit arrangements contain covenants that limit debt levels to 70% of total capitalization, as defined in the agreements, and the other subsidiaries' bank credit arrangements contain covenants that limit debt levels to 65% of total capitalization, as defined in the agreements. For purposes of these definitions, debt excludes junior subordinated notes and, in certain arrangements, other hybrid securities. Additionally, for Southern Company and Southern Power, for purposes of these definitions, debt excludes any project debt incurred by certain subsidiaries of Southern Power to the extent such debt is non-recourse to Southern Power and capitalization excludes the capital stock or other equity attributable to such subsidiaries. At December 31, 2023, the Registrants, Nicor Gas, and SEGCO were in compliance with all such covenants. None of the bank credit arrangements contain material adverse change clauses at the time of borrowings. A portion of the unused credit with banks is allocated to provide liquidity support to certain revenue bonds of the traditional electric operating companies and the commercial paper programs of the Registrants, Nicor Gas, and SEGCO. At December 31, 2023, outstanding variable rate demand revenue bonds of the traditional electric operating companies with allocated liquidity support totaled approximately $1.7 billion (comprised of approximately $818 million at Alabama Power, $819 million at Georgia Power, and $69 million at Mississippi Power). In addition, at December 31, 2023, Georgia Power had approximately $325 million of fixed rate revenue bonds outstanding that are required to be remarketed within the next 12 months. The variable rate demand revenue bonds and fixed rate revenue bonds required to be remarketed within the next 12 months are classified as long-term debt on the balance sheets as a result of available long-term committed credit. At both December 31, 2023 and 2022, Southern Power had $106 million of cash collateral posted related to PPA requirements, which is included in other deferred charges and assets on Southern Power's consolidated balance sheets. Notes Payable The Registrants, Nicor Gas, and SEGCO make short-term borrowings primarily through commercial paper programs that have the liquidity support of the committed bank credit arrangements described above under "Bank Credit Arrangements." Southern Power's subsidiaries are not parties or obligors to its commercial paper program. Southern Company Gas maintains commercial paper programs at Southern Company Gas Capital and at Nicor Gas. Nicor Gas' commercial paper program supports working capital needs at Nicor Gas as Nicor Gas is not permitted to make money pool loans to affiliates. All of Southern Company Gas' other subsidiaries benefit from Southern Company Gas Capital's commercial paper program. See "Structural Considerations" herein for additional information. In addition, Southern Company and certain of its subsidiaries have entered into various bank term loan agreements. Unless otherwise stated, the proceeds of these loans were used to repay existing indebtedness and for general corporate purposes, including working capital and, for the subsidiaries, their continuous construction programs. Commercial paper and short-term bank term loans are included in notes payable in the balance sheets. Details of short-term borrowings for the applicable Registrants were as follows:
See "Bank Credit Arrangements" herein for information on bank term loan covenants that limit debt levels and cross-acceleration or cross-default provisions. Outstanding Classes of Capital Stock Southern Company Common Stock Stock Issued During 2023, Southern Company issued approximately 2.1 million shares of common stock primarily through equity compensation plans and received proceeds of approximately $36 million. Shares Reserved At December 31, 2023, a total of 131 million shares were reserved for issuance pursuant to the Southern Investment Plan, employee savings plans, the Equity and Incentive Compensation Plan (which includes stock options and performance share units as discussed in Note 12), an at-the-market program, and the Series 2023A Convertible Senior Notes (as discussed under "Convertible Senior Notes" herein). Of the shares reserved, 26.9 million shares are available for awards under the Equity and Incentive Compensation Plan at December 31, 2023. Diluted Earnings Per Share For Southern Company, the only difference in computing basic and diluted earnings per share (EPS) is attributable to awards outstanding under stock-based compensation plans and the Series 2023A Convertible Senior Notes. EPS dilution resulting from stock-based compensation plans is determined using the treasury stock method and EPS dilution resulting from the Series 2023A Convertible Senior Notes is determined using the net share settlement method. See Note 12 and "Convertible Senior Notes" herein for additional information. Shares used to compute diluted EPS were as follows:
For 2023, there were no anti-dilutive shares. For 2022 and 2021, an immaterial number of stock-based compensation awards was excluded from the diluted EPS calculation because the awards were anti-dilutive. For all periods presented, there was no dilution resulting from the Series 2023A Convertible Senior Notes. Preferred Stock of Subsidiaries As discussed further under "Alabama Power" herein, during 2022, Alabama Power redeemed all of its preferred stock and Class A preferred stock. Alabama Power Alabama Power has preferred stock, Class A preferred stock, preference stock, and common stock authorized, but only common stock outstanding at December 31, 2023. During 2022, Alabama Power redeemed all of its preferred stock and Class A preferred stock at the redemption prices per share provided in the table below, plus accrued and unpaid dividends to the redemption date.
Georgia Power Georgia Power has preferred stock, Class A preferred stock, preference stock, and common stock authorized, but only common stock outstanding. Mississippi Power Mississippi Power has preferred stock and common stock authorized, but only common stock outstanding. Dividend Restrictions The income of Southern Company is derived primarily from equity in earnings of its subsidiaries. At December 31, 2023, consolidated retained earnings included $5.5 billion of undistributed retained earnings of the subsidiaries. The traditional electric operating companies and Southern Power can only pay dividends to Southern Company out of retained earnings or paid-in-capital. See Note 7 under "Southern Power" for information regarding the distribution requirements for certain Southern Power subsidiaries. By regulation, Nicor Gas is restricted, up to its retained earnings balance, in the amount it can dividend or loan to affiliates and is not permitted to make money pool loans to affiliates. At December 31, 2023, the amount of Southern Company Gas' subsidiary retained earnings available for dividend payment totaled $1.7 billion. Structural Considerations Since Southern Company and Southern Company Gas are holding companies, the right of Southern Company and Southern Company Gas and, hence, the right of creditors of Southern Company or Southern Company Gas to participate in any distribution of the assets of any respective subsidiary of Southern Company or Southern Company Gas, whether upon liquidation, reorganization or otherwise, is subject to prior claims of creditors and preferred stockholders of such subsidiary. Southern Company Gas' 100%-owned subsidiary, Southern Company Gas Capital, was established to provide for certain of Southern Company Gas' ongoing financing needs through a commercial paper program, the issuance of various debt, hybrid securities, and other financing arrangements. Southern Company Gas fully and unconditionally guarantees all debt issued by Southern Company Gas Capital. Nicor Gas is not permitted by regulation to make loans to affiliates or utilize Southern Company Gas Capital for its financing needs. Southern Power Company's senior notes, bank term loan, commercial paper, and bank credit arrangement are unsecured senior indebtedness, which rank equally with all other unsecured and unsubordinated debt of Southern Power Company. Southern Power's subsidiaries are not issuers, borrowers, or obligors, as applicable, under any of these unsecured senior debt arrangements, which are effectively subordinated to any future secured debt of Southern Power Company and any potential claims of creditors of Southern Power's subsidiaries. 9. LEASES Lessee The Registrants recognize leases with a term of greater than 12 months on the balance sheet as lease obligations, representing the discounted future fixed payments due, along with ROU assets that will be amortized over the term of each lease. As lessee, the Registrants lease certain electric generating units (including renewable energy facilities), real estate/land, communication towers, railcars, and other equipment and vehicles. The major categories of lease obligations are as follows:
*Amounts related to affiliate leases are eliminated in consolidation for Southern Company. See "Contracts that Contain a Lease" herein for additional information. Real estate/land leases primarily consist of commercial real estate leases at Southern Company, Georgia Power, and Southern Company Gas and various land leases primarily associated with renewable energy facilities at Southern Power. The commercial real estate leases have remaining terms of up to 27 years while the land leases have remaining terms of up to 44 years, including renewal periods. Communication towers are leased for the installation of equipment to provide cellular phone service to customers and to support the automated meter infrastructure programs at the traditional electric operating companies and Nicor Gas. Communication tower leases have remaining terms of up to 17 years. Renewal options exist in many of the leases. The expected term used in calculating the lease obligation generally reflects only the noncancelable period of the lease unless it is considered reasonably certain that the lease will be extended. Land leases associated with renewable energy facilities at Southern Power and communication tower leases for automated meter infrastructure at Nicor Gas include renewal periods reasonably certain of exercise resulting in an expected lease term at least equal to the expected life of the renewable energy facilities and the automated meter infrastructure, respectively. Contracts that Contain a Lease While not specifically structured as a lease, some of the PPAs at Alabama Power and Georgia Power are deemed to represent a lease of the underlying electric generating units when the terms of the PPA convey the right to control the use of the underlying assets. Amounts recorded for leases of electric generating units are generally based on the amount of scheduled capacity payments due over the remaining term of the PPA, which varies between one and 16 years. Georgia Power has several PPAs with Southern Power that Georgia Power accounts for as leases with a lease obligation of $416 million and $461 million at December 31, 2023 and 2022, respectively. The amount paid for energy under these affiliate PPAs reflects a price that would be paid in an arm's-length transaction as reviewed and approved by the Georgia PSC. Amounts related to the affiliate PPAs are eliminated in consolidation for Southern Company. Short-term Leases Leases with an initial term of 12 months or less are not recorded on the balance sheet; the Registrants generally recognize lease expense for these leases on a straight-line basis over the lease term. Residual Value Guarantees Residual value guarantees exist primarily in railcar leases at Alabama Power and Georgia Power and the amounts probable of being paid under those guarantees are included in the lease payments. All such amounts are immaterial at December 31, 2023 and 2022. Lease and Nonlease Components For all asset categories, with the exception of electric generating units, gas pipelines, and real estate leases, the Registrants combine lease payments and any nonlease components, such as asset maintenance, for purposes of calculating the lease obligation and the right-of-use asset. Balance sheet amounts recorded for operating and finance leases are as follows:
*Includes operating lease obligations related to PPAs at Southern Company, Alabama Power, and Georgia Power totaling $566 million, $58 million, and $813 million, respectively, at December 31, 2023 and $652 million, $59 million, and $952 million, respectively, at December 31, 2022. If not presented separately on the Registrants' balance sheets, amounts related to leases are presented as follows: operating lease ROU assets, net are included in "other deferred charges and assets"; operating lease obligations are included in "other current liabilities" and "other deferred credits and liabilities," as applicable; finance lease ROU assets, net are included in "plant in service"; and finance lease obligations are included in "securities due within one year" and "long-term debt," as applicable. Lease costs for 2023, 2022, and 2021, which includes both amounts recognized as operations and maintenance expense and amounts capitalized as part of the cost of another asset, are as follows:
*Includes operating lease costs related to PPAs at Southern Company, Alabama Power, and Georgia Power totaling $112 million, $4 million, and $174 million, respectively, in 2023, $162 million, $48 million, and $180 million, respectively, in 2022, and $165 million, $47 million, and $184 million, respectively, in 2021. Georgia Power has variable lease payments that are based on the amount of energy produced by certain renewable generating facilities subject to PPAs, including $42 million, $45 million, and $41 million in 2023, 2022, and 2021, respectively, from finance leases which are included in purchased power on Georgia Power's statements of income, of which $21 million, $21 million, and $20 million was included in purchased power, affiliates in 2023, 2022, and 2021, respectively. Other information with respect to cash and noncash activities related to leases, as well as weighted-average lease terms and discount rates, is as follows:
Maturities of lease liabilities are as follows:
Payments made under PPAs at Georgia Power for energy generated from certain renewable energy facilities accounted for as operating and finance leases are considered variable lease costs and are therefore not reflected in the above maturity analysis. Lessor The Registrants are each considered lessors in various arrangements that have been determined to contain a lease due to the customer's ability to control the use of the underlying asset owned by the applicable Registrant. For the traditional electric operating companies, these arrangements consist of outdoor lighting contracts accounted for as operating leases with initial terms of up to 10 years, after which the contracts renew on a month-to-month basis at the customer's option. For Mississippi Power, these arrangements also include a tolling arrangement related to an electric generating unit accounted for as a sales-type lease with a remaining term of 15 years. For Southern Power, these arrangements consist of PPAs related to electric generating units accounted for as operating leases with remaining terms of up to 23 years and PPAs related to battery energy storage facilities accounted for as sales-type leases with remaining terms of up to 18 years. Southern Company Gas is the lessor in operating leases related to gas pipelines with remaining terms of up to 19 years. For Southern Company, these arrangements also include PPAs related to fuel cells accounted for as operating leases with remaining terms of up to 10 years. Lease income for 2023, 2022, and 2021, is as follows:
Lease payments received under tolling arrangements and PPAs consist of either scheduled payments or variable payments based on the amount of energy produced by the underlying electric generating units. Lease income related to PPAs for Alabama Power and Southern Power is included in wholesale revenues. Scheduled payments to be received under outdoor lighting contracts, tolling arrangements, and PPAs accounted for as leases are presented in the following maturity analyses. Mississippi Power has a tolling arrangement accounted for as a sales-type lease. During 2021, Mississippi Power completed construction of additional leased assets under the lease and, upon completion, the book value of $39 million was transferred from CWIP to lease receivables. The transfer represented a non-cash investing transaction for purposes of the statements of cash flows. During 2021, Southern Power completed construction of a portion of the Garland and Tranquillity battery energy storage facilities' assets and recorded losses totaling $40 million upon commencement of the related PPAs, which Southern Power accounts for as sales-type leases. The losses were due to ITCs retained and expected to be realized by Southern Power and its partners in these projects, and no estimated residual asset value was assumed in calculating the losses. Each lease had an initial term of 20 years. Upon commencement of the leases, the book values of the related assets totaling $210 million were derecognized from CWIP and lease receivables were recorded. The transfers represented noncash investing transactions for purposes of the statement of cash flows. See Note 15 under "Southern Power" for additional information. The undiscounted cash flows expected to be received for in-service leased assets under the leases are as follows:
*For Mississippi Power, included in other current assets and other property and investments on the balance sheets. For Southern Power, included in other current assets ($15 million and $15 million at December 31, 2023 and 2022, respectively) and net investment in sales-type leases ($148 million and $154 million at December 31, 2023 and 2022, respectively) on the balance sheet. The undiscounted cash flows to be received under operating leases and contracts accounted for as operating leases are as follows:
Southern Power receives payments for renewable energy under PPAs accounted for as operating leases that are considered contingent rents and are therefore not reflected in the table above. Alabama Power and Southern Power allocate revenue to the nonlease components of PPAs based on the stand-alone selling price of capacity and energy. The undiscounted cash flows to be received under outdoor lighting contracts accounted for as operating leases at Georgia Power and Mississippi Power are immaterial. Southern Company Leveraged Lease At December 31, 2020, a subsidiary of Southern Holdings had four leveraged lease agreements related to energy generation, distribution, and transportation assets, including two domestic and two international projects. During 2021, one of the domestic projects was sold and the agreements for both international projects were terminated. At December 31, 2023, the one remaining leveraged lease agreement, which relates to energy generation, had an expected remaining term of eight years. Southern Company continues to receive federal income tax deductions for depreciation and amortization, as well as interest on long-term debt related to this investment. Southern Company wrote off the related investment balance in 2020 following an evaluation of the recoverability of the lease receivable and the expected residual value of the generation assets at the end of the lease. The following table provides a summary of the components of income related to leveraged lease investments. Income was impacted in 2021 by the impairment charges discussed below and in Note 15 under "Southern Company." Income in 2021 does not include the impacts of the sale and terminations of leveraged lease projects discussed in Note 15 under "Southern Company."
In June 2022, the Southern Holdings subsidiary operating the generating plant for the lessee provided notice to the lessee to terminate the related operating and maintenance agreement effective June 30, 2023. Subsequently, the lessee failed to make the semi-annual lease payment due in December 2022. As a result, the Southern Holdings subsidiary was unable to make its corresponding payment to the holders of the underlying non-recourse debt related to the generation assets. The parties to the lease entered into forbearance agreements which suspended the related contractual rights of the parties while they continued restructuring negotiations, during which the termination date for the operating and maintenance agreement was delayed until July 31, 2023. The negotiations were completed on July 14, 2023, resulting in the Southern Holdings subsidiary agreeing to continue operating the plant for the lessee until the lessee's associated power off-take agreement ends in 2032, subject to certain terms and conditions. The restructuring had no material impact on Southern Company's financial statements. Southern Company will continue to monitor the operational performance of the underlying assets and evaluate the ability of the lessee to continue to meet its obligations, including those associated with a future closure or retirement of the generation assets and associated properties, including the dry ash landfill. 10. INCOME TAXES Southern Company files a consolidated federal income tax return and the Registrants file various state income tax returns, some of which are combined or unitary. Under a joint consolidated income tax allocation agreement, each Southern Company subsidiary's current and deferred tax expense is computed on a stand-alone basis, and each subsidiary is allocated an amount of tax similar to that which would be paid if it filed a separate income tax return. In accordance with IRS regulations, each company is jointly and severally liable for the federal tax liability. Current and Deferred Income Taxes Details of income tax provisions are as follows:
Southern Company's and Southern Power's ITCs and PTCs generated in the current tax year and carried forward from prior tax years that cannot be utilized in the current tax year are reclassified from current to deferred taxes in federal income tax expense in the tables above. Southern Power's ITCs and PTCs reclassified in this manner include $5 million for 2023, $17 million for 2022, and $6 million for 2021. Southern Power received $332 million, $49 million, and $289 million of cash related to federal ITCs under renewable energy initiatives in 2023, 2022, and 2021, respectively. See "Deferred Tax Assets and Liabilities" herein for additional information. In accordance with regulatory requirements, deferred federal ITCs for the traditional electric operating companies are amortized over the average life of the related property, with such amortization normally applied as a credit to reduce depreciation and amortization in the statements of income. Southern Power's and the natural gas distribution utilities' deferred federal ITCs, as well as certain state ITCs for Nicor Gas, are amortized to income tax expense over the life of the respective asset. ITCs amortized in 2023, 2022, and 2021 were immaterial for the traditional electric operating companies and Southern Company Gas and were as follows for Southern Company and Southern Power:
When Southern Power recognizes tax credits, the tax basis of the asset is reduced by 50% of the ITCs received, resulting in a net deferred tax asset. Southern Power has elected to recognize the tax benefit of this basis difference as a reduction to income tax expense in the year in which the plant reaches commercial operation. State ITCs and other state credits, which are recognized in the period in which the credits are generated, reduced Georgia Power's income tax expense by $49 million in 2023, $53 million in 2022, and $66 million in 2021. Southern Power's federal and state PTCs, which are recognized in the period in which the credits are generated, reduced Southern Power's income tax expense by $26 million in 2023, $27 million in 2022, and $16 million in 2021. During the fourth quarter 2023, Southern Power executed an agreement to transfer certain PTCs generated in 2023 and received cash of $12 million. The discount recognized was booked through income tax expense and was immaterial. Pursuant to the Global Amendments to the Vogtle Joint Ownership Agreements (as defined in Note 2 under "Georgia Power – Nuclear Construction – Joint Owner Contracts"), Georgia Power paid $39 million to the other Vogtle Owners for advanced nuclear PTCs for Plant Vogtle Unit 3. The gain recognized in 2023 was booked through income tax benefit and was immaterial. Effective Tax Rate Southern Company's effective tax rate is typically lower than the statutory rate due to employee stock plans' dividend deduction, non-taxable AFUDC equity at the traditional electric operating companies, flowback of excess deferred income taxes at the regulated utilities, and federal income tax benefits from ITCs and PTCs primarily at Southern Power. In July 2021, Southern Company Gas affiliates completed the sale of Sequent. As a result of the sale, changes in state apportionment rates resulted in $85 million of additional net state tax expense. See Note 15 under "Southern Company Gas" for additional information. A reconciliation of the federal statutory income tax rate to the effective income tax rate is as follows:
Deferred Tax Assets and Liabilities The tax effects of temporary differences between the carrying amounts of assets and liabilities in the financial statements of the Registrants and their respective tax bases, which give rise to deferred tax assets and liabilities, are as follows:
The traditional electric operating companies and the natural gas distribution utilities have tax-related regulatory assets (deferred income tax charges) and regulatory liabilities (deferred income tax credits). The regulatory assets are primarily attributable to tax benefits flowed through to customers in prior years, deferred taxes previously recognized at rates lower than the current enacted tax law, and taxes applicable to capitalized interest. The regulatory liabilities are primarily attributable to deferred taxes previously recognized at rates higher than the current enacted tax law and to unamortized ITCs. See Note 2 for each Registrant's related balances at December 31, 2023 and 2022. Tax Credit Carryforwards Federal ITC/PTC carryforwards at December 31, 2023 were as follows:
The estimated tax credit utilization reflects the various transactions described in Note 15 and could be impacted by numerous factors, including the acquisition of additional renewable projects, changes in taxable income projections, transfer of eligible credits, potential income tax rate changes, and the ultimate implementation of the natural gas safe harbor method for repairs. In the third quarter 2023, Georgia Power started generating advanced nuclear PTCs for Plant Vogtle Unit 3 beginning on the in-service date of July 31, 2023. In addition, pursuant to the Global Amendments to the Vogtle Joint Ownership Agreements (as defined in Note 2 under "Georgia Power – Nuclear Construction – Joint Owner Contracts"), Georgia Power is purchasing advanced nuclear PTCs for Plant Vogtle Unit 3 from the other Vogtle Owners. See Note 2 under "Georgia Power – Nuclear Construction" for additional information on Plant Vogtle Units 3 and 4. At December 31, 2023, Georgia Power also had approximately $452 million in net state investment and other net state tax credit carryforwards for the State of Georgia that will expire between tax years 2023 and 2032 and are not expected to be fully utilized. Georgia Power has a net state valuation allowance of $60 million associated with these carryforwards. The ultimate outcome of these matters cannot be determined at this time. Net Operating Loss Carryforwards At December 31, 2023, the net state income tax benefit of state and local NOL carryforwards for Southern Company's subsidiaries were as follows:
*Represents other non-registrant Southern Company subsidiaries. Alabama Power, Georgia Power, and Southern Company Gas did not have material state or local NOL carryforwards at December 31, 2023. State NOLs for Mississippi, Oklahoma, and Florida are not expected to be fully utilized prior to expiration. At December 31, 2023, Mississippi Power had a net state valuation allowance of $32 million for the Mississippi NOL, Southern Power had net state valuation allowances of $11 million for the Oklahoma NOL and $10 million for the Florida NOL, and Southern Company had a net valuation allowance of $25 million for the New York and New York City NOLs. The ultimate outcome of these matters cannot be determined at this time. Unrecognized Tax Benefits Changes in unrecognized tax benefits for the periods presented were as follows:
The unrecognized tax positions increase from prior periods for 2022 is primarily related to the amendment of certain 2018 state tax filing positions related to Southern Company Gas dispositions. If accepted by the states, these positions would decrease Southern Company's and Southern Company Gas' annual effective tax rates. The ultimate outcome of these unrecognized tax benefits is dependent on acceptance by each state and is not expected to be resolved within the next 12 months. The unrecognized tax positions increase from prior periods for 2023 are primarily related to the amendment of certain 2019 through 2021 state tax filing positions related to tax credit utilization, a portion of which decreased in the fourth quarter 2023 due to a statute of limitations expiration. If effective settlement of the positions is favorable, these positions would decrease Southern Company's and Georgia Power's annual effective tax rates. The ultimate outcome of this unrecognized tax benefit, of which a portion is expected to be resolved within the next 12 months, is dependent on acceptance by the state or expiration of related statute of limitations. The unrecognized tax positions reductions due to statute of limitations expiration for 2023 primarily relates to a 2019 state tax filing position to exclude certain gains from 2019 dispositions from taxation in a certain unitary state. This tax position and related interest was recognized in the fourth quarter 2023 and decreased Southern Company's annual effective tax rate. All of the Registrants classify interest on tax uncertainties as interest expense. Accrued interest for all tax positions was immaterial for all years presented. None of the Registrants accrued any penalties on uncertain tax positions. The IRS has finalized its audits of Southern Company's consolidated federal income tax returns through 2022. Southern Company is a participant in the Compliance Assurance Process of the IRS. The IRS has selected six Southern Power partnership returns for exam for the 2020 and 2021 tax years. The ultimate outcome of this matter cannot be determined at this time. The audits for the Registrants' state income tax returns have either been concluded, or the statute of limitations has expired, for years prior to 2015. 11. RETIREMENT BENEFITS The Southern Company system has a qualified defined benefit, trusteed pension plan covering substantially all employees, with the exception of PowerSecure employees. The qualified pension plan is funded in accordance with requirements of the Employee Retirement Income Security Act of 1974, as amended (ERISA). No contributions to the qualified pension plan were made for the year ended December 31, 2023 and no mandatory contributions to the qualified pension plan are anticipated for the year ending December 31, 2024. The Southern Company system also provides certain non-qualified defined benefits for a select group of management and highly compensated employees, which are funded on a cash basis. In addition, the Southern Company system provides certain medical care and life insurance benefits for retired employees through other postretirement benefit plans. The traditional electric operating companies fund other postretirement trusts to the extent required by their respective regulatory commissions. Southern Company Gas has a separate unfunded supplemental retirement health care plan that provides medical care and life insurance benefits to employees of discontinued businesses. For the year ending December 31, 2024, no contributions to any other postretirement trusts are expected. Actuarial Assumptions The weighted average rates assumed in the actuarial calculations used to determine both the net periodic costs for the pension and other postretirement benefit plans for the following year and the benefit obligations as of the measurement date are presented below.
The Registrants estimate the expected rate of return on pension plan and other postretirement benefit plan assets using a financial model to project the expected return on each current investment portfolio. The analysis projects an expected rate of return on each of the different asset classes in order to arrive at the expected return on the entire portfolio relying on each trust's target asset allocation and reasonable capital market assumptions. The financial model is based on four key inputs: anticipated returns by asset class (based in part on historical returns), each trust's target asset allocation, an anticipated inflation rate, and the projected impact of a periodic rebalancing of each trust's portfolio. The Registrants set the expected rate of return assumption using an arithmetic mean which represents the expected simple average return to be earned by the pension plan assets over any one year. The Registrants believe the use of the arithmetic mean is more compatible with the expected rate of return's function of estimating a single year's investment return. An additional assumption used in measuring the accumulated other postretirement benefit obligations (APBO) was a weighted average medical care cost trend rate. The weighted average medical care cost trend rates used in measuring the APBO for the Registrants at December 31, 2023 were as follows:
Pension Plans The total accumulated benefit obligation for the pension plans at December 31, 2023 and 2022 was as follows:
An actuarial loss of $0.5 billion and an actuarial gain of $3.9 billion were recorded for the annual remeasurement of the Southern Company system pension plans at December 31, 2023 and 2022, respectively, primarily due to a decrease of 18 basis points and an increase of 216 basis points, respectively, in the overall discount rate used to calculate the benefit obligation as a result of higher market interest rates. Changes in the projected benefit obligations and the fair value of plan assets during the plan years ended December 31, 2023 and 2022 were as follows:
The projected benefit obligations for the qualified and non-qualified pension plans at December 31, 2023 are shown in the following table. All pension plan assets are related to the qualified pension plan.
Amounts recognized in the balance sheets at December 31, 2023 and 2022 related to the Registrants' pension plans consist of the following:
(a)Included in prepaid pension and other postretirement benefit costs on Alabama Power's balance sheet and other deferred charges and assets on Southern Power's consolidated balance sheet. (b)Amounts for Southern Company exclude regulatory assets of $173 million and $190 million at December 31, 2023 and 2022, respectively, associated with unamortized amounts in Southern Company Gas' pension plans prior to its acquisition by Southern Company. (c)Included in other deferred credits and liabilities on Southern Power's consolidated balance sheets. Presented below are the amounts included in regulatory assets at December 31, 2023 and 2022 related to the portion of the defined benefit pension plan attributable to Southern Company, the traditional electric operating companies, and Southern Company Gas that had not yet been recognized in net periodic pension cost.
*Amounts for Southern Company exclude regulatory assets of $173 million and $190 million at December 31, 2023 and 2022, respectively, associated with unamortized amounts in Southern Company Gas' pension plans prior to its acquisition by Southern Company. The changes in the balance of regulatory assets related to the portion of the defined benefit pension plan attributable to Southern Company, the traditional electric operating companies, and Southern Company Gas for the years ended December 31, 2023 and 2022 are presented in the following table:
*Amounts for Southern Company exclude regulatory assets of $173 million and $190 million at December 31, 2023 and 2022, respectively, associated with unamortized amounts in Southern Company Gas' pension plans prior to its acquisition by Southern Company. Presented below are the amounts included in AOCI at December 31, 2023 and 2022 related to the portion of the defined benefit pension plan attributable to Southern Company, Southern Power, and Southern Company Gas that had not yet been recognized in net periodic pension cost.
The components of OCI related to the portion of the defined benefit pension plan attributable to Southern Company, Southern Power, and Southern Company Gas for the years ended December 31, 2023 and 2022 are presented in the following table:
Components of net periodic pension cost for the Registrants were as follows:
The service cost component of net periodic pension cost is included in operations and maintenance expenses and all other components of net periodic pension cost are included in other income (expense), net in the Registrants' statements of income. Net periodic pension cost is the sum of service cost, interest cost, and other costs netted against the expected return on plan assets. The expected return on plan assets is determined by multiplying the expected rate of return on plan assets and the market-related value of plan assets. In determining the market-related value of plan assets, the Registrants have elected to amortize changes in the market value of return-seeking plan assets over five years and to recognize the changes in the market value of liability-hedging plan assets immediately. Given the significant concentration in return-seeking plan assets, the accounting value of plan assets that is used to calculate the expected return on plan assets differs from the current fair value of the plan assets. Future benefit payments reflect expected future service and are estimated based on assumptions used to measure the projected benefit obligation for the pension plans. At December 31, 2023, estimated benefit payments were as follows:
Other Postretirement Benefits Changes in the APBO and the fair value of the Registrants' plan assets during the plan years ended December 31, 2023 and 2022 were as follows:
Amounts recognized in the balance sheets at December 31, 2023 and 2022 related to the Registrants' other postretirement benefit plans consist of the following:
(a)Included in prepaid pension and other postretirement benefit costs on Alabama Power's balance sheet. (b)Amounts for Southern Company exclude regulatory assets of $24 million and $32 million at December 31, 2023 and 2022, respectively, associated with unamortized amounts in Southern Company Gas' other postretirement benefit plans prior to its acquisition by Southern Company. (c)Included in other deferred credits and liabilities on Southern Power's consolidated balance sheets. Presented below are the amounts included in net regulatory assets (liabilities) at December 31, 2023 and 2022 related to the other postretirement benefit plans of Southern Company, the traditional electric operating companies, and Southern Company Gas that had not yet been recognized in net periodic other postretirement benefit cost.
*Amounts for Southern Company exclude regulatory assets of $24 million and $32 million at December 31, 2023 and 2022, respectively, associated with unamortized amounts in Southern Company Gas' other postretirement benefit plans prior to its acquisition by Southern Company. The changes in the balance of net regulatory assets (liabilities) related to the other postretirement benefit plans for the plan years ended December 31, 2023 and 2022 are presented in the following table:
*Amounts for Southern Company exclude regulatory assets of $24 million and $32 million at December 31, 2023 and 2022, respectively, associated with unamortized amounts in Southern Company Gas' other postretirement benefit plans prior to its acquisition by Southern Company. Presented below are the amounts included in AOCI at December 31, 2023 and 2022 related to the other postretirement benefit plans of Southern Company, Southern Power, and Southern Company Gas that had not yet been recognized in net periodic other postretirement benefit cost.
The components of OCI related to the other postretirement benefit plans for the plan years ended December 31, 2023 and 2022 are presented in the following table:
Components of the other postretirement benefit plans' net periodic cost for the Registrants were as follows:
The service cost component of net periodic postretirement benefit cost is included in operations and maintenance expenses and all other components of net periodic postretirement benefit cost are included in other income (expense), net in the Registrants' statements of income. The Registrants' future benefit payments, including prescription drug benefits, are provided in the table below. These amounts reflect expected future service and are estimated based on assumptions used to measure the APBO for the other postretirement benefit plans.
Benefit Plan Assets Pension plan and other postretirement benefit plan assets are managed and invested in accordance with all applicable requirements, including ERISA and the Internal Revenue Code. The Registrants' investment policies for both the pension plans and the other postretirement benefit plans cover a diversified mix of assets as described below. Derivative instruments may be used to gain efficient exposure to the various asset classes and as hedging tools. Additionally, the Registrants minimize the risk of large losses primarily through diversification but also monitor and manage other aspects of risk. The investment strategy for plan assets related to the Southern Company system's qualified pension plan is to be broadly diversified across major asset classes. The asset allocation is established after consideration of various factors that affect the assets and liabilities of the pension plan including, but not limited to, historical and expected returns and interest rates, volatility, correlations of asset classes, the current level of assets and liabilities, and the assumed growth in assets and liabilities. Because a significant portion of the liability of the pension plan is long-term in nature, the assets are invested consistent with long-term investment expectations for return and risk. To manage the actual asset class exposures relative to the target asset allocation, the Southern Company system employs a formal rebalancing program. As additional risk management, external investment managers and service providers are subject to written guidelines to ensure appropriate and prudent investment practices. Management believes the portfolio is well-diversified with no significant concentrations of risk. Investment Strategies and Benefit Plan Asset Fair Values A description of the major asset classes that the pension and other postretirement benefit plans are comprised of, along with the valuation methods used for fair value measurement, is provided below:
For purposes of determining the fair value of the pension plan and other postretirement benefit plan assets and the appropriate level designation, management relies on information provided by the plan's trustee. This information is reviewed and evaluated by management with changes made to the trustee information as appropriate. The fair values presented herein exclude cash, receivables related to investment income and pending investment sales, and payables related to pending investment purchases. The fair values, and actual allocations relative to the target allocations, of the Southern Company system's pension plans at December 31, 2023 and 2022 are presented below.
The fair values, and actual allocations relative to the target allocations, of the applicable Registrants' other postretirement benefit plan assets at December 31, 2023 and 2022 are presented below.
Employee Savings Plan Southern Company and its subsidiaries also sponsor 401(k) defined contribution plans covering substantially all employees and provide matching contributions up to specified percentages of an employee's eligible pay. Total matching contributions made to the plans for 2023, 2022, and 2021 were as follows:
12. STOCK COMPENSATION Stock-based compensation primarily in the form of Southern Company performance share units (PSU) and restricted stock units (RSU) may be granted through the Equity and Incentive Compensation Plan to Southern Company system employees ranging from line management to executives. At December 31, 2023, the number of current and former employees participating in stock-based compensation programs for the Registrants was as follows:
The majority of PSUs and RSUs awarded contain terms where employees become immediately vested in PSUs and RSUs upon retirement. As a result, compensation expense for employees that are retirement eligible at the grant date is recognized immediately, while compensation expense for employees that become retirement eligible during the vesting period is recognized over the period from grant date to the date of retirement eligibility. In addition, the Registrants recognize forfeitures as they occur. All unvested PSUs and RSUs vest immediately upon a change in control where Southern Company is not the surviving corporation. Performance Share Units PSUs granted to employees vest at the end of a three-year performance period. Shares of Southern Company common stock are delivered to employees at the end of the performance period with the number of shares issued ranging from 0% to 200% of the target number of PSUs granted, based on achievement of the performance goals established by the Compensation Committee of the Southern Company Board of Directors. Southern Company has issued two types of PSUs, each with a unique performance goal. These types of PSUs include total shareholder return (TSR) awards based on the TSR for Southern Company common stock during the three-year performance period as compared to a group of industry peers and ROE awards based on Southern Company's equity-weighted return over the performance period. The fair value of TSR awards is determined as of the grant date using a Monte Carlo simulation model. In determining the fair value of the TSR awards issued to employees, the expected volatility is based on the historical volatility of Southern Company's stock over a period equal to the performance period. The risk-free rate is based on the U.S. Treasury yield curve in effect at the time of grant that covers the performance period of the awards. The following table shows the assumptions used in the pricing model and the weighted average grant-date fair value of TSR awards granted:
The Registrants recognize TSR award compensation expense on a straight-line basis over the three-year performance period without remeasurement. The fair values of ROE awards are based on the closing stock price of Southern Company common stock on the date of the grant. The weighted average grant-date fair value of the ROE awards granted during 2023, 2022, and 2021 was $68.93, $66.87, and $59.49, respectively. Compensation expense for ROE awards is generally recognized ratably over the three-year performance period adjusted for expected changes in ROE performance. Total compensation cost recognized for vested ROE awards reflects final performance metrics. Southern Company had 2.4 million unvested PSUs outstanding at December 31, 2022. In February 2023, the PSUs that vested for the three-year performance period ended December 31, 2022 were converted into 1.8 million shares outstanding at a share price of $67.13. During 2023, Southern Company granted 1.3 million PSUs and 1.3 million PSUs were vested or forfeited, resulting in 2.4 million unvested PSUs outstanding at December 31, 2023. In February 2024, the PSUs that vested for the three-year performance period ended December 31, 2023 were converted into 2.3 million shares outstanding at a weighted average share price of $66.95. Total PSU compensation cost, and the related tax benefit recognized in income, for the years ended December 31, 2023, 2022, and 2021 are as follows:
Total PSU compensation cost and the related tax benefit recognized in income were immaterial for all periods presented for all other Registrants. The compensation cost related to the grant of Southern Company PSUs to the employees of each Subsidiary Registrant is recognized in each Subsidiary Registrant's financial statements with a corresponding credit to equity representing a capital contribution from Southern Company. At December 31, 2023, Southern Company's total unrecognized compensation cost related to PSUs was $32 million and is expected to be recognized over a weighted-average period of approximately 19 months. The total unrecognized compensation cost related to PSUs at December 31, 2023 was immaterial for all other Registrants. Restricted Stock Units The fair value of RSUs is based on the closing stock price of Southern Company common stock on the date of the grant. The weighted average grant-date fair values of RSUs granted during 2023, 2022, and 2021 were $68.95, $67.20, and $59.56, respectively. For most RSU awards, one-third of the RSUs vest each year throughout a three-year service period and compensation cost for RSUs is generally recognized over the corresponding one-, two-, or three-year vesting period. Shares of Southern Company common stock are delivered to employees at the end of each vesting period. Southern Company had 0.9 million RSUs outstanding at December 31, 2022. During 2023, Southern Company granted 0.5 million RSUs and 0.5 million RSUs were vested or forfeited, resulting in 0.9 million unvested RSUs outstanding at December 31, 2023, including RSUs related to employee retention agreements. For the years ended December 31, 2023, 2022, and 2021, Southern Company's total compensation cost for RSUs recognized in income was $30 million, $26 million, and $32 million, respectively. The related tax benefit also recognized in income was $8 million, $7 million, and $8 million for the years ended December 31, 2023, 2022, and 2021, respectively. Total unrecognized compensation cost related to RSUs at December 31, 2023, which is being recognized over a weighted-average period of approximately 17 months, is immaterial for Southern Company. Total RSUs outstanding and total compensation cost and related tax benefit for the RSUs recognized in income for the years ended December 31, 2023, 2022, and 2021, as well as the total unrecognized compensation cost at December 31, 2023, were immaterial for all other Registrants. The compensation cost related to the grant of Southern Company RSUs to the employees of each Subsidiary Registrant is recognized in such Subsidiary Registrant's financial statements with a corresponding credit to equity representing a capital contribution from Southern Company. Stock Options In 2015, Southern Company discontinued granting stock options. As of December 31, 2017, all stock option awards were vested and compensation cost fully recognized. Stock options expire no later than 10 years after the grant date and the latest possible exercise will occur by November 2024. At December 31, 2023, the weighted average remaining contractual term for the options outstanding and exercisable was approximately 2 months. Southern Company's activity in the stock option program for 2023 is summarized below:
Southern Company's cash receipts from issuances related to stock options exercised under the share-based payment arrangements for the years ended December 31, 2023, 2022, and 2021 were $28 million, $75 million, and $66 million, respectively. At December 31, 2023, the aggregate intrinsic value for options outstanding and exercisable was immaterial for all Registrants. Total intrinsic value of options exercised, and the related tax benefit, for the years ended December 31, 2023, 2022, and 2021 are presented below for Southern Company and were immaterial for all other Registrants:
13. FAIR VALUE MEASUREMENTS Fair value measurements are based on inputs of observable and unobservable market data that a market participant would use in pricing the asset or liability. The use of observable inputs is maximized where available and the use of unobservable inputs is minimized for fair value measurement and reflects a three-tier fair value hierarchy that prioritizes inputs to valuation techniques used for fair value measurement. *Level 1 consists of observable market data in an active market for identical assets or liabilities. *Level 2 consists of observable market data, other than that included in Level 1, that is either directly or indirectly observable. *Level 3 consists of unobservable market data. The input may reflect the assumptions of each Registrant of what a market participant would use in pricing an asset or liability. If there is little available market data, then each Registrant's own assumptions are the best available information. In the case of multiple inputs being used in a fair value measurement, the lowest level input that is significant to the fair value measurement represents the level in the fair value hierarchy in which the fair value measurement is reported. Net asset value as a practical expedient is the classification used for assets that do not have readily determined fair values. Fund managers value the assets using various inputs and techniques depending on the nature of the underlying investments. At December 31, 2023, assets and liabilities measured at fair value on a recurring basis during the period, together with their associated level of the fair value hierarchy, were as follows:
(a)Excludes cash collateral of $62 million. (b)Excludes receivables related to investment income, pending investment sales, payables related to pending investment purchases, and currencies. See Note 6 under "Nuclear Decommissioning" for additional information. At December 31, 2022, assets and liabilities measured at fair value on a recurring basis during the period, together with their associated level of the fair value hierarchy, were as follows:
(a)Excludes cash collateral of $41 million. (b)Excludes receivables related to investment income, pending investment sales, payables related to pending investment purchases, and currencies. See Note 6 under "Nuclear Decommissioning" for additional information. (c)Includes investment securities pledged to creditors and collateral received and excludes payables related to the securities lending program. See Note 6 under "Nuclear Decommissioning" for additional information. Valuation Methodologies The energy-related derivatives primarily consist of exchange-traded and over-the-counter financial products for natural gas and physical power products, including, from time to time, basis swaps. These are standard products used within the energy industry and are valued using the market approach. The inputs used are mainly from observable market sources, such as forward natural gas prices, power prices, implied volatility, and overnight index swap interest rates. Interest rate derivatives are also standard over-the-counter products that are valued using observable market data and assumptions commonly used by market participants. The fair value of interest rate derivatives reflects the net present value of expected payments and receipts under the swap agreement based on the market's expectation of future interest rates. Additional inputs to the net present value calculation may include the contract terms, counterparty credit risk, and occasionally, implied volatility of interest rate options. The fair value of cross-currency swaps reflects the net present value of expected payments and receipts under the swap agreement based on the market's expectation of future foreign currency exchange rates. Additional inputs to the net present value calculation may include the contract terms, counterparty credit risk, and discount rates. The interest rate derivatives and cross-currency swaps are categorized as Level 2 under Fair Value Measurements as these inputs are based on observable data and valuations of similar instruments. See Note 14 for additional information on how these derivatives are used. For fair value measurements of the investments within the nuclear decommissioning trusts and the non-qualified deferred compensation trusts, external pricing vendors are designated for each asset class with each security specifically assigned a primary pricing source. For investments held within commingled funds, fair value is determined at the end of each business day through the net asset value, which is established by obtaining the underlying securities' individual prices from the primary pricing source. A market price secured from the primary source vendor is then evaluated by management in its valuation of the assets within the trusts. As a general approach, fixed income market pricing vendors gather market data (including indices and market research reports) and integrate relative credit information, observed market movements, and sector news into proprietary pricing models, pricing systems, and mathematical tools. Dealer quotes and other market information, including live trading levels and pricing analysts' judgments, are also obtained when available. The NRC requires licensees of commissioned nuclear power reactors to establish a plan for providing reasonable assurance of funds for future decommissioning. See Note 6 under "Nuclear Decommissioning" for additional information. Southern Power has contingent payment obligations related to two of its acquisitions whereby it is primarily obligated to make generation-based payments to the seller, commencing at the commercial operation of each facility and continuing through 2026 and 2035, respectively. The obligations are primarily categorized as Level 3 under Fair Value Measurements as the fair value is determined using significant unobservable inputs for the forecasted facility's generation in MW-hours, as well as other inputs such as a fixed dollar amount per MW-hour, and a discount rate. The fair value of contingent consideration reflects the net present value of expected payments and any periodic change arising from forecasted generation is expected to be immaterial. Southern Power also has payment obligations through 2040 whereby it must reimburse the transmission owners for interconnection facilities and network upgrades constructed to support connection of a Southern Power generating facility to the transmission system. The obligations are categorized as Level 2 under Fair Value Measurements as the fair value is determined using observable inputs for the contracted amounts and reimbursement period, as well as a discount rate. The fair value of the obligations reflects the net present value of expected payments. "Other investments" primarily includes investments traded in the open market that have maturities greater than 90 days, which are categorized as Level 2 under Fair Value Measurements and are comprised of corporate bonds, bank certificates of deposit, treasury bonds, and/or agency bonds. The fair value measurements of private market investments held in Alabama Power's nuclear decommissioning trusts that are calculated at net asset value per share (or its equivalent) as a practical expedient totaled $178 million and $161 million at December 31, 2023 and 2022, respectively. Unfunded commitments related to the private market investments totaled $87 million and $78 million at December 31, 2023 and 2022, respectively. Private market investments include high-quality private equity funds across several market sectors, funds that invest in real estate assets, and a private credit fund. Private market funds do not have redemption rights. Distributions from these funds will be received as the underlying investments in the funds are liquidated. At December 31, 2023 and 2022, other financial instruments for which the carrying amount did not equal fair value were as follows:
*The carrying amount of Southern Company Gas' long-term debt includes fair value adjustments from the effective date of the 2016 merger with Southern Company. Southern Company Gas amortizes the fair value adjustments over the remaining lives of the respective bonds, the latest being through 2043. The fair values are determined using Level 2 measurements and are based on quoted market prices for the same or similar issues or on the current rates available to the Registrants. 14. DERIVATIVES The Registrants are exposed to market risks, including commodity price risk, interest rate risk, weather risk, and occasionally foreign currency exchange rate risk. To manage the volatility attributable to these exposures, each company nets its exposures, where possible, to take advantage of natural offsets and enters into various derivative transactions for the remaining exposures pursuant to each company's policies in areas such as counterparty exposure and risk management practices. For the traditional electric operating companies, Southern Power, and Southern Company Gas' other businesses, each company's policy is that derivatives are to be used primarily for hedging purposes and mandates strict adherence to all applicable risk management policies. Derivative positions are monitored using techniques including, but not limited to, market valuation, value at risk, stress testing, and sensitivity analysis. Derivative instruments are recognized at fair value in the balance sheets as either assets or liabilities and are presented on a net basis. See Note 13 for additional fair value information. In the statements of cash flows, any cash impacts of settled energy-related and interest rate derivatives are recorded as operating activities. Any cash impacts of settled foreign currency derivatives are classified as operating or financing activities to correspond with the classification of the hedged interest or principal, respectively. See Note 1 under "Financial Instruments" for additional information. See Note 15 under "Southern Company Gas" for additional information regarding the sale of Sequent. Energy-Related Derivatives The Subsidiary Registrants enter into energy-related derivatives to hedge exposures to electricity, natural gas, and other fuel price changes. However, due to cost-based rate regulations and other various cost recovery mechanisms, the traditional electric operating companies and the natural gas distribution utilities have limited exposure to market volatility in energy-related commodity prices. Each of the traditional electric operating companies and certain of the natural gas distribution utilities of Southern Company Gas manage fuel-hedging programs, implemented per the guidelines of their respective state PSCs or other applicable state regulatory agencies, through the use of financial derivative contracts, which are expected to continue to mitigate price volatility. The traditional electric operating companies (with respect to wholesale generating capacity) and Southern Power have limited exposure to market volatility in energy-related commodity prices because their long-term sales contracts shift substantially all fuel cost responsibility to the purchaser. However, the traditional electric operating companies and Southern Power may be exposed to market volatility in energy-related commodity prices to the extent any uncontracted capacity is used to sell electricity. Southern Company Gas retains exposure to price changes that can, in a volatile energy market, be material and can adversely affect its results of operations. Southern Company Gas also enters into weather derivative contracts as economic hedges in the event of warmer-than-normal weather. Exchange-traded options are carried at fair value, with changes reflected in operating revenues. Non-exchange-traded options are accounted for using the intrinsic value method. Changes in the intrinsic value for non-exchange-traded contracts are reflected in operating revenues. Energy-related derivative contracts are accounted for under one of three methods: *Regulatory Hedges – Energy-related derivative contracts designated as regulatory hedges relate primarily to the traditional electric operating companies' and the natural gas distribution utilities' fuel-hedging programs, where gains and losses are initially recorded as regulatory liabilities and assets, respectively, and then are included in fuel expense as the underlying fuel is used in operations and ultimately recovered through an approved cost recovery mechanism. *Cash Flow Hedges – Gains and losses on energy-related derivatives designated as cash flow hedges (which are mainly used to hedge anticipated purchases and sales) are initially deferred in AOCI before being recognized in the statements of income in the same period and in the same income statement line item as the earnings effect of the hedged transactions. *Not Designated – Gains and losses on energy-related derivative contracts that are not designated or fail to qualify as hedges are recognized in the statements of income as incurred. Some energy-related derivative contracts require physical delivery as opposed to financial settlement, and this type of derivative is both common and prevalent within the electric and natural gas industries. When an energy-related derivative contract is settled physically, any cumulative unrealized gain or loss is reversed and the contract price is recognized in the respective line item representing the actual price of the underlying goods being delivered. At December 31, 2023, the net volume of energy-related derivative contracts for natural gas positions, together with the longest hedge date over which the respective entity is hedging its exposure to the variability in future cash flows for forecasted transactions and the longest non-hedge date for derivatives not designated as hedges, were as follows:
*Southern Company Gas' derivative instruments include both long and short natural gas positions. A long position is a contract to purchase natural gas and a short position is a contract to sell natural gas. Southern Company Gas' volume represents the net of long natural gas positions of 112 million mmBtu and short natural gas positions of 10 million mmBtu at December 31, 2023, which is also included in Southern Company's total volume. In addition to the volumes discussed above, the traditional electric operating companies and Southern Power enter into physical natural gas supply contracts that provide the option to sell back excess natural gas due to operational constraints. The maximum expected volume of natural gas subject to such a feature is 12 million mmBtu for Southern Company, which includes 3 million mmBtu for Alabama Power, 4 million mmBtu for Georgia Power, 2 million mmBtu for Mississippi Power, and 3 million mmBtu for Southern Power. For cash flow hedges of energy-related derivatives, the estimated pre-tax gains (losses) expected to be reclassified from AOCI to earnings for the year ending December 31, 2024 are $(37) million for Southern Company, $(4) million for Southern Power, and $(33) million for Southern Company Gas. Interest Rate Derivatives Southern Company and certain subsidiaries may enter into interest rate derivatives to hedge exposure to changes in interest rates. Derivatives related to existing variable rate securities or forecasted transactions are accounted for as cash flow hedges where the derivatives' fair value gains or losses are recorded in OCI and are reclassified into earnings at the same time and presented on the same income statement line item as the earnings effect of the hedged transactions. Derivatives related to existing fixed rate securities are accounted for as fair value hedges, where the derivatives' fair value gains or losses and hedged items' fair value gains or losses are both recorded directly to earnings on the same income statement line item. Fair value gains or losses on derivatives that are not designated or fail to qualify as hedges are recognized in the statements of income as incurred. At December 31, 2023, the following interest rate derivatives were outstanding:
For cash flow hedges of interest rate derivatives, the estimated pre-tax losses expected to be reclassified from AOCI to interest expense for the year ending December 31, 2024 are $19 million for Southern Company and immaterial for the traditional electric operating companies and Southern Company Gas. Deferred gains and losses related to interest rate derivatives are expected to be amortized into earnings through 2054 for Southern Company, Georgia Power, and Mississippi Power, 2052 for Alabama Power, and 2046 for Southern Company Gas. Foreign Currency Derivatives Southern Company and certain subsidiaries, including Southern Power, may enter into foreign currency derivatives to hedge exposure to changes in foreign currency exchange rates, such as that arising from the issuance of debt denominated in a currency other than U.S. dollars. Derivatives related to forecasted transactions are accounted for as cash flow hedges where the derivatives' fair value gains or losses are recorded in OCI and are reclassified into earnings at the same time and on the same income statement line as the earnings effect of the hedged transactions, including foreign currency gains or losses arising from changes in the U.S. currency exchange rates. Derivatives related to existing fixed rate securities are accounted for as fair value hedges, where the derivatives' fair value gains or losses and hedged items' fair value gains or losses are both recorded directly to earnings on the same income statement line item, including foreign currency gains or losses arising from changes in the U.S. currency exchange rates. Southern Company has elected to exclude the cross-currency basis spread from the assessment of effectiveness in the fair value hedges of its foreign currency risk and record any difference between the change in the fair value of the excluded components and the amounts recognized in earnings as a component of OCI. At December 31, 2023, the following foreign currency derivatives were outstanding:
For cash flow hedges of foreign currency derivatives, the estimated pre-tax losses expected to be reclassified from AOCI to earnings for the year ending December 31, 2024 are $11 million for Southern Power. Derivative Financial Statement Presentation and Amounts The Registrants enter into derivative contracts that may contain certain provisions that permit intra-contract netting of derivative receivables and payables for routine billing and offsets related to events of default and settlements. Southern Company and certain subsidiaries also utilize master netting agreements to mitigate exposure to counterparty credit risk. These agreements may contain provisions that permit netting across product lines and against cash collateral. The fair value amounts of derivative assets and liabilities on the balance sheets are presented net to the extent that there are netting arrangements or similar agreements with the counterparties. The fair value of energy-related derivatives, interest rate derivatives, and foreign currency derivatives was reflected in the balance sheets as follows:
(a)Gross amounts offset includes cash collateral held on deposit in broker margin accounts of $62 million and $41 million at December 31, 2023 and 2022, respectively. (b)Net amounts of derivative instruments outstanding exclude immaterial premium and intrinsic value associated with weather derivatives for all periods presented. (c)Energy-related derivatives not designated as hedging instruments were immaterial at December 31, 2022. There were no such instruments at December 31, 2023. At December 31, 2023 and 2022, the pre-tax effects of unrealized derivative gains (losses) arising from energy-related derivative instruments designated as regulatory hedging instruments and deferred were as follows:
For the years ended December 31, 2023, 2022, and 2021, the pre-tax effects of cash flow and fair value hedge accounting on AOCI for the applicable Registrants were as follows:
*Represents amounts excluded from the assessment of effectiveness for which the difference between changes in fair value and periodic amortization is recorded in OCI. The pre-tax effects of interest rate derivatives designated as cash flow hedging instruments on AOCI were immaterial for Alabama Power for all years presented and immaterial for Mississippi Power in 2023. The pre-tax effects of cash flow and fair value hedge accounting on income for the years ended December 31, 2023, 2022, and 2021 were as follows:
(a)Reclassified from AOCI into earnings. (b)For fair value hedges, changes in the fair value of the derivative contracts are generally equal to changes in the fair value of the underlying debt and have no material impact on income. (c)The reclassification from AOCI into other income (expense), net completely offsets currency gains and losses arising from changes in the U.S. currency exchange rates used to record the euro-denominated notes. The pre-tax effects of cash flow hedge accounting on income for interest rate derivatives were immaterial for the traditional electric operating companies for all years presented. At December 31, 2023 and 2022, the following amounts were recorded on the balance sheets related to cumulative basis adjustments for fair value hedges:
The pre-tax effects of energy-related derivatives not designated as hedging instruments on the statements of income of Southern Company and Southern Company Gas for the years ended December 31, 2023, 2022, and 2021 were as follows:
(*) Excludes the impact of weather derivatives recorded in natural gas revenues of $15 million and $(7) million for 2023 and 2022, respectively, as they are accounted for based on intrinsic value rather than fair value. There was no weather derivatives impact for 2021. The pre-tax effects of energy-related derivatives not designated as hedging instruments were immaterial for all other Registrants for all years presented. Contingent Features The Registrants do not have any credit arrangements that would require material changes in payment schedules or terminations as a result of a credit rating downgrade. There are certain derivatives that could require collateral, but not accelerated payment, in the event of various credit rating changes of certain Southern Company subsidiaries. Generally, collateral may be provided by a Southern Company guaranty, letter of credit, or cash. At December 31, 2023, the Registrants had no collateral posted with derivative counterparties to satisfy these arrangements. For Southern Company, the fair value of foreign currency derivative liabilities and interest rate derivative liabilities with contingent features, and the maximum potential collateral requirements arising from the credit-risk-related contingent features at a rating below BBB- and/or Baa3, was $52 million at December 31, 2023. For Southern Power, the fair value of foreign currency derivative liabilities with contingent features, and the maximum potential collateral requirements arising from the credit-risk-related contingent features at a rating below BBB- and/or Baa3, was immaterial at December 31, 2023. For the traditional electric operating companies and Southern Power, energy-related derivative liabilities with contingent features and the maximum potential collateral requirements arising from the credit-risk-related contingent features, at a rating below BBB- and/or Baa3, were immaterial at December 31, 2023. The maximum potential collateral requirements arising from the credit-risk-related contingent features for the traditional electric operating companies and Southern Power include certain agreements that could require collateral in the event that one or more Southern Company power pool participants has a credit rating change to below investment grade. Alabama Power and Southern Power maintain accounts with certain regional transmission organizations to facilitate financial derivative transactions and they may be required to post collateral based on the value of the positions in these accounts and the associated margin requirements. At December 31, 2023, cash collateral posted in these accounts was immaterial for Alabama Power and Southern Power. Southern Company Gas maintains accounts with brokers or the clearing houses of certain exchanges to facilitate financial derivative transactions. Based on the value of the positions in these accounts and the associated margin requirements, Southern Company Gas may be required to deposit cash into these accounts. At December 31, 2023, cash collateral held on deposit in broker margin accounts was $62 million. The Registrants are exposed to losses related to financial instruments in the event of counterparties' nonperformance. The Registrants only enter into agreements and material transactions with counterparties that have investment grade credit ratings by Moody's and S&P or with counterparties who have posted collateral to cover potential credit exposure. The Registrants have also established risk management policies and controls to determine and monitor the creditworthiness of counterparties in order to mitigate their exposure to counterparty credit risk. Southern Company Gas uses established credit policies to determine and monitor the creditworthiness of counterparties, including requirements to post collateral or other credit security, as well as the quality of pledged collateral. Collateral or credit security is most often in the form of cash or letters of credit from an investment-grade financial institution, but may also include cash or U.S. government securities held by a trustee. Prior to entering a physical transaction, Southern Company Gas assigns its counterparties an internal credit rating and credit limit based on the counterparties' Moody's, S&P, and Fitch ratings, commercially available credit reports, and audited financial statements. Southern Company Gas may require counterparties to pledge additional collateral when deemed necessary. Southern Company Gas utilizes netting agreements whenever possible to mitigate exposure to counterparty credit risk. Netting agreements enable Southern Company Gas to net certain assets and liabilities by counterparty across product lines and against cash collateral, provided the netting and cash collateral agreements include such provisions. While the amounts due from, or owed to, counterparties are settled net, they are recorded on a gross basis on the balance sheet as energy marketing receivables and energy marketing payables. The Registrants do not anticipate a material adverse effect on their respective financial statements as a result of counterparty nonperformance. 15. ACQUISITIONS AND DISPOSITIONS None of the dispositions discussed herein, both individually and combined, represented a strategic shift in operations for the applicable Registrants that has, or is expected to have, a major effect on its operations and financial results; therefore, none of the assets related to the sales have been classified as discontinued operations for any of the periods presented. Southern Company In October 2021, Southern Company completed the sale of a leveraged lease investment to the lessee for $45 million. No gain or loss was recognized on the sale; however, it did result in the recognition of approximately $16 million of additional tax benefits. Prior to the sale, in the second quarter 2021, a charge of $7 million ($6 million after tax) was recorded to reduce the investment to its estimated fair value, less costs to sell. In December 2021, Southern Company completed the termination of its leasehold interest in assets associated with its two international leveraged lease projects and received cash proceeds of approximately $673 million after the accelerated exercise of the lessee's purchase options. The pre-tax gain associated with the transaction was approximately $93 million ($99 million gain after tax). Alabama Power In September 2022, Alabama Power completed its acquisition of the Calhoun Generating Station, which was accounted for as an asset acquisition. The total purchase price was $179 million, of which $171 million was related to net assets recorded within property, plant, and equipment on the balance sheet and reflected in property additions within the investing section of the statement of cash flows. The remainder primarily related to fossil fuel stock and materials and supplies. See Note 2 under "Alabama Power – Rate CNP New Plant" for additional information. Southern Power Southern Power's acquisition-related costs for the projects discussed under "Asset Acquisitions" and "Construction Projects" were not material for any of the years presented. There were no asset acquisitions during 2022. Asset Acquisitions
(a)The project includes an option to expand capacity up to an additional 300 MWs. Subsequent to December 31, 2023, Southern Power committed to expand the construction of the facility through a second phase adding up to 205 MWs, with commercial operation expected to occur in the second quarter 2026. (b)In March 2021, Southern Power acquired a controlling interest in the project from Invenergy Renewables LLC and completed a tax equity transaction whereby it sold the Class A membership interests in the project. Southern Power consolidates the project's operating results in its financial statements and the tax equity partner and Invenergy Renewables LLC each own a noncontrolling interest. The aggregate purchase price for the two projects acquired during 2023 was $193 million, which is primarily recorded within construction work in progress on the balance sheet at December 31, 2023. Construction Projects
(a)In 2020, Southern Power restructured its ownership of the project, while retaining the controlling interests, by contributing the Class A membership interests to an existing partnership and selling 100% of the Class B membership interests. During 2021, Southern Power further restructured its ownership in the battery energy storage projects and completed tax equity transactions whereby it sold the Class A membership interests in the projects. Southern Power consolidates each project's operating results in its financial statements and the tax equity partner and two other partners each own a noncontrolling interest. See Note 9 under "Lessor" for additional information. (b)The facility has a total capacity of 88 MWs, of which 73 MWs were placed in service in 2021 and 15 MWs were placed in service in 2022. (c)The facility has a total capacity of 72 MWs, of which 32 MWs were placed in service in 2021 and 40 MWs were placed in service in 2022. (d)In December 2020, Southern Power purchased 100% of the membership interests of the Glass Sands facility. Development Projects Southern Power purchased wind turbine equipment in 2016 and 2017 for deployment to development and construction projects. All of this equipment has either been deployed to projects that have been completed or has been sold to third parties. Gains on wind turbine equipment contributed to various equity method investments totaled approximately $37 million in 2021. Southern Company Gas Sale of Sequent In July 2021, Southern Company Gas affiliates completed the sale of Sequent to Williams Field Services Group for a total cash purchase price of $159 million, including final working capital adjustments. The pre-tax gain associated with the transaction was approximately $121 million ($92 million after tax). The sale resulted in $85 million of additional tax expense. Sale of Natural Gas Storage Facilities In September 2022, certain affiliates of Southern Company Gas entered into agreements to sell two natural gas storage facilities located in California and Texas for an aggregate purchase price of $186 million, plus working capital and certain other adjustments. The sale of the Texas facility was completed in November 2022 and the sale of the California facility was completed on September 22, 2023. Both sales resulted in an immaterial loss. Completion of the sale of the Texas facility was subject to release of a Southern Company Gas parent guarantee, which was executed in October 2022 and, as a result, Southern Company Gas recorded pre-tax impairment charges totaling approximately $131 million ($99 million after tax) in the fourth quarter 2022. 16. SEGMENT AND RELATED INFORMATION Southern Company Southern Company's reportable business segments are the sale of electricity by the traditional electric operating companies, the sale of electricity in the competitive wholesale market by Southern Power, and the sale of natural gas and other complementary products and services by Southern Company Gas. Revenues from sales by Southern Power to the traditional electric operating companies were $537 million, $875 million, and $515 million in 2023, 2022, and 2021, respectively. Revenues from sales of natural gas from Southern Company Gas to the traditional electric operating companies were immaterial for all periods presented. Revenues from sales of natural gas from Southern Company Gas (prior to its sale of Sequent) to Southern Power were $18 million in 2021. The "All Other" column includes the Southern Company parent entity, which does not allocate operating expenses to business segments. Also, this category includes segments below the quantitative threshold for separate disclosure. These segments include providing distributed energy and resilience solutions and deploying microgrids for commercial, industrial, governmental, and utility customers, as well as investments in telecommunications. All other inter-segment revenues are not material. Financial data for business segments and products and services for the years ended December 31, 2023, 2022, and 2021 was as follows:
(a)Attributable to Southern Company. (b)For the traditional electric operating companies, includes pre-tax charges (credits) to income at Georgia Power for the estimated probable loss associated with the construction of Plant Vogtle Units 3 and 4 of $(68) million ($(50) million after tax) in 2023, $183 million ($137 million after tax) in 2022, and $1.7 billion ($1.3 billion after tax) in 2021. See Note 2 under "Georgia Power – Nuclear Construction" for additional information. (c)For Southern Power, includes an $18 million pre-tax loss recovery ($9 million after tax and partnership allocations) related to an arbitration award and a $16 million pre-tax gain ($12 million after tax) on the sale of spare parts. See Note 3 under "General Litigation Matters – Southern Power" for additional information. (d)For Southern Company Gas, includes pre-tax charges totaling approximately $96 million ($72 million after tax) associated with the disallowance of certain capital investments at Nicor Gas. See Note 2 under "Southern Company Gas" for additional information. (e)For Southern Company Gas, includes pre-tax impairment charges totaling approximately $131 million ($99 million after tax) related to the sale of natural gas storage facilities. See Note 15 under "Southern Company Gas" for additional information. (f)For the "All Other" column, includes a $119 million goodwill impairment loss (pre-tax and after tax) at PowerSecure. See Note 1 under "Goodwill and Other Intangible Assets" for additional information. (g)For Southern Power, includes gains on wind turbine equipment contributed to various equity method investments totaling approximately $37 million pre-tax ($28 million after tax). See Notes 7 and 15 under "Southern Power" for additional information. (h)For Southern Company Gas, includes a pre-tax gain of $121 million ($92 million after tax) related to its sale of Sequent, as well as the resulting $85 million of additional tax expense due to changes in state apportionment rates, and pre-tax impairment charges totaling $84 million ($67 million after tax) related to its equity method investment in the PennEast Pipeline project. See Notes 7 and 15 under "Southern Company Gas" for additional information. (i)For the "All Other" column, includes a pre-tax gain of $93 million ($99 million gain after tax) associated with the termination of two leveraged leases projects. See Note 15 under "Southern Company" for additional information. Products and Services
Southern Company Gas Southern Company Gas manages its business through three reportable segments – gas distribution operations, gas pipeline investments, and gas marketing services. Prior to the sale of Sequent on July 1, 2021, Southern Company Gas' reportable segments also included wholesale gas services. The non-reportable segments are combined and presented as all other. See Note 15 under "Southern Company Gas" for additional information on the disposition activities described herein. Gas distribution operations is the largest component of Southern Company Gas' business and includes natural gas local distribution utilities that construct, manage, and maintain intrastate natural gas pipelines and gas distribution facilities in four states. Gas pipeline investments consists of joint ventures in natural gas pipeline investments including a 50% interest in SNG and a 50% joint ownership interest in the Dalton Pipeline. These natural gas pipelines enable the provision of diverse sources of natural gas supplies to the customers of Southern Company Gas. See Notes 5 and 7 for additional information. Through July 1, 2021, wholesale gas services provided natural gas asset management and/or related logistics services for each of Southern Company Gas' utilities except Nicor Gas as well as for non-affiliated companies. Additionally, wholesale gas services engaged in natural gas storage and gas pipeline arbitrage and related activities. Gas marketing services provides natural gas marketing to end-use customers primarily in Georgia and Illinois through SouthStar. The all other column includes segments and subsidiaries that fall below the quantitative threshold for separate disclosure, including storage and fuels operations. The all other column included a natural gas storage facility in Texas through its sale in November 2022 and a natural gas storage facility in California through its sale in September 2023. Financial data for business segments for the years ended December 31, 2023, 2022, and 2021 was as follows:
(a)As a result of the sale of Sequent, wholesale gas services is no longer a reportable segment in 2023 or 2022. Prior to the sale of Sequent, the revenues for wholesale gas services were netted with costs associated with its energy and risk management activities. A reconciliation of operating revenues and intercompany revenues is shown in the following table.
(b)For gas distribution operations, includes pre-tax charges totaling approximately $96 million ($72 million after tax) associated with the disallowance of certain capital investments at Nicor Gas. See Note 2 under "Southern Company Gas" for additional information. (c)For the "All Other" column, includes pre-tax impairment charges totaling approximately $131 million ($99 million after tax) related to the sale of natural gas storage facilities. See Note 15 under "Southern Company Gas" for additional information. (d)For gas pipeline investments, includes pre-tax impairment charges totaling $84 million ($67 million after tax) related to the equity method investment in the PennEast Pipeline project. See Note 7 under "Southern Company Gas" for additional information. (e)For wholesale gas services, includes a pre-tax gain of $121 million ($92 million after tax) related to the sale of Sequent. (f)For the "All Other" column, includes $85 million of additional tax expense as a result of the sale of Sequent. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
3. CONTINGENCIES, COMMITMENTS, AND GUARANTEES General Litigation Matters The Registrants are involved in various matters being litigated and regulatory matters. The ultimate outcome of such pending or potential litigation or regulatory matters against each Registrant and any subsidiaries cannot be determined at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on such Registrant's financial statements. The Registrants intend to dispute the allegations raised in and vigorously defend against the pending legal challenges discussed below; however, the ultimate outcome of these matters cannot be determined at this time. Southern Company and Mississippi Power In 2010, the DOE, through a cooperative agreement with SCS, agreed to fund $270 million of the Kemper County energy facility through the grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2. In 2016, additional DOE grants in the amount of $137 million were awarded to the Kemper County energy facility. In 2018, Mississippi Power filed with the DOE its request for property closeout certification under the contract related to the $387 million of total grants received. In 2020, Mississippi Power and Southern Company executed an agreement with the DOE completing Mississippi Power's request, which enabled Mississippi Power to proceed with full dismantlement of the abandoned gasifier-related assets and site restoration activities. In connection with the DOE closeout discussions, in 2019, the Civil Division of the Department of Justice informed Southern Company and Mississippi Power of a civil investigation related to the DOE grants. On August 4, 2023, the U.S. District Court for the Northern District of Georgia unsealed a civil action in which defendants Southern Company, SCS, and Mississippi Power are alleged to have violated certain provisions of the False Claims Act by fraudulently inducing the DOE to disburse funds pursuant to the grants. The federal government declined to intervene in the action. On October 30, 2023, the plaintiff, a former SCS employee, filed an amended complaint, again alleging certain violations of the False Claims Act. The plaintiff seeks to recover all damages incurred personally and on behalf of the government caused by the defendants' alleged violations, as well as treble damages and attorneys' fees, among other relief. The ultimate outcome of this matter cannot be determined at this time; however, an adverse outcome could have a material impact on Southern Company's and Mississippi Power's financial statements. Alabama Power In September 2022, Mobile Baykeeper filed a citizen suit in the U.S. District Court for the Southern District of Alabama alleging that Alabama Power's plan to close the Plant Barry ash pond utilizing a closure-in-place methodology violates the Resource Conservation and Recovery Act (RCRA) and regulations governing CCR. Among other relief requested, Mobile Baykeeper sought a declaratory judgment that the RCRA and regulations governing CCR were being violated, preliminary and injunctive relief to prevent implementation of Alabama Power's closure plan and the development of a closure plan that satisfies regulations governing CCR requirements. In December 2022, Alabama Power filed a motion to dismiss the case. On January 4, 2024, the lawsuit was dismissed without prejudice by the U.S. District Court judge. On February 1, 2024, the plaintiff filed a motion to reconsider. On January 31, 2023, the EPA issued a Notice of Potential Violations associated with Alabama Power's plan to close the Plant Barry ash pond. Alabama Power has affirmed to the EPA its position that it is in compliance with CCR requirements. The ultimate outcome of this matter cannot be determined at this time but could have a material impact on Alabama Power's ARO estimates and cash flows. See Note 6 for a discussion of Alabama Power's ARO liabilities. Georgia Power In July 2020, a group of individual plaintiffs filed a complaint, which was amended in December 2022, in the Superior Court of Fulton County, Georgia against Georgia Power alleging that the construction and operation of Plant Scherer has impacted groundwater and air, resulting in alleged personal injuries and property damage. The plaintiffs seek an unspecified amount of monetary damages including punitive damages, a medical monitoring fund, and injunctive relief. In December 2022, the Superior Court of Fulton County, Georgia granted Georgia Power's motion to transfer the case to the Superior Court of Monroe County, Georgia. On May 9, 2023, the Superior Court of Monroe County, Georgia denied Georgia Power's motion to dismiss the case for lack of subject matter jurisdiction. On July 27, 2023, the Superior Court of Monroe County, Georgia denied the remaining motions to dismiss certain claims and plaintiffs that Georgia Power filed at the outset of the case. In October 2021, February 2022, and January 2023, a total of eight additional complaints were filed in the Superior Court of Monroe County, Georgia against Georgia Power alleging that releases from Plant Scherer have impacted groundwater and air, resulting in alleged personal injuries and property damage. The plaintiffs sought an unspecified amount of monetary damages including punitive damages. After Georgia Power removed these cases to the U.S. District Court for the Middle District of Georgia, the plaintiffs voluntarily dismissed their complaints without prejudice in November 2022 and January 2023. On May 12, 2023, the plaintiffs in the cases originally filed in October 2021, February 2022, and January 2023 refiled their eight complaints in the Superior Court of Monroe County, Georgia. Also on May 12, 2023, a new complaint was filed in the Superior Court of Monroe County, Georgia against Georgia Power alleging that the construction and operation of Plant Scherer have impacted groundwater and air, resulting in alleged personal injuries. The plaintiff seeks an unspecified amount of monetary damages, including punitive damages. On May 18, 2023, Georgia Power removed all of these cases to the U.S. District Court for the Middle District of Georgia. The plaintiffs are requesting the court remand the cases back to the Superior Court of Monroe County, Georgia. The amount of possible loss, if any, from these matters cannot be estimated at this time. See Note 17 under "Georgia Power - General Litigation Matters" for additional information. Mississippi Power In 2018, Ray C. Turnage and 10 other individual plaintiffs filed a putative class action complaint against Mississippi Power and the three then-serving members of the Mississippi PSC in the U.S. District Court for the Southern District of Mississippi, which was amended in March 2019 to include four additional plaintiffs. Mississippi Power received Mississippi PSC approval in 2013 to charge a mirror CWIP rate premised upon including in its rate base pre-construction and construction costs for the Kemper IGCC prior to placing the Kemper IGCC into service. The Mississippi Supreme Court reversed that approval and ordered Mississippi Power to refund the amounts paid by customers under the previously-approved mirror CWIP rate. The plaintiffs allege that the initial approval process, and the amount approved, were improper and make claims for gross negligence, reckless conduct, and intentional wrongdoing. They also allege that Mississippi Power underpaid customers by up to $23.5 million in the refund process by applying an incorrect interest rate. The plaintiffs seek to recover, on behalf of themselves and their putative class, actual damages, punitive damages, pre-judgment interest, post-judgment interest, attorney's fees, and costs. The district court dismissed the amended complaint; however, in March 2020, the plaintiffs filed a motion seeking to name the new members of the Mississippi PSC, the Mississippi Development Authority, and Southern Company as additional defendants and add a cause of action against all defendants based on a dormant commerce clause theory under the U.S. Constitution. In July 2020, the plaintiffs filed a motion for leave to file a third amended complaint, which included the same federal claims as the proposed second amended complaint, as well as several additional state law claims based on the allegation that Mississippi Power failed to disclose the annual percentage rate of interest applicable to refunds. In November 2020, the district court denied each of the plaintiffs' pending motions and entered final judgment in favor of Mississippi Power. In January 2021, the district court denied further motions by the plaintiffs to vacate the judgment and to file a revised second amended complaint. In February 2021, the plaintiffs filed a notice of appeal with the U.S. Court of Appeals for the Fifth Circuit. In March 2022, the U.S. Court of Appeals for the Fifth Circuit issued an opinion affirming the dismissal of the claims against the Mississippi PSC defendants but reversing the dismissal of the claims against Mississippi Power. In May 2022, the U.S. Court of Appeals for the Fifth Circuit denied a petition by Mississippi Power for a rehearing en banc and remanded the case to the U.S. District Court for the Southern District of Mississippi for further proceedings. In June 2022, Mississippi Power filed with the trial court a motion to dismiss the complaint with prejudice, which was granted on March 15, 2023. On March 28, 2023, the plaintiffs filed a notice of appeal with the U.S. Court of Appeals for the Fifth Circuit. On December 14, 2023, the U.S. Court of Appeals for the Fifth Circuit affirmed the district court's order dismissing the plaintiffs' complaint against Mississippi Power. On December 28, 2023, the plaintiffs filed a petition for panel rehearing, which was denied on January 10, 2024. The plaintiffs have until April 9, 2024 to file a petition for writ of certiorari with the U.S. Supreme Court. The ultimate outcome of this matter cannot be determined at this time. Southern Power In July 2021, Southern Power and certain of its subsidiaries filed an arbitration demand with the American Arbitration Association against First Solar Electric, LLC (First Solar) for defective design of actuators on trackers and inverters installed by First Solar under the engineering, procurement, and construction agreements associated with five solar projects owned by Southern Power and partners and managed by Southern Power. In February 2023, arbitration hearings concluded. In July 2023, an interim award of approximately $36 million was entered in favor of Southern Power and was subsequently received in September 2023. The interim award included $18 million representing recovery of losses associated with replacement costs, penalty payments, and lost revenues previously incurred. This recovery is reflected in Southern Power's 2023 statement of income as an $11 million reduction to other operations and maintenance expense and a $7 million increase in other revenues, with $6 million allocated through noncontrolling interests to Southern Power's partners. The remaining $18 million in award proceeds received in excess of the losses incurred is recognized on the balance sheet at December 31, 2023 as restricted cash and a liability to fund future replacement costs. In November 2023, the final award was issued and Southern Power filed for confirmation of the final award in the Delaware Court of Chancery. In December 2023, First Solar filed a motion to dismiss the confirmation and, in February 2024, filed a petition to vacate the arbitration award in the Supreme Court of New York County, New York. The ultimate outcome of this matter cannot be determined at this time. Environmental Remediation The Southern Company system must comply with environmental laws and regulations governing the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies and the natural gas distribution utilities conduct studies to determine the extent of any required cleanup and have recognized the estimated costs to clean up known impacted sites in the financial statements. A liability for environmental remediation costs is recognized only when a loss is determined to be probable and reasonably estimable and is reduced as expenditures are incurred. The traditional electric operating companies and the natural gas distribution utilities in Illinois and Georgia have each received authority from their respective state PSCs or other applicable state regulatory agencies to recover approved environmental remediation costs through regulatory mechanisms. Any difference between the liabilities accrued and costs recovered through rates is deferred as a regulatory asset or liability. These regulatory mechanisms are adjusted annually or as necessary within limits approved by the state PSCs or other applicable state regulatory agencies. Georgia Power has been designated or identified as a potentially responsible party at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act, and assessment and potential cleanup of such sites is expected. For 2023, 2022, and 2021, Georgia Power recovered approximately $5 million, $12 million, and $12 million, respectively, through the ECCR tariff for environmental remediation. Southern Company Gas is subject to environmental remediation liabilities associated with 40 former manufactured gas plant sites in four different states. Southern Company Gas' accrued environmental remediation liability at December 31, 2023 and 2022 was based on the estimated cost of environmental investigation and remediation associated with these sites. At December 31, 2023 and 2022, the environmental remediation liability and the balance of under recovered environmental remediation costs were reflected in the balance sheets of Southern Company, Georgia Power, and Southern Company Gas as shown in the table below. Alabama Power and Mississippi Power did not have environmental remediation liabilities at December 31, 2023 or 2022.
The ultimate outcome of these matters cannot be determined at this time; however, as a result of the regulatory treatment for environmental remediation expenses described above, the final disposition of these matters is not expected to have a material impact on the financial statements of the applicable Registrants. Nuclear Fuel Disposal Costs Acting through the DOE and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with Alabama Power and Georgia Power that required the DOE to take title to and dispose of spent nuclear fuel generated at Plants Farley, Hatch, and Vogtle Units 1 and 2 beginning no later than January 31, 1998. The DOE has yet to commence performance of its contractual and statutory obligation to dispose of spent nuclear fuel. Consequently, Alabama Power and Georgia Power pursued and continue to pursue legal remedies against the U.S. government for its partial breach of contract. In 2014, Alabama Power and Georgia Power filed their third round of lawsuits against the U.S. government in the Court of Federal Claims, seeking damages for the costs of continuing to store spent nuclear fuel at Plants Farley, Hatch, and Vogtle Units 1 and 2 for the period from January 1, 2011 through December 31, 2013. The damage period was subsequently extended to December 31, 2014. In 2019, the Court of Federal Claims granted Alabama Power's and Georgia Power's motion for summary judgment on damages not disputed by the U.S. government, awarding those undisputed damages to Alabama Power and Georgia Power. However, those undisputed damages are not collectible until the court enters final judgment on the remaining damages. In 2017, Alabama Power and Georgia Power filed their fourth round of lawsuits against the U.S. government in the Court of Federal Claims, seeking damages for the costs of continuing to store spent nuclear fuel at Plants Farley, Hatch, and Vogtle Units 1 and 2 for the period from January 1, 2015 through December 31, 2017. In 2020, Alabama Power and Georgia Power filed amended complaints in those fourth-round lawsuits adding damages incurred from January 1, 2018 to December 31, 2019 to the claim period. The outstanding claims for the period January 1, 2011 through December 31, 2019 total $106 million and $128 million for Alabama Power and Georgia Power (based on its ownership interests), respectively. Damages will continue to accumulate until the issue is resolved, the U.S. government disposes of Alabama Power's and Georgia Power's spent nuclear fuel pursuant to its contractual obligations, or alternative storage is otherwise provided. No amounts have been recognized in the financial statements as of December 31, 2023 for any potential recoveries from the pending lawsuits. The final outcome of these matters cannot be determined at this time. However, Alabama Power and Georgia Power expect to credit any recoveries for the benefit of customers in accordance with direction from their respective PSC; therefore, no material impact on Southern Company's, Alabama Power's, or Georgia Power's net income is expected. On-site dry spent fuel storage facilities are operational at all three plants and can be expanded to accommodate spent fuel through the expected life of each plant. Nuclear Insurance Under the Price-Anderson Amendments Act (Act), Alabama Power and Georgia Power maintain agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at the companies' nuclear power plants. The Act provides funds up to $16.2 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $450 million by American Nuclear Insurers (ANI), with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. A company could be assessed up to $166 million per incident for each licensed reactor it operates but not more than an aggregate of $25 million per incident to be paid in a calendar year for each reactor. Such maximum assessment, excluding any applicable state premium taxes, for Alabama Power and Georgia Power, based on its ownership and buyback interests in all licensed reactors, is $332 million and $473 million, respectively, per incident, but not more than an aggregate of $49 million and $71 million, respectively, to be paid for each incident in any one year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years. The next scheduled adjustment is due no later than November 1, 2028. See Note 5 under "Joint Ownership Agreements" for additional information on joint ownership agreements. Alabama Power and Georgia Power are members of Nuclear Electric Insurance Limited (NEIL), a mutual insurer established to provide property damage insurance in an amount up to $1.5 billion for members' operating nuclear generating facilities. Additionally, both companies have NEIL policies that currently provide decontamination, excess property insurance, and premature decommissioning coverage up to $1.25 billion for nuclear losses and policies providing coverage up to $750 million for non-nuclear losses in excess of the $1.5 billion primary coverage. NEIL also covers the additional costs that would be incurred in obtaining replacement power during a prolonged accidental outage at a member's nuclear plant. Members can purchase this coverage, subject to a deductible waiting period of up to 26 weeks, with a maximum per occurrence per unit limit of $490 million. After the deductible period, weekly indemnity payments would be received until either the unit is operational or until the limit is exhausted. Alabama Power and Georgia Power each purchase limits based on the projected full cost of replacement power, subject to ownership limitations, and have each elected a 12-week deductible waiting period for each nuclear plant. A builders' risk property insurance policy has been purchased from NEIL for the construction of Plant Vogtle Unit 4. This policy provides the Vogtle Owners up to $2.75 billion for accidental property damage occurring during construction. Under each of the NEIL policies, members are subject to assessments each year if losses exceed the accumulated funds available to the insurer. The maximum annual assessments for Alabama Power and Georgia Power as of December 31, 2023 under the NEIL policies would be $54 million and $89 million, respectively. Claims resulting from terrorist acts and cyber events are covered under both the ANI and NEIL policies (subject to normal policy limits). The maximum aggregate that NEIL will pay for all claims resulting from terrorist acts and cyber events in any 12-month period is $3.2 billion each, plus such additional amounts NEIL can recover through reinsurance, indemnity, or other sources. For all on-site property damage insurance policies for commercial nuclear power plants, the NRC requires that the proceeds of such policies shall be dedicated first for the sole purpose of placing the reactor in a safe and stable condition after an accident. Any remaining proceeds are to be applied next toward the costs of decontamination and debris removal operations ordered by the NRC, and any further remaining proceeds are to be paid either to the applicable company or to its debt trustees as may be appropriate under the policies and applicable trust indentures. In the event of a loss, the amount of insurance available might not be adequate to cover property damage and other expenses incurred. Uninsured losses and other expenses, to the extent not recovered from customers, would be borne by Alabama Power or Georgia Power, as applicable, and could have a material effect on Southern Company's, Alabama Power's, and Georgia Power's financial condition and results of operations. All retrospective assessments, whether generated for liability, property, or replacement power, may be subject to applicable state premium taxes. Other Matters Traditional Electric Operating Companies In April 2019, Bellsouth Telecommunications d/b/a AT&T Alabama (AT&T) filed a complaint against Alabama Power with the FCC alleging that the pole rental rate AT&T is required to pay pursuant to the parties' joint use agreement is unjust and unreasonable under federal law. The complaint sought a new rate and approximately $87 million in refunds of alleged overpayments for the preceding six years. In August 2019, the FCC stayed the case in favor of arbitration, which AT&T has not pursued. The joint use agreement remains in effect. The ultimate outcome of this matter cannot be determined at this time, but an adverse outcome could have a material impact on the financial statements of Southern Company and Alabama Power. Georgia Power and Mississippi Power have joint use agreements with other AT&T affiliates. Mississippi Power Kemper County Energy Facility In 2021, 2022, and 2023, Mississippi Power recorded charges to income associated with abandonment and related closure costs and ongoing period costs, net of salvage proceeds, for the mine and gasifier-related assets at the Kemper County energy facility. These charges, including related tax impacts, totaled $11 million pre-tax ($8 million after tax) in 2021, $15 million pre-tax ($12 million after tax) in 2022, and $17 million pre-tax ($12 million after tax) in 2023. The pre-tax charges are included in other operations and maintenance expenses on the statements of income. Dismantlement of the abandoned gasifier-related assets and site restoration activities are expected to be completed by 2026. Additional pre-tax period costs associated with dismantlement and site restoration activities, including related costs for compliance and safety, ARO accretion, and property taxes, net of salvage, are estimated to total approximately $15 million annually through 2025. Mississippi Power owns the lignite mine located around the Kemper County energy facility site. As a result of the abandonment of the Kemper IGCC, final mine reclamation began in 2018 and was substantially completed in 2020, with monitoring expected to continue through 2028. As the mining permit holder, Liberty Fuels Company, LLC, a wholly-owned subsidiary of The North American Coal Corporation, has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. See Note 6 for additional information. See "General Litigation Matters – Southern Company and Mississippi Power" herein for information regarding litigation associated with the Kemper County energy facility. Plant Daniel In conjunction with Southern Company's 2019 sale of Gulf Power, NextEra Energy held back $75 million of the purchase price pending Mississippi Power and NextEra Energy negotiating a mutually acceptable revised operating agreement for Plant Daniel. In July 2022, the co-owners executed a revised operating agreement and Southern Company subsequently received the remaining $75 million of the purchase price. The dispatch procedures in the revised operating agreement for the two jointly-owned coal units at Plant Daniel resulted in Mississippi Power designating one of the two units as primary and the other as secondary in lieu of each company separately owning 100% of a single generating unit. Mississippi Power did not exercise an option to purchase its co-owner's ownership interest for $1 on January 15, 2024. The revised operating agreement did not have a material impact on Mississippi Power's financial statements. See Note 2 under "Mississippi Power – Integrated Resource Plan" for additional information on Plant Daniel. Commitments To supply a portion of the fuel requirements of the Southern Company system's electric generating plants, the Southern Company system has entered into various long-term commitments not recognized on the balance sheets for the procurement and delivery of fossil fuel and, for Alabama Power and Georgia Power, nuclear fuel. The majority of the Registrants' fuel expense for the periods presented was purchased under long-term commitments. Each Registrant expects that a substantial amount of its future fuel needs will continue to be purchased under long-term commitments. Georgia Power has commitments, in the form of capacity purchases, regarding a portion of a 5% interest in the original cost of Plant Vogtle Units 1 and 2 owned by MEAG Power that are in effect until the later of the retirement of the plant or the latest stated maturity date of MEAG Power's bonds issued to finance such ownership interest. The payments for capacity are required whether or not any capacity is available. Portions of the capacity payments made to MEAG Power for its Plant Vogtle Units 1 and 2 investment relate to costs in excess of Georgia Power's allowed investment for ratemaking purposes. The present value of these portions at the time of the disallowance was written off. Generally, the cost of such capacity is included in purchased power in Southern Company's statements of income and in purchased power, non-affiliates in Georgia Power's statements of income. Georgia Power's capacity payments related to this commitment totaled $3 million, $4 million, and $6 million in 2023, 2022, and 2021, respectively. At December 31, 2023, Georgia Power's estimated long-term obligations related to this commitment totaled $39 million, consisting of $4 million annually for 2024 and 2025, $2 million annually for 2026 through 2028, and $25 million thereafter. See Note 9 for information regarding PPAs accounted for as leases. Southern Company Gas has commitments for pipeline charges, storage capacity, and gas supply, including charges recoverable through natural gas cost recovery mechanisms or, alternatively, billed to marketers selling retail natural gas. Gas supply commitments include amounts for gas commodity purchases associated with Nicor Gas and SouthStar of 38 million mmBtu at floating gas prices calculated using forward natural gas prices at December 31, 2023 and valued at $98 million. Southern Company Gas provides guarantees to certain gas suppliers for certain of its subsidiaries in support of payment obligations. Southern Company Gas' expected future contractual obligations for pipeline charges, storage capacity, and gas supply that are not recognized on the balance sheets at December 31, 2023 were as follows:
Guarantees SCS may enter into various types of wholesale energy and natural gas contracts acting as an agent for the traditional electric operating companies and Southern Power. Under these agreements, each of the traditional electric operating companies and Southern Power may be jointly and severally liable. Accordingly, Southern Company has entered into keep-well agreements with each of the traditional electric operating companies to ensure they will not subsidize or be responsible for any costs, losses, liabilities, or damages resulting from the inclusion of Southern Power as a contracting party under these agreements. Alabama Power has guaranteed a $100 million principal amount long-term bank loan SEGCO entered into in 2018 and subsequently extended and amended. Georgia Power has agreed to reimburse Alabama Power for the portion of such obligation corresponding to Georgia Power's proportionate ownership of SEGCO's stock if Alabama Power is called upon to make such payment under its guarantee. At December 31, 2023, the capitalization of SEGCO consisted of $69 million of equity and $100 million of long-term debt that matures in November 2024, on which the annual interest requirement is derived from a variable rate index. SEGCO had no short-term debt outstanding at December 31, 2023. See Note 7 under "SEGCO" for additional information. As discussed in Note 9, Alabama Power and Georgia Power have entered into certain residual value guarantees related to railcar leases. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
17. SUBSEQUENT EVENTS Georgia Power Integrated Resource Plans On March 26, 2024, Georgia Power and the staff of the Georgia PSC reached a stipulated agreement for the 2023 IRP Update which Georgia Power expects the Georgia PSC to render a final decision on April 16, 2024. The ultimate outcome of this matter cannot be determined at this time. See Note 2 under "Georgia Power – Integrated Resource Plans" for additional information. Nuclear Construction Cost and Schedule On March 1, 2024, the generator of Unit 4 successfully synchronized to the power grid and generated electricity for the first time. See Note 2 under "Georgia Power – Nuclear Construction" for additional information. General Litigation Matters On March 11, 2024, Georgia Power filed a motion to dismiss certain claims. On March 14, 2024, Georgia Power filed motions for summary judgement. See Note 3 under "Georgia Power" for additional information. Transmission Property Sales In December 2023, Georgia Power requested and subsequent to December 31, 2023, FERC approved the sale of transmission lines under Docket No. AC24-24-000. The sale is expected to be completed during second quarter 2024. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
STATEMENTS OF ACCUMULATED COMPREHENSIVE INCOME, COMPREHENSIVE INCOME, AND HEDGING ACTIVITIES |
||||||||||
|
||||||||||
| Line No. |
Item (a) |
Unrealized Gains and Losses on Available-For-Sale Securities (b) |
Minimum Pension Liability Adjustment (net amount) (c) |
Foreign Currency Hedges (d) |
Other Adjustments (e) |
Other Cash Flow Hedges Interest Rate Swaps (f) |
Other Cash Flow Hedges [Specify] (g) |
Totals for each category of items recorded in Account 219 (h) |
Net Income (Carried Forward from Page 116, Line 78) (i) |
Total Comprehensive Income (j) |
| 1 | Balance of Account 219 at Beginning of Preceding Year |
|||||||||
| 2 | Preceding Quarter/Year to Date Reclassifications from Account 219 to Net Income |
|||||||||
| 3 | Preceding Quarter/Year to Date Changes in Fair Value |
|||||||||
| 4 | Total (lines 2 and 3) |
|||||||||
| 5 | Balance of Account 219 at End of Preceding Quarter/Year |
|||||||||
| 6 | Balance of Account 219 at Beginning of Current Year |
|||||||||
| 7 | Current Quarter/Year to Date Reclassifications from Account 219 to Net Income |
|||||||||
| 8 | Current Quarter/Year to Date Changes in Fair Value |
|||||||||
| 9 | Total (lines 7 and 8) |
|||||||||
| 10 | Balance of Account 219 at End of Current Quarter/Year |
(a) |
||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: AccumulatedOtherComprehensiveIncomeLossOtherAdjustmentsToComprehensiveIncomeLossBalance |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SUMMARY OF UTILITY PLANT AND ACCUMULATED PROVISIONS FOR DEPRECIATION. AMORTIZATION AND DEPLETION |
||||||||
|
Report in Column (c) the amount for electric function, in column (d) the amount for gas function, in column (e), (f), and (g) report other (specify) and in column (h) common function. |
||||||||
| Line No. |
Classification (a) |
Total Company For the Current Year/Quarter Ended (b) |
Electric (c) |
Gas (d) |
Other (Specify) (e) |
Other (Specify) (f) |
Other (Specify) (g) |
Common (h) |
|
1 |
UtilityPlantAbstract UTILITY PLANT |
|||||||
|
2 |
UtilityPlantInServiceAbstract In Service |
|||||||
|
3 |
UtilityPlantInServiceClassified Plant in Service (Classified) |
|
|
|||||
|
4 |
UtilityPlantInServicePropertyUnderCapitalLeases Property Under Capital Leases |
|
|
|||||
|
5 |
UtilityPlantInServicePlantPurchasedOrSold Plant Purchased or Sold |
|||||||
|
6 |
UtilityPlantInServiceCompletedConstructionNotClassified Completed Construction not Classified |
|||||||
|
7 |
UtilityPlantInServiceExperimentalPlantUnclassified Experimental Plant Unclassified |
|||||||
|
8 |
UtilityPlantInServiceClassifiedAndUnclassified Total (3 thru 7) |
|
|
|||||
|
9 |
UtilityPlantLeasedToOthers Leased to Others |
|||||||
|
10 |
UtilityPlantHeldForFutureUse Held for Future Use |
|
|
|||||
|
11 |
ConstructionWorkInProgress Construction Work in Progress |
|
|
|||||
|
12 |
UtilityPlantAcquisitionAdjustment Acquisition Adjustments |
|
|
|||||
|
13 |
UtilityPlantAndConstructionWorkInProgress Total Utility Plant (8 thru 12) |
|
|
|||||
|
14 |
AccumulatedProvisionForDepreciationAmortizationAndDepletionOfPlantUtility Accumulated Provisions for Depreciation, Amortization, & Depletion |
|
|
|||||
|
15 |
UtilityPlantNet Net Utility Plant (13 less 14) |
|
|
|||||
|
16 |
DetailOfAccumulatedProvisionsForDepreciationAmortizationAndDepletionAbstract DETAIL OF ACCUMULATED PROVISIONS FOR DEPRECIATION, AMORTIZATION AND DEPLETION |
|||||||
|
17 |
AccumulatedProvisionForDepreciationAmortizationAndDepletionUtilityPlantInServiceAbstract In Service: |
|||||||
|
18 |
DepreciationUtilityPlantInService Depreciation |
|
|
|||||
|
19 |
AmortizationAndDepletionOfProducingNaturalGasLandAndLandRightsutilityPlantInService Amortization and Depletion of Producing Natural Gas Land and Land Rights |
|||||||
|
20 |
AmortizationOfUndergroundStorageLandAndLandRightsutilityPlantInService Amortization of Underground Storage Land and Land Rights |
|||||||
|
21 |
AmortizationOfOtherUtilityPlantUtilityPlantInService Amortization of Other Utility Plant |
|
|
|||||
|
22 |
DepreciationAmortizationAndDepletionUtilityPlantInService Total in Service (18 thru 21) |
|
|
|||||
|
23 |
DepreciationAmortizationAndDepletionUtilityPlantLeasedToOthersAbstract Leased to Others |
|||||||
|
24 |
DepreciationUtilityPlantLeasedToOthers Depreciation |
|||||||
|
25 |
AmortizationAndDepletionUtilityPlantLeasedToOthers Amortization and Depletion |
|||||||
|
26 |
DepreciationAmortizationAndDepletionUtilityPlantLeasedToOthers Total Leased to Others (24 & 25) |
|||||||
|
27 |
DepreciationAndAmortizationUtilityPlantHeldForFutureUseAbstract Held for Future Use |
|||||||
|
28 |
DepreciationUtilityPlantHeldForFutureUse Depreciation |
|||||||
|
29 |
AmortizationUtilityPlantHeldForFutureUse Amortization |
|||||||
|
30 |
DepreciationAndAmortizationUtilityPlantHeldForFutureUse Total Held for Future Use (28 & 29) |
|||||||
|
31 |
AbandonmentOfLeases Abandonment of Leases (Natural Gas) |
|||||||
|
32 |
AmortizationOfPlantAcquisitionAdjustment Amortization of Plant Acquisition Adjustment |
|
|
|||||
|
33 |
AccumulatedProvisionForDepreciationAmortizationAndDepletionOfPlantUtility Total Accum Prov (equals 14) (22,26,30,31,32) |
|
|
|||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
NUCLEAR FUEL MATERIALS (Account 120.1 through 120.6 and 157) |
||||||
|
||||||
| Line No. |
Description of item (a) |
Balance Beginning of Year (b) |
Changes during Year Additions (c) |
Changes during Year Amortization (d) |
Changes during Year Other Reductions (Explain in a footnote) (e) |
Balance End of Year (f) |
|
1 |
Nuclear Fuel in process of Refinement, Conv, Enrichment & Fab (120.1) |
|||||
|
2 |
Fabrication |
|
|
(b) |
|
|
|
3 |
Nuclear Materials |
|
|
(c) |
|
|
|
4 |
Allowance for Funds Used during Construction |
|
|
(d) |
|
|
|
5 |
(Other Overhead Construction Costs, provide details in footnote) |
|
|
(e) |
|
|
|
6 |
SUBTOTAL (Total 2 thru 5) |
|
|
|
||
|
7 |
Nuclear Fuel Materials and Assemblies |
|||||
|
8 |
In Stock (120.2) |
|
|
(f) |
|
|
|
9 |
In Reactor (120.3) |
|
|
(g) |
|
|
|
10 |
SUBTOTAL (Total 8 & 9) |
|
|
|||
|
11 |
Spent Nuclear Fuel (120.4) |
|
(h) |
|
||
|
12 |
Nuclear Fuel Under Capital Leases (120.6) |
|||||
|
13 |
(Less) Accum Prov for Amortization of Nuclear Fuel Assem (120.5) |
|
(a) |
|
||
|
14 |
TOTAL Nuclear Fuel Stock (Total 6, 10, 11, 12, less 13) |
|
|
|||
|
15 |
Estimated Net Salvage Value of Nuclear Materials in Line 9 |
|||||
|
16 |
Estimated Net Salvage Value of Nuclear Materials in Line 11 |
|||||
|
17 |
Est Net Salvage Value of Nuclear Materials in Chemical Processing |
|||||
|
18 |
Nuclear Materials held for Sale (157) |
|||||
|
19 |
Uranium |
|||||
|
20 |
Plutonium |
|||||
|
21 |
Other (Provide details in footnote) |
|||||
|
22 |
TOTAL Nuclear Materials held for Sale (Total 19, 20, and 21) |
|||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: AccumulatedProvisionForAmortizationOfNuclearFuelAssembliesAmortization | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (b) Concept: FabricationCostsNuclearFuelInProcessOfRefinementConversionEnrichmentAndFabricationOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (c) Concept: NuclearMaterialsNuclearFuelInProcessOfRefinementConversionEnrichmentAndFabricationOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (d) Concept: AllowanceForFundsConstructionNuclearFuelInProcessOfRefinementConversionEnrichmentAndFabricationOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (e) Concept: OtherOverheadConstructionCostsNuclearFuelInProcessOfRefinementConversionEnrichmentAndFabricationOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (f) Concept: NuclearFuelMaterialsAndAssembliesInStockOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (g) Concept: NuclearFuelAssembliesInReactorOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
| (h) Concept: SpentNuclearFuelOtherReductions | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ELECTRIC PLANT IN SERVICE (Account 101, 102, 103 and 106) |
|||||||
|
|||||||
| Line No. |
Account (a) |
Balance Beginning of Year (b) |
Additions (c) |
Retirements (d) |
Adjustments (e) |
Transfers (f) |
Balance at End of Year (g) |
|
1 |
1. INTANGIBLE PLANT |
||||||
|
2 |
(301) Organization |
|
|
||||
|
3 |
(302) Franchise and Consents |
|
|
||||
|
4 |
(303) Miscellaneous Intangible Plant |
|
|
|
|
||
|
5 |
TOTAL Intangible Plant (Enter Total of lines 2, 3, and 4) |
|
|
|
|
||
|
6 |
2. PRODUCTION PLANT |
||||||
|
7 |
A. Steam Production Plant |
||||||
|
8 |
(310) Land and Land Rights |
|
|
|
|||
|
9 |
(311) Structures and Improvements |
|
|
|
|
||
|
10 |
(312) Boiler Plant Equipment |
|
|
|
|
||
|
11 |
(313) Engines and Engine-Driven Generators |
||||||
|
12 |
(314) Turbogenerator Units |
|
|
|
|
||
|
13 |
(315) Accessory Electric Equipment |
|
|
|
|
||
|
14 |
(316) Misc. Power Plant Equipment |
|
|
|
|
||
|
15 |
(317) Asset Retirement Costs for Steam Production |
|
|
|
|
||
|
16 |
TOTAL Steam Production Plant (Enter Total of lines 8 thru 15) |
|
|
|
|
||
|
17 |
B. Nuclear Production Plant |
||||||
|
18 |
(320) Land and Land Rights |
|
|
|
|||
|
19 |
(321) Structures and Improvements |
|
|
|
|
||
|
20 |
(322) Reactor Plant Equipment |
|
|
|
|
||
|
21 |
(323) Turbogenerator Units |
|
|
|
|
||
|
22 |
(324) Accessory Electric Equipment |
|
|
|
|
||
|
23 |
(325) Misc. Power Plant Equipment |
|
|
|
|
||
|
24 |
(326) Asset Retirement Costs for Nuclear Production |
|
|
|
|
||
|
25 |
TOTAL Nuclear Production Plant (Enter Total of lines 18 thru 24) |
|
|
|
|
||
|
26 |
C. Hydraulic Production Plant |
||||||
|
27 |
(330) Land and Land Rights |
|
|
|
|
||
|
28 |
(331) Structures and Improvements |
|
|
|
|
||
|
29 |
(332) Reservoirs, Dams, and Waterways |
|
|
|
|
||
|
30 |
(333) Water Wheels, Turbines, and Generators |
|
|
|
|
||
|
31 |
(334) Accessory Electric Equipment |
|
|
|
|
||
|
32 |
(335) Misc. Power Plant Equipment |
|
|
|
|
||
|
33 |
(336) Roads, Railroads, and Bridges |
|
|
|
|
||
|
34 |
(337) Asset Retirement Costs for Hydraulic Production |
|
|
|
|||
|
35 |
TOTAL Hydraulic Production Plant (Enter Total of lines 27 thru 34) |
|
|
|
|
||
|
36 |
D. Other Production Plant |
||||||
|
37 |
(340) Land and Land Rights |
|
|
||||
|
38 |
(341) Structures and Improvements |
|
|
|
|
||
|
39 |
(342) Fuel Holders, Products, and Accessories |
|
|
|
|
||
|
40 |
(343) Prime Movers |
|
|
|
|
||
|
41 |
(344) Generators |
|
|
|
|
||
|
42 |
(345) Accessory Electric Equipment |
|
|
|
|
||
|
43 |
(346) Misc. Power Plant Equipment |
|
|
|
|
||
|
44 |
(347) Asset Retirement Costs for Other Production |
|
|
||||
|
44.1 |
(348) Energy Storage Equipment - Production |
||||||
|
45 |
TOTAL Other Prod. Plant (Enter Total of lines 37 thru 44) |
|
|
|
|
||
|
46 |
TOTAL Prod. Plant (Enter Total of lines 16, 25, 35, and 45) |
|
|
|
|
||
|
47 |
3. Transmission Plant |
||||||
|
48 |
(350) Land and Land Rights |
|
|
|
|
||
|
48.1 |
(351) Energy Storage Equipment - Transmission |
||||||
|
49 |
(352) Structures and Improvements |
|
|
|
|
||
|
50 |
(353) Station Equipment |
|
|
|
|
||
|
51 |
(354) Towers and Fixtures |
|
|
|
|
||
|
52 |
(355) Poles and Fixtures |
|
|
|
|
||
|
53 |
(356) Overhead Conductors and Devices |
|
|
|
|
||
|
54 |
(357) Underground Conduit |
|
|
||||
|
55 |
(358) Underground Conductors and Devices |
|
|
|
|
||
|
56 |
(359) Roads and Trails |
|
|
|
|
||
|
57 |
(359.1) Asset Retirement Costs for Transmission Plant |
|
|
|
|||
|
58 |
TOTAL Transmission Plant (Enter Total of lines 48 thru 57) |
|
|
|
|
||
|
59 |
4. Distribution Plant |
||||||
|
60 |
(360) Land and Land Rights |
|
|
|
|
||
|
61 |
(361) Structures and Improvements |
|
|
|
|
||
|
62 |
(362) Station Equipment |
|
|
|
|
||
|
63 |
(363) Energy Storage Equipment – Distribution |
||||||
|
64 |
(364) Poles, Towers, and Fixtures |
|
|
|
|
||
|
65 |
(365) Overhead Conductors and Devices |
|
|
|
|
||
|
66 |
(366) Underground Conduit |
|
|
|
|
||
|
67 |
(367) Underground Conductors and Devices |
|
|
|
|
||
|
68 |
(368) Line Transformers |
|
|
|
|
||
|
69 |
(369) Services |
|
|
|
|
||
|
70 |
(370) Meters |
|
|
|
|
||
|
71 |
(371) Installations on Customer Premises |
|
|
|
|
||
|
72 |
(372) Leased Property on Customer Premises |
|
|
||||
|
73 |
(373) Street Lighting and Signal Systems |
|
|
|
|
||
|
74 |
(374) Asset Retirement Costs for Distribution Plant |
|
|
|
|||
|
75 |
TOTAL Distribution Plant (Enter Total of lines 60 thru 74) |
|
|
|
|
||
|
76 |
5. REGIONAL TRANSMISSION AND MARKET OPERATION PLANT |
||||||
|
77 |
(380) Land and Land Rights |
||||||
|
78 |
(381) Structures and Improvements |
||||||
|
79 |
(382) Computer Hardware |
||||||
|
80 |
(383) Computer Software |
||||||
|
81 |
(384) Communication Equipment |
||||||
|
82 |
(385) Miscellaneous Regional Transmission and Market Operation Plant |
||||||
|
83 |
(386) Asset Retirement Costs for Regional Transmission and Market Oper |
||||||
|
84 |
TOTAL Transmission and Market Operation Plant (Total lines 77 thru 83) |
||||||
|
85 |
6. General Plant |
||||||
|
86 |
(389) Land and Land Rights |
|
|
|
|
||
|
87 |
(390) Structures and Improvements |
|
|
|
|
||
|
88 |
(391) Office Furniture and Equipment |
|
|
|
|
||
|
89 |
(392) Transportation Equipment |
|
|
|
|
||
|
90 |
(393) Stores Equipment |
|
|
|
|||
|
91 |
(394) Tools, Shop and Garage Equipment |
|
|
|
|
||
|
92 |
(395) Laboratory Equipment |
|
|
|
|||
|
93 |
(396) Power Operated Equipment |
|
|
|
|
||
|
94 |
(397) Communication Equipment |
|
|
|
|
||
|
95 |
(398) Miscellaneous Equipment |
|
|
|
|
||
|
96 |
SUBTOTAL (Enter Total of lines 86 thru 95) |
|
|
|
|
||
|
97 |
(399) Other Tangible Property |
||||||
|
98 |
(399.1) Asset Retirement Costs for General Plant |
|
|
|
|||
|
99 |
TOTAL General Plant (Enter Total of lines 96, 97, and 98) |
|
|
|
|
||
|
100 |
TOTAL (Accounts 101 and 106) |
|
|
|
|
||
|
101 |
(102) Electric Plant Purchased (See Instr. 8) |
||||||
|
102 |
(Less) (102) Electric Plant Sold (See Instr. 8) |
||||||
|
103 |
(103) Experimental Plant Unclassified |
||||||
|
104 |
TOTAL Electric Plant in Service (Enter Total of lines 100 thru 103) |
|
|
|
(a) |
||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: ElectricPlantInService | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Plant-in-service balances include the following lease balances:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ELECTRIC PLANT LEASED TO OTHERS (Account 104) |
||||||
| Line No. |
LesseeName Name of Lessee (a) |
IndicationOfAssociatedCompany * (Designation of Associated Company) (b) |
LeaseDescription Description of Property Leased (c) |
CommissionAuthorization Commission Authorization (d) |
ExpirationDateOfLease Expiration Date of Lease (e) |
ElectricPlantLeasedToOthers Balance at End of Year (f) |
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 | ||||||
| 29 | ||||||
| 30 | ||||||
| 31 | ||||||
| 32 | ||||||
| 33 | ||||||
| 34 | ||||||
| 35 | ||||||
| 36 | ||||||
| 37 | ||||||
| 38 | ||||||
| 39 | ||||||
| 40 | ||||||
| 41 | ||||||
| 42 | ||||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | ||||||
| 47 |
TOTAL |
|||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ELECTRIC PLANT HELD FOR FUTURE USE (Account 105) |
|||||||||
|
|||||||||
| Line No. |
ElectricPlantHeldForFutureUseDescription Description and Location of Property (a) |
ElectricPlantPropertyClassifiedAsHeldForFutureUseOriginalDate Date Originally Included in This Account (b) |
ElectricPlantPropertyClassifiedAsHeldForFutureUseExpectedUseInServiceDate Date Expected to be used in Utility Service (c) |
ElectricPlantHeldForFutureUse Balance at End of Year (d) |
|||||
| 1 | Land and Rights: | ||||||||
| 2 |
|
|
|
|
|||||
| 3 |
|
|
|
|
|||||
| 4 |
|
|
|
|
|||||
| 5 |
|
|
|
|
|||||
| 6 |
|
|
|
|
|||||
| 7 |
|
|
|
|
|||||
| 8 |
|
|
|
|
|||||
| 9 |
|
|
(a) |
|
|||||
| 10 |
|
|
|
|
|||||
| 11 |
|
|
|
|
|||||
| 12 |
|
|
|
|
|||||
| 13 |
|
|
|
|
|||||
| 14 |
|
|
|
|
|||||
| 15 |
|
|
|
|
|||||
| 16 |
|
|
|
|
|||||
| 17 |
|
|
|
|
|||||
| 18 |
|
|
|
|
|||||
| 21 | Other Property: | ||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 | |||||||||
| 26 | |||||||||
| 27 | |||||||||
| 28 | |||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | |||||||||
| 37 | |||||||||
| 38 | |||||||||
| 39 | |||||||||
| 40 | |||||||||
| 41 | |||||||||
| 42 | |||||||||
| 43 | |||||||||
| 44 | |||||||||
| 45 | |||||||||
| 46 | |||||||||
| 47 | TOTAL |
|
|||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: ElectricPlantPropertyClassifiedAsHeldForFutureUseExpectedUseInServiceDate |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
CONSTRUCTION WORK IN PROGRESS - - ELECTRIC (Account 107) |
||
|
||
| Line No. |
ConstructionWorkInProgressProjectDescription Description of Project (a) |
ConstructionWorkInProgress Construction work in progress - Electric (Account 107) (b) |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | ||
| 27 | ||
| 28 | ||
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
| 33 | ||
| 34 | ||
| 35 | ||
| 36 | ||
| 37 | ||
| 38 | ||
| 39 | ||
| 40 | ||
| 41 | ||
| 42 | ||
| 43 | ||
| 44 | ||
| 45 | ||
| 46 | ||
| 47 | ||
| 48 | ||
| 49 | ||
| 50 | ||
| 51 | ||
| 52 | ||
| 53 | ||
| 54 | ||
| 55 | ||
| 56 | ||
| 57 | ||
| 58 | ||
| 59 | ||
| 60 | ||
| 61 | ||
| 62 | ||
| 63 | ||
| 64 | ||
| 65 | ||
| 66 | ||
| 67 | ||
| 68 | ||
| 69 | ||
| 70 | ||
| 71 | ||
| 43 |
Total |
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ACCUMULATED PROVISION FOR DEPRECIATION OF ELECTRIC UTILITY PLANT (Account 108) |
|||||
|
|||||
| Line No. |
Item (a) |
Total (c + d + e) (b) |
Electric Plant in Service (c) |
Electric Plant Held for Future Use (d) |
Electric Plant Leased To Others (e) |
| Section A. Balances and Changes During Year | |||||
| 1 |
AccumulatedProvisionForDepreciationOfElectricUtilityPlant
Balance Beginning of Year |
|
|
||
| 2 |
Depreciation Provisions for Year, Charged to |
||||
|
3 |
DepreciationExpenseExcludingAdjustments (403) Depreciation Expense |
|
|
||
|
4 |
DepreciationExpenseForAssetRetirementCosts (403.1) Depreciation Expense for Asset Retirement Costs |
|
|
||
|
5 |
ExpensesOfElectricPlantLeasedToOthers (413) Exp. of Elec. Plt. Leas. to Others |
||||
|
6 |
TransportationExpensesClearing Transportation Expenses-Clearing |
|
|
||
|
7 |
OtherClearingAccounts Other Clearing Accounts |
|
|
||
|
8 |
OtherAccounts Other Accounts (Specify, details in footnote): |
||||
| 9.1 | (a) |
||||
| 10 |
DepreciationProvision
TOTAL Deprec. Prov for Year (Enter Total of lines 3 thru 9) |
|
|
||
| 11 |
Net Charges for Plant Retired: |
||||
|
12 |
BookCostOfRetiredPlant Book Cost of Plant Retired |
|
(b) |
||
|
13 |
CostOfRemovalOfPlant Cost of Removal |
|
|
||
|
14 |
SalvageValueOfRetiredPlant Salvage (Credit) |
|
|
||
|
15 |
NetChargesForRetiredPlant TOTAL Net Chrgs. for Plant Ret. (Enter Total of lines 12 thru 14) |
|
|
||
| 16 |
OtherAdjustmentsToAccumulatedDepreciation
Other Debit or Cr. Items (Describe, details in footnote): |
||||
| 17.1 | (c) |
||||
| 18 |
BookCostOfAssetRetirementCosts
Book Cost or Asset Retirement Costs Retired |
||||
| 19 |
AccumulatedProvisionForDepreciationOfElectricUtilityPlant
Balance End of Year (Enter Totals of lines 1, 10, 15, 16, and 18) |
(d) |
(e) |
||
| Section B. Balances at End of Year According to Functional Classification | |||||
|
20 |
AccumulatedDepreciationSteamProduction Steam Production |
|
|
||
|
21 |
AccumulatedDepreciationNuclearProduction Nuclear Production |
|
|
||
|
22 |
AccumulatedDepreciationHydraulicProductionConventional Hydraulic Production-Conventional |
|
|
||
|
23 |
AccumulatedDepreciationHydraulicProductionPumpedStorage Hydraulic Production-Pumped Storage |
|
|
||
|
24 |
AccumulatedDepreciationOtherProduction Other Production |
|
|
||
|
25 |
AccumulatedDepreciationTransmission Transmission |
|
|
||
|
26 |
AccumulatedDepreciationDistribution Distribution |
|
|
||
|
27 |
AccumulatedDepreciationRegionalTransmissionAndMarketOperation Regional Transmission and Market Operation |
||||
|
28 |
AccumulatedDepreciationGeneral General |
|
|
||
| 29 |
AccumulatedProvisionForDepreciationOfElectricUtilityPlant
TOTAL (Enter Total of lines 20 thru 28) |
(f) |
(g) |
||
| FOOTNOTE DATA |
| (a) Concept: OtherAccounts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Reflects provision of Account 108 related to capital/operating leases not recorded to Account 403
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: BookCostOfRetiredPlant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Variance between Schedule Page 204-207 Line No.:100 Column: d and Schedule Page 219 Line No.: 12 Column: c is due to the exclusion of intangible plant retirements on Page 219 for $2,401,360.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: OtherAdjustmentsToAccumulatedDepreciation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Reflects retired plant net book values moved to FERC 182 Deferred Debits and gain/loss resulting from retirements of operating leases.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: AccumulatedProvisionForDepreciationOfElectricUtilityPlant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accumulated depreciation balances include the following lease balances:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (e) Concept: AccumulatedProvisionForDepreciationOfElectricUtilityPlant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accumulated depreciation balances include the following lease balances:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (f) Concept: AccumulatedProvisionForDepreciationOfElectricUtilityPlant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accumulated depreciation balances include the following lease balances:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (g) Concept: AccumulatedProvisionForDepreciationOfElectricUtilityPlant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accumulated depreciation balances include the following lease balances:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
INVESTMENTS IN SUBSIDIARY COMPANIES (Account 123.1) |
||||||||
|
||||||||
| Line No. |
DescriptionOfInvestmentsInSubsidiaryCompanies Description of Investment (a) |
DateOfAcquisitionInvestmentsInSubsidiaryCompanies Date Acquired (b) |
DateOfMaturityInvestmentsInSubsidiaryCompanies Date of Maturity (c) |
InvestmentInSubsidiaryCompanies Amount of Investment at Beginning of Year (d) |
EquityInEarningsOfSubsidiaryCompanies Equity in Subsidiary Earnings of Year (e) |
InterestAndDividendRevenueFromInvestments Revenues for Year (f) |
InvestmentInSubsidiaryCompanies Amount of Investment at End of Year (g) |
InvestmentGainLossOnDisplosal Gain or Loss from Investment Disposed of (h) |
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 42 |
Total Cost of Account 123.1 $ |
Total |
|
|
|
|
||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
MATERIALS AND SUPPLIES |
||||
|
||||
| Line No. |
Account (a) |
Balance Beginning of Year (b) |
Balance End of Year (c) |
Department or Departments which Use Material (d) |
| 1 |
Fuel Stock (Account 151) |
|
|
|
| 2 |
Fuel Stock Expenses Undistributed (Account 152) |
|
|
|
| 3 |
Residuals and Extracted Products (Account 153) |
|||
| 4 |
Plant Materials and Operating Supplies (Account 154) |
|||
| 5 |
Assigned to - Construction (Estimated) |
|||
| 6 |
Assigned to - Operations and Maintenance |
|||
| 7 |
Production Plant (Estimated) |
|
|
|
| 8 |
Transmission Plant (Estimated) |
|
|
|
| 9 |
Distribution Plant (Estimated) |
|
|
|
| 10 |
Regional Transmission and Market Operation Plant (Estimated) |
|||
| 11 |
Assigned to - Other (provide details in footnote) |
(a) |
(b) |
|
| 12 |
TOTAL Account 154 (Enter Total of lines 5 thru 11) |
|
|
|
| 13 |
Merchandise (Account 155) |
|||
| 14 |
Other Materials and Supplies (Account 156) |
|
|
|
| 15 |
Nuclear Materials Held for Sale (Account 157) (Not
applic to Gas Util) |
|||
| 16 |
Stores Expense Undistributed (Account 163) |
|
|
|
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 |
TOTAL Materials and Supplies |
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: PlantMaterialsAndOperatingSuppliesOther | ||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: PlantMaterialsAndOperatingSuppliesOther | ||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Allowances (Accounts 158.1 and 158.2) |
|||||||||||||
|
|||||||||||||
| Current Year | Year One | Year Two | Year Three | Future Years | Totals | ||||||||
| Line No. |
SO2 Allowances Inventory (Account 158.1) (a) |
No. (b) |
Amt. (c) |
No. (d) |
Amt. (e) |
No. (f) |
Amt. (g) |
No. (h) |
Amt. (i) |
No. (j) |
Amt. (k) |
No. (l) |
Amt. (m) |
1 |
Balance-Beginning of Year |
||||||||||||
2 |
|||||||||||||
3 |
Acquired During Year: |
||||||||||||
4 |
Issued (Less Withheld Allow) |
||||||||||||
5 |
Returned by EPA |
||||||||||||
6 |
|||||||||||||
7 |
|||||||||||||
8 |
|||||||||||||
9 |
|||||||||||||
10 |
|||||||||||||
11 |
|||||||||||||
12 |
|||||||||||||
13 |
|||||||||||||
14 |
|||||||||||||
15 |
Total |
||||||||||||
16 |
|||||||||||||
17 |
Relinquished During Year: |
||||||||||||
18 |
Charges to Account 509 |
||||||||||||
19 |
Other: |
||||||||||||
20 |
Allowances Used |
||||||||||||
20.1 |
|||||||||||||
21 |
Cost of Sales/Transfers: |
||||||||||||
22 |
|||||||||||||
23 |
|||||||||||||
24 |
|||||||||||||
25 |
|||||||||||||
26 |
|||||||||||||
27 |
|||||||||||||
28 |
Total |
||||||||||||
29 |
Balance-End of Year |
||||||||||||
30 |
|||||||||||||
31 |
Sales: |
||||||||||||
32 |
Net Sales Proceeds(Assoc. Co.) |
||||||||||||
33 |
Net Sales Proceeds (Other) |
||||||||||||
34 |
Gains |
||||||||||||
35 |
Losses |
||||||||||||
Allowances Withheld (Acct 158.2) |
|||||||||||||
36 |
Balance-Beginning of Year |
||||||||||||
37 |
Add: Withheld by EPA |
||||||||||||
38 |
Deduct: Returned by EPA |
||||||||||||
39 |
Cost of Sales |
||||||||||||
40 |
Balance-End of Year |
||||||||||||
41 |
|||||||||||||
42 |
Sales |
||||||||||||
43 |
Net Sales Proceeds (Assoc. Co.) |
||||||||||||
44 |
Net Sales Proceeds (Other) |
||||||||||||
45 |
Gains |
||||||||||||
46 |
Losses |
||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Allowances (Accounts 158.1 and 158.2) |
|||||||||||||
|
|||||||||||||
| Current Year | Year One | Year Two | Year Three | Future Years | Totals | ||||||||
| Line No. |
NOx Allowances Inventory (Account 158.1) (a) |
No. (b) |
Amt. (c) |
No. (d) |
Amt. (e) |
No. (f) |
Amt. (g) |
No. (h) |
Amt. (i) |
No. (j) |
Amt. (k) |
No. (l) |
Amt. (m) |
1 |
Balance-Beginning of Year |
||||||||||||
2 |
|||||||||||||
3 |
Acquired During Year: |
||||||||||||
4 |
Issued (Less Withheld Allow) |
||||||||||||
5 |
Returned by EPA |
||||||||||||
6 |
|||||||||||||
7 |
|||||||||||||
8 |
|||||||||||||
9 |
|||||||||||||
10 |
|||||||||||||
11 |
|||||||||||||
12 |
|||||||||||||
13 |
|||||||||||||
14 |
|||||||||||||
15 |
Total |
||||||||||||
16 |
|||||||||||||
17 |
Relinquished During Year: |
||||||||||||
18 |
Charges to Account 509 |
||||||||||||
19 |
Other: |
||||||||||||
20 |
Allowances Used |
||||||||||||
20.1 |
|||||||||||||
21 |
Cost of Sales/Transfers: |
||||||||||||
22 |
|||||||||||||
23 |
|||||||||||||
24 |
|||||||||||||
25 |
|||||||||||||
26 |
|||||||||||||
27 |
|||||||||||||
28 |
Total |
||||||||||||
29 |
Balance-End of Year |
||||||||||||
30 |
|||||||||||||
31 |
Sales: |
||||||||||||
32 |
Net Sales Proceeds(Assoc. Co.) |
||||||||||||
33 |
Net Sales Proceeds (Other) |
||||||||||||
34 |
Gains |
||||||||||||
35 |
Losses |
||||||||||||
Allowances Withheld (Acct 158.2) |
|||||||||||||
36 |
Balance-Beginning of Year |
||||||||||||
37 |
Add: Withheld by EPA |
||||||||||||
38 |
Deduct: Returned by EPA |
||||||||||||
39 |
Cost of Sales |
||||||||||||
40 |
Balance-End of Year |
||||||||||||
41 |
|||||||||||||
42 |
Sales |
||||||||||||
43 |
Net Sales Proceeds (Assoc. Co.) |
||||||||||||
44 |
Net Sales Proceeds (Other) |
||||||||||||
45 |
Gains |
||||||||||||
46 |
Losses |
||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
EXTRAORDINARY PROPERTY LOSSES (Account 182.1) |
||||||
| WRITTEN OFF DURING YEAR | ||||||
| Line No. |
DescriptionOfExtraordinaryPropertyLoss Description of Extraordinary Loss [Include in the description the date of Commission Authorization to use Acc 182.1 and period of amortization (mo, yr to mo, yr).] (a) |
ExtraordinaryPropertyLossesNotYetRecognized Total Amount of Loss (b) |
ExtraordinaryPropertyLossesRecognized Losses Recognized During Year (c) |
ExtraordinaryPropertyLossesWrittenOffAccountCharged Account Charged (d) |
ExtraordinaryPropertyLossesWrittenOff Amount (e) |
ExtraordinaryPropertyLosses Balance at End of Year (f) |
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 | ||||||
| 20 | TOTAL | |||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
UNRECOVERED PLANT AND REGULATORY STUDY COSTS (182.2) |
||||||
| WRITTEN OFF DURING YEAR | ||||||
| Line No. |
DescriptionOfUnrecoveredPlantAndRegulatoryStudyCosts Description of Unrecovered Plant and Regulatory Study Costs [Include in the description of costs, the date of COmmission Authorization to use Acc 182.2 and period of amortization (mo, yr to mo, yr)] (a) |
UnrecoveredPlantAndRegulatoryStudyCostsNotYetRecognized Total Amount of Charges (b) |
UnrecoveredPlantAndRegulatoryStudyCostsRecognized Costs Recognized During Year (c) |
UnrecoveredPlantAndRegulatoryStudyCostsWrittenOffAccountCharged Account Charged (d) |
UnrecoveredPlantAndRegulatoryStudyCostsWrittenOff Amount (e) |
UnrecoveredPlantAndRegulatoryStudyCosts Balance at End of Year (f) |
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 | ||||||
| 29 | ||||||
| 30 | ||||||
| 31 | ||||||
| 32 | ||||||
| 33 | ||||||
| 34 | ||||||
| 35 | ||||||
| 36 | ||||||
| 37 | ||||||
| 38 | ||||||
| 39 | ||||||
| 40 | ||||||
| 41 | ||||||
| 42 | ||||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | ||||||
| 47 | ||||||
| 48 | ||||||
| 49 |
TOTAL |
|||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Transmission Service and Generation Interconnection Study Costs |
|||||
|
|||||
| Line No. |
DescriptionOfStudyPerformed Description (a) |
StudyCostsIncurred Costs Incurred During Period (b) |
StudyCostsAccountCharged Account Charged (c) |
StudyCostsReimbursements Reimbursements Received During the Period (d) |
StudyCostsAccountReimbursed Account Credited With Reimbursement (e) |
| 1 |
Transmission Studies |
||||
| 2 | (a) |
||||
| 20 |
Total |
||||
| 21 |
Generation Studies |
||||
| 22 | (b) |
||||
| 39 |
Total |
||||
| 40 | Grand Total | ||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DescriptionOfStudyPerformed |
Southern Company Services receives up-front payments for studies and operating companies do not record any charges to these accounts. Costs are bore at system level. The only time an operating company would have anything to report on page 231 is when the charges exceed the amount collected and the customer does not reimburse Southern Company. Any study completed by an operating company and is under the OATT should be reported by that operating company on page 231.
|
| (b) Concept: DescriptionOfStudyPerformed |
Southern Company Services receives up-front payments for studies and operating companies do not record any charges to these accounts. Costs are bore at system level. The only time an operating company would have anything to report on page 231 is when the charges exceed the amount collected and the customer does not reimburse Southern Company. Any study completed by an operating company and is under the OATT should be reported by that operating company on page 231.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
OTHER REGULATORY ASSETS (Account 182.3) |
||||||
|
||||||
| CREDITS | ||||||
| Line No. |
DescriptionAndPurposeOfOtherRegulatoryAssets Description and Purpose of Other Regulatory Assets (a) |
OtherRegulatoryAssets Balance at Beginning of Current Quarter/Year (b) |
IncreaseDecreaseInOtherRegulatoryAssets Debits (c) |
OtherRegulatoryAssetsWrittenOffAccountCharged Written off During Quarter/Year Account Charged (d) |
OtherRegulatoryAssetsWrittenOffRecovered Written off During the Period Amount (e) |
OtherRegulatoryAssets Balance at end of Current Quarter/Year (f) |
| 1 | (a) |
|||||
| 2 | (b) |
|||||
| 3 | (c) |
|||||
| 4 | (d) |
|||||
| 5 | (e) |
|||||
| 6 | (f) |
|||||
| 7 | (g) |
|||||
| 8 | (h) |
|||||
| 9 | (i) |
|||||
| 10 | (j) |
|||||
| 11 | (k) |
|||||
| 12 | (l) |
|||||
| 13 | (m) |
|||||
| 14 | (n) |
|||||
| 15 | (o) |
|||||
| 16 | (p) |
|||||
| 17 | (q) |
|||||
| 44 |
TOTAL |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (e) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (f) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (g) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (h) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (i) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (j) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (k) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (l) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (m) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (n) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (o) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (p) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (q) Concept: DescriptionAndPurposeOfOtherRegulatoryAssets | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
MISCELLANEOUS DEFFERED DEBITS (Account 186) |
||||||
|
||||||
| CREDITS | ||||||
| Line No. |
Description of Miscellaneous Deferred Debits (a) |
Balance at Beginning of Year (b) |
Debits (c) |
Credits Account Charged (d) |
Credits Amount (e) |
Balance at End of Year (f) |
| 1 |
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
| 3 |
|
|
|
|||
| 4 |
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
| 6 |
(a) |
|
|
|
|
|
| 7 |
|
|
|
|
|
|
| 8 |
|
|
|
|
|
|
| 9 |
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
| 11 |
|
|
|
|
|
|
| 12 |
(b) |
|
|
|
|
|
| 13 |
(c) |
|
|
|
|
|
| 14 |
|
|
|
|||
| 15 |
|
|
|
|
||
| 16 |
(d) |
|
|
|
|
|
| 17 |
|
|||||
| 47 |
Miscellaneous Work in Progress |
|||||
| 48 |
Deferred Regulatory Comm. Expenses (See pages 350 - 351) |
|||||
| 49 |
TOTAL |
|
|
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DescriptionOfMiscellaneousDeferredDebits |
| (b) Concept: DescriptionOfMiscellaneousDeferredDebits |
| (c) Concept: DescriptionOfMiscellaneousDeferredDebits |
| (d) Concept: DescriptionOfMiscellaneousDeferredDebits |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ACCUMULATED DEFERRED INCOME TAXES (Account 190) |
|||
|
|||
| Line No. |
DescriptionOfAccumulatedDeferredIncomeTax Description and Location (a) |
AccumulatedDeferredIncomeTaxes Balance at Beginning of Year (b) |
AccumulatedDeferredIncomeTaxes Balance at End of Year (c) |
| 1 |
Electric |
||
| 2 |
|
|
|
| 7 |
Other |
||
| 8 |
TOTAL Electric (Enter Total of lines 2 thru 7) |
|
|
| 9 |
Gas |
||
| 15 |
Other |
||
| 16 |
TOTAL Gas (Enter Total of lines 10 thru 15) |
||
|
17.1 |
|
|
|
| 17 |
Other (Specify) |
||
| 18 |
TOTAL (Acct 190) (Total of lines 8, 16 and 17) |
(a) |
|
| Notes |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: AccumulatedDeferredIncomeTaxes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
CAPITAL STOCKS (Account 201 and 204) |
||||||||||
|
||||||||||
| Line No. |
Class and Series of Stock and Name of Stock Series (a) |
Number of Shares Authorized by Charter (b) |
Par or Stated Value per Share (c) |
Call Price at End of Year (d) |
Outstanding per Bal. Sheet (Total amount outstanding without reduction for amounts held by respondent) Shares (e) |
Outstanding per Bal. Sheet (Total amount outstanding without reduction for amounts held by respondent) Amount (f) |
Held by Respondent As Reacquired Stock (Acct 217) Shares (g) |
Held by Respondent As Reacquired Stock (Acct 217) Cost (h) |
Held by Respondent In Sinking and Other Funds Shares (i) |
Held by Respondent In Sinking and Other Funds Amount (j) |
| 1 |
Common Stock (Account 201) |
|||||||||
| 2 |
|
|
|
|
||||||
|
6 |
Total |
|
|
|
||||||
|
7 |
Preferred Stock (Account 204) |
|||||||||
| 8 |
|
|
|
|||||||
| 9 |
|
|
|
|||||||
| 10 |
|
|
|
|||||||
|
20 |
Total |
|
||||||||
| 1 |
Capital Stock (Accounts 201 and 204) - Data Conversion |
|||||||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
|
5 |
Total |
|||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Other Paid-in Capital |
||||||||||||
|
1. Report below the balance at the end of the year and the information specified below for the respective other paid-in capital accounts. Provide a subheading for each account and show a total for the account, as well as a total of all accounts for reconciliation with the balance sheet, page 112. Explain changes made in any account during the year and give the accounting entries effecting such change.
|
||||||||||||
| Line No. |
Item (a) |
Amount (b) |
||||||||||
|
1 |
DonationsReceivedFromStockholdersAbstract Donations Received from Stockholders (Account 208) |
|||||||||||
|
2 |
DonationsReceivedFromStockholders Beginning Balance Amount |
|||||||||||
|
3.1 |
IncreasesDecreasesFromSalesOfDonationsReceivedFromStockholders |
|||||||||||
|
4 |
DonationsReceivedFromStockholders Ending Balance Amount |
|||||||||||
|
5 |
ReductionInParOrStatedValueOfCapitalStockAbstract Reduction in Par or Stated Value of Capital Stock (Account 209) |
|||||||||||
|
6 |
ReductionInParOrStatedValueOfCapitalStock Beginning Balance Amount |
|||||||||||
|
7.1 |
IncreasesDecreasesDueToReductionsInParOrStatedValueOfCapitalStock |
|||||||||||
|
8 |
ReductionInParOrStatedValueOfCapitalStock Ending Balance Amount |
|||||||||||
|
9 |
GainOrResaleOrCancellationOfReacquiredCapitalStockAbstract Gain or Resale or Cancellation of Reacquired Capital Stock (Account 210) |
|||||||||||
|
10 |
GainOnResaleOrCancellationOfReacquiredCapitalStock Beginning Balance Amount |
|||||||||||
|
11.1 |
IncreasesDecreasesFromGainOrResaleOrCancellationOfReacquiredCapitalStock |
|||||||||||
|
12 |
GainOnResaleOrCancellationOfReacquiredCapitalStock Ending Balance Amount |
|||||||||||
|
13 |
MiscellaneousPaidInCapitalAbstract Miscellaneous Paid-In Capital (Account 211) |
|||||||||||
|
14 |
MiscellaneousPaidInCapital Beginning Balance Amount |
|
||||||||||
|
15.1 |
IncreasesDecreasesDueToMiscellaneousPaidInCapital |
|||||||||||
|
15.2 |
IncreasesDecreasesDueToMiscellaneousPaidInCapital |
|
||||||||||
|
15.3 |
IncreasesDecreasesDueToMiscellaneousPaidInCapital |
|
||||||||||
|
16 |
MiscellaneousPaidInCapital Ending Balance Amount |
|
||||||||||
|
17 |
OtherPaidInCapitalAbstract Historical Data - Other Paid in Capital |
|||||||||||
|
18 |
OtherPaidInCapitalDetail Beginning Balance Amount |
|||||||||||
|
19.1 |
IncreasesDecreasesInOtherPaidInCapital |
|||||||||||
|
20 |
OtherPaidInCapitalDetail Ending Balance Amount |
|||||||||||
|
40 |
OtherPaidInCapital Total |
|
||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
CAPITAL STOCK EXPENSE (Account 214) |
||
|
||
| Line No. |
NameOfClassAndSeriesOfStock Class and Series of Stock (a) |
CapitalStockExpense Balance at End of Year (b) |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 |
TOTAL |
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
LONG-TERM DEBT (Account 221, 222, 223 and 224) |
|||||||||||||
|
|||||||||||||
| Line No. |
ClassAndSeriesOfObligationCouponRateDescription Class and Series of Obligation, Coupon Rate (For new issue, give commission Authorization numbers and dates) (a) |
RelatedAccountNumber Related Account Number (b) |
Principal Amount of Debt Issued (c) |
LongTermDebtIssuanceExpensePremiumOrDiscount Total Expense, Premium or Discount (d) |
LongTermDebtIssuanceExpenses Total Expense (e) |
LongTermDebtPremium Total Premium (f) |
LongTermDebtDiscount Total Discount (g) |
NominalDateOfIssue Nominal Date of Issue (h) |
DateOfMaturity Date of Maturity (i) |
AmortizationPeriodStartDate AMORTIZATION PERIOD Date From (j) |
AmortizationPeriodEndDate AMORTIZATION PERIOD Date To (k) |
Outstanding (Total amount outstanding without reduction for amounts held by respondent) (l) |
Interest for Year Amount (m) |
| 1 |
Bonds (Account 221) |
||||||||||||
| 2 | |||||||||||||
|
3 |
Subtotal |
|
|
||||||||||
4 |
Reacquired Bonds (Account 222) |
||||||||||||
| 5 | |||||||||||||
|
6 |
Subtotal |
|
|
||||||||||
7 |
Advances from Associated Companies (Account 223) |
||||||||||||
| 8 | |||||||||||||
| 9 | |||||||||||||
| 10 | |||||||||||||
|
11 |
Subtotal | ||||||||||||
12 |
Other Long Term Debt (Account 224) |
||||||||||||
| 13 | (b) |
||||||||||||
| 14 | |||||||||||||
| 15 | (e) |
||||||||||||
| 16 | |||||||||||||
| 17 | |||||||||||||
| 18 | |||||||||||||
| 19 | |||||||||||||
| 20 | |||||||||||||
| 21 | |||||||||||||
| 22 | |||||||||||||
| 23 | |||||||||||||
| 24 | |||||||||||||
| 25 | |||||||||||||
| 26 | |||||||||||||
| 27 | |||||||||||||
| 28 | |||||||||||||
| 29 | |||||||||||||
| 30 | |||||||||||||
| 31 | |||||||||||||
| 32 | |||||||||||||
| 33 | |||||||||||||
| 34 | |||||||||||||
| 35 | |||||||||||||
| 36 | |||||||||||||
| 37 | |||||||||||||
| 38 | |||||||||||||
| 39 | |||||||||||||
| 40 | |||||||||||||
| 41 | |||||||||||||
| 42 | |||||||||||||
| 43 | |||||||||||||
| 44 | |||||||||||||
| 45 | |||||||||||||
| 46 | |||||||||||||
| 47 | |||||||||||||
| 48 | |||||||||||||
| 49 | (c) |
||||||||||||
| 50 | |||||||||||||
| 51 | |||||||||||||
| 52 | |||||||||||||
| 53 | |||||||||||||
| 54 | |||||||||||||
| 55 | |||||||||||||
| 56 | |||||||||||||
| 57 | |||||||||||||
| 58 | |||||||||||||
| 59 | |||||||||||||
| 60 | |||||||||||||
| 61 | |||||||||||||
| 62 | |||||||||||||
| 63 | |||||||||||||
| 64 | |||||||||||||
| 65 | |||||||||||||
| 66 | |||||||||||||
| 67 | |||||||||||||
| 68 | |||||||||||||
| 69 | |||||||||||||
| 70 | (a) |
(d) |
|||||||||||
| 71 | |||||||||||||
| 72 | |||||||||||||
| 73 | |||||||||||||
| 74 | |||||||||||||
| 75 | |||||||||||||
| 76 | |||||||||||||
| 77 | |||||||||||||
| 78 | |||||||||||||
| 79 | |||||||||||||
| 80 | |||||||||||||
| 81 | |||||||||||||
| 82 | |||||||||||||
| 83 | |||||||||||||
|
84 |
Subtotal |
|
|
|
|
|
|
||||||
| 33 | TOTAL |
|
|
|
|||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: ClassAndSeriesOfObligationCouponRateDescription | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
In 2023, the following DOE Loan principal payments were made:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: OtherLongTermDebtPrincipalAmountIssued | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
In 2023, the following Senior Notes were issued:
May 2023 - Series 2023A- 4.65% - $750,000,000 - due May 2028
May 2023 - Series 2023B- 4.95% - $1,000,000,000 - due May 2033
November 2023 - Series 2023C- Variable - $700,000,000 - due May 2025
In 2023, the following Senior Notes matured:
April 2023 - Series N- 5.75% - $100,000,000 - due April 2023
July 2023 - Series 2020A- 2.10% - $700,000,000 - due July 2023
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: OtherLongTermDebtPrincipalAmountIssued | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The following PCBs were reoffered to the public in February 2023:
Monroe 2nd Series 2006 $28,065,000
Monroe 2nd Series 2009 $89,200,000
Monroe 1st Series 2012 $48,720,000
Monroe 1st Series 2013 $17,500,000
Burke 1st Series 1996 $46,000,000
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: OtherLongTermDebtIssuanceExpense | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The $65,433,621 and $12,185,988 in issuance expenses on lines 70 and 79, respectively, are related to all DOE Loan draws.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (e) Concept: InterestExpenseOtherLongTermDebt | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Amortization of gain on cash flow hedge on Series 2007D Senior Note, which was redeemed in July 2012, is being credited to FERC account 427 through June 2037.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
RECONCILIATION OF REPORTED NET INCOME WITH TAXABLE INCOME FOR FEDERAL INCOME TAXES |
||
|
||
| Line No. |
Particulars (Details) (a) |
Amount (b) |
| 1 |
Net Income for the Year (Page 117) |
|
| 2 |
Reconciling Items for the Year |
|
| 3 | ||
| 4 |
Taxable Income Not Reported on Books |
|
| 5 | (a) |
|
| 9 |
Deductions Recorded on Books Not Deducted for Return |
|
| 10 | (b) |
|
| 14 |
Income Recorded on Books Not Included in Return |
|
| 15 | (c) |
|
| 19 |
Deductions on Return Not Charged Against Book Income |
|
| 20 | (d) |
|
| 27 |
Federal Tax Net Income |
|
| 28 |
Show Computation of Tax: |
|
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: TaxableIncomeNotReportedOnBooks | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TAXABLE INCOME NOT ON THE BOOKS
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: DeductionsRecordedOnBooksNotDeductedForReturn | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
EXPENSES RECORDED ON BOOKS NOT DEDUCTED ON TAX RETURN
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: IncomeRecordedOnBooksNotIncludedInReturn | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
INCOME ON BOOKS NOT INCLUDED IN RETURN
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: DeductionsOnReturnNotChargedAgainstBookIncome | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DEDUCTIONS NOT CHARGED AGAINST BOOK INCOME
CONSOLIDATION AND ALLOCATION INFORMATION
Members of Group and Tax Allocation (Note 1)
Note 1: Basis of Allocation: The consolidated federal income tax is allocated under Section 1552 (a) (1) of the Internal Revenue Code of 1986 as prescribed by Rule 45 (c) of the Securities and Exchange Commission’s regulations with certain modifications approved by the Securities and Exchange Commission.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
TAXES ACCRUED, PREPAID AND CHARGES DURING YEAR |
|||||||||||||||
|
|||||||||||||||
| BALANCE AT BEGINNING OF YEAR | BALANCE AT END OF YEAR | DISTRIBUTION OF TAXES CHARGED | |||||||||||||
| Line No. |
DescriptionOfTaxesAccruedPrepaidAndCharged Kind of Tax (See Instruction 5) (a) |
TypeOfTax Type of Tax (b) |
TaxJurisdiction State (c) |
TaxYear Tax Year (d) |
TaxesAccrued Taxes Accrued (Account 236) (e) |
PrepaidTaxes Prepaid Taxes (Include in Account 165) (f) |
TaxesCharged Taxes Charged During Year (g) |
TaxesPaid Taxes Paid During Year (h) |
TaxAdjustments Adjustments (i) |
TaxesAccrued Taxes Accrued (Account 236) (j) |
PrepaidTaxes Prepaid Taxes (Included in Account 165) (k) |
TaxesAccruedPrepaidAndCharged Electric (Account 408.1, 409.1) (l) |
IncomeTaxesExtraordinaryItems Extraordinary Items (Account 409.3) (m) |
AdjustmentsToRetainedEarnings Adjustment to Ret. Earnings (Account 439) (n) |
TaxesIncurredOther Other (o) |
| 1 | |||||||||||||||
| 2 | |||||||||||||||
| 3 | |||||||||||||||
| 4 | |||||||||||||||
| 5 | |||||||||||||||
| 6 | |||||||||||||||
| 7 | |||||||||||||||
| 8 | |||||||||||||||
| 9 | |||||||||||||||
| 10 | |||||||||||||||
| 11 | |||||||||||||||
| 12 | |||||||||||||||
| 13 | Subtotal Property Tax |
||||||||||||||
| 14 | |||||||||||||||
| 15 | |||||||||||||||
| 16 | |||||||||||||||
| 17 | Subtotal Income Tax |
||||||||||||||
| 18 | |||||||||||||||
| 19 | |||||||||||||||
| 20 | Subtotal Franchise Tax |
||||||||||||||
| 21 | |||||||||||||||
| 22 | |||||||||||||||
| 23 | |||||||||||||||
| 24 | Subtotal Other License And Fees Tax |
||||||||||||||
| 25 | |||||||||||||||
| 26 | |||||||||||||||
| 27 | |||||||||||||||
| 28 | |||||||||||||||
| 29 | |||||||||||||||
| 30 | |||||||||||||||
| 31 | Subtotal Payroll Tax |
||||||||||||||
| 32 | |||||||||||||||
| 33 | Subtotal Other Taxes And Fees |
||||||||||||||
| 40 |
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ACCUMULATED DEFERRED INVESTMENT TAX CREDITS (Account 255) |
|||||||||||
|
Report below information applicable to Account 255. Where appropriate, segregate the balances and transactions by utility and nonutility operations. Explain by footnote any correction adjustments to the account balance shown in column (g). Include in column (i) the average period over which the tax credits are amortized. |
|||||||||||
| Deferred for Year | Allocations to Current Year's Income | ||||||||||
| Line No. |
Account Subdivisions (a) |
Balance at Beginning of Year (b) |
Account No. (c) |
Amount (d) |
Account No. (e) |
Amount (f) |
Adjustments (g) |
Balance at End of Year (h) |
Average Period of Allocation to Income (i) |
ADJUSTMENT EXPLANATION (j) |
|
| 1 | Electric Utility |
||||||||||
| 2 |
|
||||||||||
| 3 |
|
||||||||||
| 4 |
|
||||||||||
| 5 |
|
||||||||||
| 6 |
|
||||||||||
| 8 |
TOTAL Electric (Enter Total of lines 2 thru 7) |
|
|
|
|
||||||
| 9 | Other (List separately and show 3%, 4%, 7%, 10% and TOTAL) |
||||||||||
| 10 | |||||||||||
| 47 | OTHER TOTAL | ||||||||||
| 48 | GRAND TOTAL |
|
|
||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
OTHER DEFERRED CREDITS (Account 253) |
||||||
|
||||||
| DEBITS | ||||||
| Line No. |
Description and Other Deferred Credits (a) |
Balance at Beginning of Year (b) |
Contra Account (c) |
Amount (d) |
Credits (e) |
Balance at End of Year (f) |
| 1 | ||||||
| 2 | ||||||
| 3 | (a) |
|||||
| 4 | (b) |
|||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | (c) |
|||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | (d) |
|||||
| 14 | (e) |
|||||
| 47 |
TOTAL |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DescriptionOfOtherDeferredCredits |
Atlanta-Jacksonville Prepaid Fiber Maintenance and Right of Way Encroachment is being amortized over 10 years and 22 years ending in 2024 and 2025, respectively. Macon Ring and Macon Spur Prepaid Fiber is being amortized over 20 years and 24 years ending in 2027 and 2026, respectively.
|
| (b) Concept: DescriptionOfOtherDeferredCredits |
Deferred credits for Contributions in Aid of Construction (CIAC) are cash advances from customers related to capital projects which are used to offset CWIP costs when incurred.
Prepaid on-going maintenance over $250K for CIAC requires amortization over the life of the asset.
|
| (c) Concept: DescriptionOfOtherDeferredCredits |
Prepaid Rent for Outdoor Lighting is amortized over a 24-month period beginning in the month the payment is received.
|
| (d) Concept: DescriptionOfOtherDeferredCredits |
Deferred revenue from Utility Service Contracts is being amortized over the life of the contract which is 25 years.
|
| (e) Concept: DescriptionOfOtherDeferredCredits |
Maintenance on Atlanta Airport network underground facilities at the End Around Relocation and Concourse is being amortized over 29 years ending 2036 and 35 years ending 2043, respectively. The Dekalb County Water Plant Substation is being amortized over 33 years ending in 2043.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ACCUMULATED DEFERRED INCOME TAXES - ACCELERATED AMORTIZATION PROPERTY (Account 281) |
||||||||||||
|
||||||||||||
| CHANGES DURING YEAR | ADJUSTMENTS | |||||||||||
| Debits | Credits | |||||||||||
| Line No. |
Account (a) |
Balance at Beginning of Year (b) |
Amounts Debited to Account 410.1 (c) |
Amounts Credited to Account 411.1 (d) |
Amounts Debited to Account 410.2 (e) |
Amounts Credited to Account 411.2 (f) |
Account Credited (g) |
Amount (h) |
Account Debited (i) |
Amount (j) |
Balance at End of Year (k) |
|
1 |
Accelerated Amortization (Account 281) |
|||||||||||
2 |
Electric |
|||||||||||
3 |
Defense Facilities |
|||||||||||
4 |
Pollution Control Facilities |
|
||||||||||
5 |
Other |
|||||||||||
5.1 |
|
|||||||||||
8 |
TOTAL Electric (Enter Total of lines 3 thru 7) |
|
||||||||||
9 |
Gas |
|||||||||||
10 |
Defense Facilities |
|||||||||||
11 |
Pollution Control Facilities |
|||||||||||
12 |
Other |
|||||||||||
12.1 |
|
|||||||||||
15 |
TOTAL Gas (Enter Total of lines 10 thru 14) |
|||||||||||
16 |
Other |
|||||||||||
16.1 |
Other |
|||||||||||
16.2 |
Other |
|||||||||||
17 |
TOTAL (Acct 281) (Total of 8, 15 and 16) |
|
||||||||||
| 18 |
Classification of TOTAL |
|||||||||||
| 19 |
Federal Income Tax |
|
|
|
|
|
|
|
||||
| 20 |
State Income Tax |
|
|
|
|
|
|
|
||||
| 21 |
Local Income Tax |
|||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ACCUMULATED DEFERRED INCOME TAXES - OTHER PROPERTY (Account 282) |
||||||||||||
|
||||||||||||
| CHANGES DURING YEAR | ADJUSTMENTS | |||||||||||
| Debits | Credits | |||||||||||
| Line No. |
Account (a) |
Balance at Beginning of Year (b) |
Amounts Debited to Account 410.1 (c) |
Amounts Credited to Account 411.1 (d) |
Amounts Debited to Account 410.2 (e) |
Amounts Credited to Account 411.2 (f) |
Account Credited (g) |
Amount (h) |
Account Debited (i) |
Amount (j) |
Balance at End of Year (k) |
|
| 1 | Account 282 | |||||||||||
2 |
Electric |
|||||||||||
3 |
Gas |
|||||||||||
4 |
Other (Specify) |
|||||||||||
5 |
Total (Total of lines 2 thru 4) |
|||||||||||
| 6 |
|
|
|
|
|
|
||||||
| 7 |
|
|
|
|
||||||||
| 8 |
|
|
|
|
|
|||||||
| 9 |
TOTAL Account 282 (Total of Lines 5 thru 8) |
|
|
|
|
|
|
|
|
|||
| 10 |
Classification of TOTAL |
|||||||||||
| 11 |
Federal Income Tax |
|
|
|
|
|
|
|
|
|
|
|
| 12 |
State Income Tax |
|
|
|
|
|
|
|
|
|
|
|
| 13 |
Local Income Tax |
|||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ACCUMULATED DEFERRED INCOME TAXES - OTHER (Account 283) |
|||||||||||
|
|||||||||||
| CHANGES DURING YEAR | ADJUSTMENTS | ||||||||||
| Debits | Credits | ||||||||||
| Line No. |
Account (a) |
Balance at Beginning of Year (b) |
Amounts Debited to Account 410.1 (c) |
Amounts Credited to Account 411.1 (d) |
Amounts Debited to Account 410.2 (e) |
Amounts Credited to Account 411.2 (f) |
Account Credited (g) |
Amount (h) |
Account Debited (i) |
Amount (j) |
Balance at End of Year (k) |
| 1 | Account 283 | ||||||||||
| 2 |
Electric |
||||||||||
| 3 |
|
|
|
|
|||||||
| 4 |
|
|
|
|
|
||||||
| 5 |
|
|
|
|
|
|
|
|
|
||
| 6 |
|
|
|
|
|
|
(a) |
||||
| 9 | TOTAL Electric (Total of lines 3 thru 8) |
|
|
|
|
|
|
||||
| 10 |
Gas |
||||||||||
| 11 | |||||||||||
| 12 | |||||||||||
| 13 | |||||||||||
| 14 | |||||||||||
| 15 | |||||||||||
| 16 | |||||||||||
| 17 | TOTAL Gas (Total of lines 11 thru 16) | ||||||||||
| 18 | TOTAL Other |
|
|
|
|||||||
| 19 | TOTAL (Acct 283) (Enter Total of lines 9, 17 and 18) |
|
|
|
|
|
|
|
|||
| 20 |
Classification of TOTAL |
||||||||||
| 21 |
Federal Income Tax |
|
|
|
|
|
|
|
|
|
|
| 22 |
State Income Tax |
|
|
|
|
|
|
|
|
||
| 23 |
Local Income Tax |
||||||||||
|
NOTES |
|||||||||||
| FOOTNOTE DATA |
| (a) Concept: AccumulatedDeferredIncomeTaxesOther | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NOTE 1: DITS associated with Premium on Reacquired Debt relate to the premium on the reacquisition of certain series of first mortgage and pollution control bonds. This loss on reacquisition is recognized for tax return purposes in the year incurred, but amortized over various periods for book purposes.
NOTE 2: DITS on Additional Pension Deduction relate to actual pension costs that impact the pension fund and are currently recognized for tax return purposes. For book purposes, a deduction is taken as the pension costs are accrued.
NOTE 3: DITS on Other Basis Differences - 109 represent the tax effects of temporary differences created with FAS 109.
NOTE 4: DITS on Deferred Jobs Revenues represent revenues that have been billed for jobbing work done. The revenues are deferred on the books until all costs are accumulated. For tax purposes, the revenues are recognized currently.
NOTE 5: DITS on Emission Allowances represent actual cash payments deducted on the tax return for the purchases of emission allowances versus book accounting, which accounts for the allowances using an average weighted cost basis.
NOTE 6: DITS on Unbilled Revenues associated with Flat Bill program represent tax effect of differences between customer actual usage and contracted usage related revenues.
NOTE 7: DITS on Fuel Clause Recovery relate to recognition of the under recovery of fuel costs in revenues for book purposes currently, while these revenues are recognized for tax purposes when actually collected.
NOTE 8: DITS on Levelized Purchase Power relate to actual capacity expenses which are recognized as paid for tax purposes. For book purposes, these costs will be levelized over the term of the purchase agreement.
NOTE 9: DITS on Nuclear Outage relate to expenses incurred during scheduled outages at nuclear facilities, which are deferred on the books per a GPSC retail rate order. For book purposes, these costs will be amortized over the GPSC mandated recovery period. For tax purposes, these costs are deducted as incurred.
NOTE 10: DITS on Nuclear Construction Cost Recovery are related to the billed amounts to customers for the recovery of financing cost associated with building a nuclear plant.
NOTE 11: DITS on Other Deferred Costs - Electric are miscellaneous temporary differences.
NOTE 12: DITS on Regulatory Asset Obsolete Inventory are associated with the inventory determined to be obsolete related to the retirement of Plant Branch Units 3 and 4.
NOTE 13: Regulatory Asset Cancelled Construction Projects are associated with the cost deferrals of cancelled construction projects for retired units. These cost are expected to be amortized for books over nine years beginning in January 2014.
NOTE 14: DITS on Regulatory Assets Retired Units are associated with Net Book Value that will be amortized over the remaining useful life of the unit.
NOTE 15: DITS on Customer Advances on Construction are funds received from customers for construction work requested by customer. For tax, the funds are taxable upon receipt.
NOTE 16: DITS on Storm Damage represent actual costs deducted on the tax return as incurred, which have exceeded the book accrual allowed by the GPSC.
NOTE 17: DITS On Tax Legislative Regulatory Adjustment represent deductions made to our Other Post Retirement Benefit balance related to the Medicare Subsidy. Federal tax laws changed our anticipated tax return deduction for future years related to retiree prescription drugs as a result of the subsidy now being taxable.
NOTE 18: DITS on Other Income & Deductions represent the tax effect associated with FAS 133, Non-Utility Deferred Intercompany Gains, and miscellaneous differences. Deferred Intercompany Gains relate to the gain on the sale of transmission properties to Gulf Power Company (now Florida Power and Light Company), gain on the sale of computer equipment to Southern Company Services, and gain on sale of property to Southern Power Company.
NOTE 19: DITS on State Tax Reform Legislation are related to the expected impact of the change in the state tax rate.
NOTE 20: DITS on Regulatory Asset Customer Usage Data Costs represent costs to be recovered for acquiring customer usage data.
NOTE 21: DITS on Deferred Interest Nuclear Fuel relate to the deferral of capitalized interest on nuclear fuel for Plant Vogtle Units 3 &4.
NOTE 22: DITS on Reg. Asset – Cloud Computing are associated with the deferral of certain costs related to the implementation of new cloud based business applications used by the Company.
NOTE 23: DITS on Reg. Asset - IQTBEE (Income Qualified Tariff Based on Energy Efficiency) are related to a program for retail customers that provides energy efficiency upgrades to income qualified customers.
NOTE 24: DITS on Reg. Asset - COVID-19 costs are associated with recoverable costs from the COVID-19 pandemic.
NOTE 25: DITS on Reg. Asset - TOU MB Revenue Erosion are related to the regulatory asset created for tracking revenue erosion from Georgia Power customers using the "time of use - medium business rate."
NOTE 26: DITS on Reg. Asset - Deferred Plant Depreciation are related to the PSC approved deferral of depreciation for Plant Scherer Units 1-3, Bowen Units 1 & 2, and Vogtle Unit 3.
NOTE 27: DITS on Reg. Asset - Nuclear Financing are related to the deferred financing costs on Vogtle Unit 3 as ordered by the PSC.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
OTHER REGULATORY LIABILITIES (Account 254) |
||||||
|
||||||
| DEBITS | ||||||
| Line No. |
Description and Purpose of Other Regulatory Liabilities (a) |
Balance at Beginning of Current Quarter/Year (b) |
Account Credited (c) |
Amount (d) |
Credits (e) |
Balance at End of Current Quarter/Year (f) |
| 1 |
(a) |
|
|
|
|
|
| 2 |
(b) |
|
|
|
|
|
| 3 |
(c) |
|
|
|
|
|
| 4 |
(d) |
|
|
|
|
|
| 5 |
(e) |
|
|
|
|
|
| 6 |
(f) |
|
|
|
|
|
| 7 |
(g) |
|
|
|
|
|
| 8 |
(h) |
|
|
|
|
|
| 41 | TOTAL |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (e) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (f) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (g) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (h) Concept: DescriptionAndPurposeOfOtherRegulatoryLiabilities | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
Electric Operating Revenues |
|||||||
|
|||||||
| Line No. |
Title of Account (a) |
Operating Revenues Year to Date Quarterly/Annual (b) |
Operating Revenues Previous year (no Quarterly) (c) |
MEGAWATT HOURS SOLD Year to Date Quarterly/Annual (d) |
MEGAWATT HOURS SOLD Amount Previous year (no Quarterly) (e) |
AVG.NO. CUSTOMERS PER MONTH Current Year (no Quarterly) (f) |
AVG.NO. CUSTOMERS PER MONTH Previous Year (no Quarterly) (g) |
|
1 |
SalesOfElectricityHeadingAbstract Sales of Electricity |
||||||
|
2 |
ResidentialSalesAbstract (440) Residential Sales |
|
|
|
|
|
|
|
3 |
CommercialAndIndustrialSalesAbstract (442) Commercial and Industrial Sales |
||||||
|
4 |
CommercialSalesAbstract Small (or Comm.) (See Instr. 4) |
|
|
|
|
|
|
|
5 |
IndustrialSalesAbstract Large (or Ind.) (See Instr. 4) |
|
|
|
|
|
|
|
6 |
PublicStreetAndHighwayLightingAbstract (444) Public Street and Highway Lighting |
|
|
|
|
|
|
|
7 |
OtherSalesToPublicAuthoritiesAbstract (445) Other Sales to Public Authorities |
||||||
|
8 |
SalesToRailroadsAndRailwaysAbstract (446) Sales to Railroads and Railways |
|
|
|
|
|
|
|
9 |
InterdepartmentalSalesAbstract (448) Interdepartmental Sales |
||||||
|
10 |
SalesToUltimateConsumersAbstract TOTAL Sales to Ultimate Consumers |
|
|
|
|
|
|
|
11 |
SalesForResaleAbstract (447) Sales for Resale |
|
|
|
|
||
|
12 |
SalesOfElectricityAbstract TOTAL Sales of Electricity |
|
|
|
|
|
|
|
13 |
ProvisionForRateRefundsAbstract (Less) (449.1) Provision for Rate Refunds |
(a) |
|
||||
|
14 |
RevenuesNetOfProvisionForRefundsAbstract TOTAL Revenues Before Prov. for Refunds |
|
|
|
|
|
|
|
15 |
OtherOperatingRevenuesAbstract Other Operating Revenues |
||||||
|
16 |
ForfeitedDiscounts (450) Forfeited Discounts |
|
|
||||
|
17 |
MiscellaneousServiceRevenues (451) Miscellaneous Service Revenues |
(b) |
(d) |
||||
|
18 |
SalesOfWaterAndWaterPower (453) Sales of Water and Water Power |
|
|
||||
|
19 |
RentFromElectricProperty (454) Rent from Electric Property |
|
|
||||
|
20 |
InterdepartmentalRents (455) Interdepartmental Rents |
||||||
|
21 |
OtherElectricRevenue (456) Other Electric Revenues |
(c) |
(e) |
||||
|
22 |
RevenuesFromTransmissionOfElectricityOfOthers (456.1) Revenues from Transmission of Electricity of Others |
|
|
||||
|
23 |
RegionalTransmissionServiceRevenues (457.1) Regional Control Service Revenues |
||||||
|
24 |
MiscellaneousRevenue (457.2) Miscellaneous Revenues |
||||||
|
25 |
OtherMiscellaneousOperatingRevenues Other Miscellaneous Operating Revenues |
||||||
|
26 |
OtherOperatingRevenues TOTAL Other Operating Revenues |
|
|
||||
|
27 |
ElectricOperatingRevenues TOTAL Electric Operating Revenues |
|
|
||||
|
Line12, column (b) includes $
|
|||||||
|
Line12, column (d) includes
|
|||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: ProvisionForRateRefunds | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Provision for rate refund
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (b) Concept: MiscellaneousServiceRevenues | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (c) Concept: OtherElectricRevenue | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (d) Concept: MiscellaneousServiceRevenues | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| (e) Concept: OtherElectricRevenue | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
REGIONAL TRANSMISSION SERVICE REVENUES (Account 457.1) |
|||||
|
|||||
| Line No. |
Description of Service (a) |
Balance at End of Quarter 1 (b) |
Balance at End of Quarter 2 (c) |
Balance at End of Quarter 3 (d) |
Balance at End of Year (e) |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| 11 | |||||
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 | |||||
| 31 | |||||
| 32 | |||||
| 33 | |||||
| 34 | |||||
| 35 | |||||
| 36 | |||||
| 37 | |||||
| 38 | |||||
| 39 | |||||
| 40 | |||||
| 41 | |||||
| 42 | |||||
| 43 | |||||
| 44 | |||||
| 45 | |||||
| 46 |
TOTAL |
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 1 |
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
| 6 |
|
|
|
|
|
|
| 7 |
|
|
|
|
|
|
| 8 |
|
|
|
|
|
|
| 9 |
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
| 11 |
|
|
|
|
|
|
| 12 |
|
|
|
|
|
|
| 13 |
|
|
|
|
|
|
| 14 |
|
|
|
|
|
|
| 41 | TOTAL Billed Residential Sales |
|
|
|
|
|
| 42 | TOTAL Unbilled Rev. (See Instr. 6) |
|
|
|
||
| 43 | TOTAL |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 1 |
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
| 6 |
|
|
|
|
|
|
| 7 |
|
|
|
|
|
|
| 8 |
|
|
|
|
|
|
| 9 |
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
| 11 |
|
|
|
|
|
|
| 12 |
|
|
|
|
|
|
| 13 |
|
|
|
|
|
|
| 14 |
|
|
|
|
|
|
| 15 |
|
|
|
|
|
|
| 16 |
|
|
|
|
|
|
| 17 |
|
|
|
|
|
|
| 18 |
|
|
|
|
|
|
| 19 |
|
|
|
|
|
|
| 20 |
|
|
|
|
|
|
| 21 |
|
|
|
|
|
|
| 22 |
|
|
|
|
|
|
| 23 |
|
|
|
|
|
|
| 24 |
|
|
|
|
|
|
| 25 |
|
|
|
|
|
|
| 26 |
|
|
|
|
|
|
| 27 |
|
|
|
|
|
|
| 28 |
|
|
|
|
|
|
| 29 |
|
|
|
|
|
|
| 30 |
|
|
|
|
|
|
| 31 |
|
|
|
|
|
|
| 32 |
|
|
|
|
|
|
| 33 |
|
|
|
|
|
|
| 34 |
|
|
|
|
|
|
| 35 |
|
|
|
|
|
|
| 36 |
|
|
|
|
|
|
| 37 |
|
|
|
|
|
|
| 38 |
|
|
|
|
|
|
| 39 |
|
|
|
|
|
|
| 40 |
|
|
|
|
|
|
| 41 |
|
|
|
|
|
|
| 41 | TOTAL Billed Small or Commercial |
|
|
|
|
|
| 42 | TOTAL Unbilled Rev. Small or Commercial (See Instr. 6) |
|
|
|
||
| 43 | TOTAL Small or Commercial |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 1 |
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
| 6 |
|
|
|
|
|
|
| 7 |
|
|
|
|
|
|
| 8 |
|
|
|
|
|
|
| 9 |
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
| 11 |
|
|
|
|
|
|
| 12 |
|
|
|
|
|
|
| 13 |
|
|
|
|
|
|
| 14 |
|
|
|
|
|
|
| 15 |
|
|
|
|
|
|
| 16 |
|
|
|
|
|
|
| 17 |
|
|
|
|
|
|
| 18 |
|
|
|
|
|
|
| 19 |
|
|
|
|
|
|
| 20 |
|
|
|
|
|
|
| 21 |
|
|
|
|
|
|
| 22 |
|
|
|
|
|
|
| 23 |
|
|
|
|
|
|
| 24 |
|
|
|
|
|
|
| 25 |
|
|
|
|
|
|
| 26 |
|
|
|
|
|
|
| 27 |
|
|
|
|
|
|
| 28 |
|
|
|
|
|
|
| 29 |
|
|
|
|
|
|
| 30 |
|
|
|
|
|
|
| 31 |
|
|
|
|
|
|
| 32 |
|
|
|
|
|
|
| 33 |
|
|
|
|
|
|
| 34 |
|
|
|
|
|
|
| 35 |
|
|
|
|
|
|
| 36 |
|
|
|
|
|
|
| 41 | TOTAL Billed Large (or Ind.) Sales |
|
|
|
|
|
| 42 | TOTAL Unbilled Rev. Large (or Ind.) (See Instr. 6) |
|
|
|
||
| 43 | TOTAL Large (or Ind.) |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 1 |
|
|
|
|
|
|
| 2 |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
| 41 | TOTAL Billed Public Street and Highway Lighting |
|
|
|
|
|
| 42 | TOTAL Unbilled Rev. (See Instr. 6) |
|
||||
| 43 | TOTAL |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 1 |
|
|
|
|
|
|
| 41 | TOTAL Billed Sales To Railroads and Railways |
|
|
|
|
|
| 42 | TOTAL Unbilled Rev. (See Instr. 6) |
|
||||
| 43 | TOTAL |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 | ||||||
| 29 | ||||||
| 30 | ||||||
| 31 | ||||||
| 32 | ||||||
| 33 | ||||||
| 34 | ||||||
| 35 | ||||||
| 36 | ||||||
| 37 | ||||||
| 38 | ||||||
| 39 | ||||||
| 40 | ||||||
| 41 | TOTAL Billed Provision For Rate Refunds | |||||
| 42 | TOTAL Unbilled Rev. (See Instr. 6) | |||||
| 43 | TOTAL |
(a) |
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: ProvisionForRateRefunds |
Provision for rate refund
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES OF ELECTRICITY BY RATE SCHEDULES |
||||||
|
||||||
| Line No. |
Number and Title of Rate Schedule (a) |
MWh Sold (b) |
Revenue (c) |
Average Number of Customers (d) |
KWh of Sales Per Customer (e) |
Revenue Per KWh Sold (f) |
| 41 | TOTAL Billed - All Accounts |
|
|
|
|
|
| 42 | TOTAL Unbilled Rev. (See Instr. 6) - All Accounts |
|
(a) |
|||
| 43 | TOTAL - All Accounts |
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: RevenueFromSalesOfElectricityByRateSchedulesUnbilled | ||||||||||||||||||||||||||||||||||||||||||
The Total Unbilled Rev included in total sales of electricity on pg 300 line 12 is ($191,400,445). The Total Unbilled Rev on pg 304 line 47 includes ($33,698,823.98) of Unbilled Revenue. The difference of ($157,701,621.26) is adjustments including:
| ||||||||||||||||||||||||||||||||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
SALES FOR RESALE (Account 447) |
|||||||||||
|
|||||||||||
| ACTUAL DEMAND (MW) | REVENUE | ||||||||||
| Line No. |
Name of Company or Public Authority (Footnote Affiliations) (a) |
Statistical Classification (b) |
FERC Rate Schedule or Tariff Number (c) |
Average Monthly Billing Demand (MW) (d) |
Average Monthly NCP Demand (e) |
Average Monthly CP Demand (f) |
Megawatt Hours Sold (g) |
Demand Charges ($) (h) |
Energy Charges ($) (i) |
Other Charges ($) (j) |
Total ($) (h+i+j) (k) |
| 1 |
|
|
|
|
|
|
|||||
| 2 |
|
|
|
|
|
|
|
||||
| 3 |
|
|
|
|
|
|
|||||
| 4 |
|
|
|
|
|
||||||
| 5 |
|
|
|
|
|
||||||
| 6 |
|
|
|
|
|
|
|||||
| 7 |
|
|
|
|
|
|
|||||
| 8 |
|
|
|
|
|
|
|||||
| 9 |
|
|
|
|
|
|
|||||
| 10 |
|
|
|
||||||||
| 11 |
|
|
|
|
|
|
|
||||
| 12 |
|
|
|
|
|
|
|||||
| 13 |
|
|
|
|
|
|
|
||||
| 14 |
|
|
|
|
|
|
|||||
| 15 |
|
|
|
|
|
||||||
| 16 |
|
|
|
|
|
|
|||||
| 17 |
|
|
|
|
|
|
|||||
| 18 |
|
|
|
|
|
|
|||||
| 19 |
|
|
|
|
|
|
|||||
| 20 |
|
|
|
|
|
|
|||||
| 21 |
|
|
|
|
|
|
|
||||
| 22 |
|
|
|
||||||||
| 23 |
|
|
|
|
|
|
|||||
| 24 |
|
|
|
|
|
|
|||||
| 25 |
|
|
|
|
|
|
|||||
| 26 |
|
|
|
|
|
|
|||||
| 27 |
|
|
|
|
|
|
|||||
| 28 |
|
|
|
|
|
|
|
||||
| 29 |
|
|
|
|
|
|
|||||
| 30 |
|
|
|
||||||||
| 31 |
|
|
|
|
|
|
|
||||
| 32 |
|
|
|
|
|
||||||
| 33 |
|
|
|
|
|
|
|
||||
| 34 |
|
|
|
|
|
||||||
| 35 |
|
|
|
|
|
|
|
||||
| 36 |
|
|
|
||||||||
| 37 |
|
|
|
|
|
|
|||||
| 38 |
|
|
|
|
|
|
|
||||
| 39 |
|
|
|
|
|
|
|
||||
| 40 |
|
|
|
|
|
|
|||||
| 41 |
|
|
|
||||||||
| 42 |
|
|
|
||||||||
| 43 |
|
|
|
|
|
|
|||||
| 44 |
|
|
|
|
|
|
|
||||
| 45 |
|
|
|
|
|
||||||
| 46 |
|
|
|
|
|
||||||
| 15 |
Subtotal - RQ |
||||||||||
| 16 |
Subtotal-Non-RQ |
|
|
|
|
||||||
| 17 | Total |
|
|
|
|
||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
ELECTRIC OPERATION AND MAINTENANCE EXPENSES |
|||
|
If the amount for previous year is not derived from previously reported figures, explain in footnote. |
|||
| Line No. |
Account (a) |
Amount for Current Year (b) |
Amount for Previous Year (c) (c) |
|
1 |
PowerProductionExpensesAbstract 1. POWER PRODUCTION EXPENSES |
||
|
2 |
SteamPowerGenerationAbstract A. Steam Power Generation |
||
|
3 |
SteamPowerGenerationOperationAbstract Operation |
||
|
4 |
OperationSupervisionAndEngineeringSteamPowerGeneration (500) Operation Supervision and Engineering |
|
|
|
5 |
FuelSteamPowerGeneration (501) Fuel |
|
|
|
6 |
SteamExpensesSteamPowerGeneration (502) Steam Expenses |
|
|
|
7 |
SteamFromOtherSources (503) Steam from Other Sources |
||
|
8 |
SteamTransferredCredit (Less) (504) Steam Transferred-Cr. |
||
|
9 |
ElectricExpensesSteamPowerGeneration (505) Electric Expenses |
|
|
|
10 |
MiscellaneousSteamPowerExpenses (506) Miscellaneous Steam Power Expenses |
|
|
|
11 |
RentsSteamPowerGeneration (507) Rents |
||
|
12 |
Allowances (509) Allowances |
|
|
|
13 |
SteamPowerGenerationOperationsExpense TOTAL Operation (Enter Total of Lines 4 thru 12) |
|
|
|
14 |
SteamPowerGenerationMaintenanceAbstract Maintenance |
||
|
15 |
MaintenanceSupervisionAndEngineeringSteamPowerGeneration (510) Maintenance Supervision and Engineering |
|
|
|
16 |
MaintenanceOfStructuresSteamPowerGeneration (511) Maintenance of Structures |
|
|
|
17 |
MaintenanceOfBoilerPlantSteamPowerGeneration (512) Maintenance of Boiler Plant |
|
|
|
18 |
MaintenanceOfElectricPlantSteamPowerGeneration (513) Maintenance of Electric Plant |
|
|
|
19 |
MaintenanceOfMiscellaneousSteamPlant (514) Maintenance of Miscellaneous Steam Plant |
|
|
|
20 |
SteamPowerGenerationMaintenanceExpense TOTAL Maintenance (Enter Total of Lines 15 thru 19) |
|
|
|
21 |
PowerProductionExpensesSteamPower TOTAL Power Production Expenses-Steam Power (Enter Total of Lines 13 & 20) |
|
|
|
22 |
NuclearPowerGenerationAbstract B. Nuclear Power Generation |
||
|
23 |
NuclearPowerGenerationOperationAbstract Operation |
||
|
24 |
OperationSupervisionAndEngineeringNuclearPowerGeneration (517) Operation Supervision and Engineering |
|
|
|
25 |
NuclearFuelExpense (518) Fuel |
|
|
|
26 |
CoolantsAndWater (519) Coolants and Water |
|
|
|
27 |
SteamExpensesNuclearPowerGeneration (520) Steam Expenses |
|
|
|
28 |
SteamFromOtherSourcesNuclearPowerGeneration (521) Steam from Other Sources |
||
|
29 |
SteamTransferredCreditNuclearPowerGeneration (Less) (522) Steam Transferred-Cr. |
||
|
30 |
ElectricExpensesNuclearPowerGeneration (523) Electric Expenses |
|
|
|
31 |
MiscellaneousNuclearPowerExpenses (524) Miscellaneous Nuclear Power Expenses |
|
|
|
32 |
RentsNuclearPowerGeneration (525) Rents |
|
|
|
33 |
NuclearPowerGenerationOperationsExpense TOTAL Operation (Enter Total of lines 24 thru 32) |
|
|
|
34 |
NuclearPowerGenerationMaintenanceAbstract Maintenance |
||
|
35 |
MaintenanceSupervisionAndEngineeringNuclearPowerGeneration (528) Maintenance Supervision and Engineering |
|
|
|
36 |
MaintenanceOfStructuresNuclearPowerGeneration (529) Maintenance of Structures |
|
|
|
37 |
MaintenanceOfReactorPlantEquipmentNuclearPowerGeneration (530) Maintenance of Reactor Plant Equipment |
|
|
|
38 |
MaintenanceOfElectricPlantNuclearPowerGeneration (531) Maintenance of Electric Plant |
|
|
|
39 |
MaintenanceOfMiscellaneousNuclearPlant (532) Maintenance of Miscellaneous Nuclear Plant |
|
|
|
40 |
NuclearPowerGenerationMaintenanceExpense TOTAL Maintenance (Enter Total of lines 35 thru 39) |
|
|
|
41 |
PowerProductionExpensesNuclearPower TOTAL Power Production Expenses-Nuclear. Power (Enter Total of lines 33 & 40) |
|
|
|
42 |
HydraulicPowerGenerationAbstract C. Hydraulic Power Generation |
||
|
43 |
HydraulicPowerGenerationOperationAbstract Operation |
||
|
44 |
OperationSupervisionAndEngineeringHydraulicPowerGeneration (535) Operation Supervision and Engineering |
|
|
|
45 |
WaterForPower (536) Water for Power |
|
|
|
46 |
HydraulicExpenses (537) Hydraulic Expenses |
|
|
|
47 |
ElectricExpensesHydraulicPowerGeneration (538) Electric Expenses |
|
|
|
48 |
MiscellaneousHydraulicPowerGenerationExpenses (539) Miscellaneous Hydraulic Power Generation Expenses |
|
|
|
49 |
RentsHydraulicPowerGeneration (540) Rents |
|
|
|
50 |
HydraulicPowerGenerationOperationsExpense TOTAL Operation (Enter Total of Lines 44 thru 49) |
|
|
|
51 |
HydraulicPowerGenerationContinuedAbstract C. Hydraulic Power Generation (Continued) |
||
|
52 |
HydraulicPowerGenerationMaintenanceAbstract Maintenance |
||
|
53 |
MaintenanceSupervisionAndEngineeringHydraulicPowerGeneration (541) Mainentance Supervision and Engineering |
|
|
|
54 |
MaintenanceOfStructuresHydraulicPowerGeneration (542) Maintenance of Structures |
|
|
|
55 |
MaintenanceOfReservoirsDamsAndWaterways (543) Maintenance of Reservoirs, Dams, and Waterways |
|
|
|
56 |
MaintenanceOfElectricPlantHydraulicPowerGeneration (544) Maintenance of Electric Plant |
|
|
|
57 |
MaintenanceOfMiscellaneousHydraulicPlant (545) Maintenance of Miscellaneous Hydraulic Plant |
|
|
|
58 |
HydraulicPowerGenerationMaintenanceExpense TOTAL Maintenance (Enter Total of lines 53 thru 57) |
|
|
|
59 |
PowerProductionExpensesHydraulicPower TOTAL Power Production Expenses-Hydraulic Power (Total of Lines 50 & 58) |
|
|
|
60 |
OtherPowerGenerationAbstract D. Other Power Generation |
||
|
61 |
OtherPowerGenerationOperationAbstract Operation |
||
|
62 |
OperationSupervisionAndEngineeringOtherPowerGeneration (546) Operation Supervision and Engineering |
|
|
|
63 |
Fuel (547) Fuel |
|
|
|
64 |
GenerationExpenses (548) Generation Expenses |
|
|
|
64.1 |
OperationOfEnergyStorageEquipment (548.1) Operation of Energy Storage Equipment |
||
|
65 |
MiscellaneousOtherPowerGenerationExpenses (549) Miscellaneous Other Power Generation Expenses |
|
|
|
66 |
RentsOtherPowerGeneration (550) Rents |
|
|
|
67 |
OtherPowerGenerationOperationsExpense TOTAL Operation (Enter Total of Lines 62 thru 67) |
|
|
|
68 |
OtherPowerGenerationMaintenanceAbstract Maintenance |
||
|
69 |
MaintenanceSupervisionAndEngineeringOtherPowerGeneration (551) Maintenance Supervision and Engineering |
|
|
|
70 |
MaintenanceOfStructures (552) Maintenance of Structures |
|
|
|
71 |
MaintenanceOfGeneratingAndElectricPlant (553) Maintenance of Generating and Electric Plant |
|
|
|
71.1 |
MaintenanceOfEnergyStorageEquipmentOtherPowerGeneration (553.1) Maintenance of Energy Storage Equipment |
||
|
72 |
MaintenanceOfMiscellaneousOtherPowerGenerationPlant (554) Maintenance of Miscellaneous Other Power Generation Plant |
|
|
|
73 |
OtherPowerGenerationMaintenanceExpense TOTAL Maintenance (Enter Total of Lines 69 thru 72) |
|
|
|
74 |
PowerProductionExpensesOtherPower TOTAL Power Production Expenses-Other Power (Enter Total of Lines 67 & 73) |
|
|
|
75 |
OtherPowerSuplyExpensesAbstract E. Other Power Supply Expenses |
||
|
76 |
PurchasedPower (555) Purchased Power |
|
|
|
76.1 |
PowerPurchasedForStorageOperations (555.1) Power Purchased for Storage Operations |
||
|
77 |
SystemControlAndLoadDispatchingElectric (556) System Control and Load Dispatching |
|
|
|
78 |
OtherExpensesOtherPowerSupplyExpenses (557) Other Expenses |
|
|
|
79 |
OtherPowerSupplyExpense TOTAL Other Power Supply Exp (Enter Total of Lines 76 thru 78) |
|
|
|
80 |
PowerProductionExpenses TOTAL Power Production Expenses (Total of Lines 21, 41, 59, 74 & 79) |
|
|
|
81 |
TransmissionExpensesAbstract 2. TRANSMISSION EXPENSES |
||
|
82 |
TransmissionExpensesOperationAbstract Operation |
||
|
83 |
OperationSupervisionAndEngineeringElectricTransmissionExpenses (560) Operation Supervision and Engineering |
|
|
|
85 |
LoadDispatchReliability (561.1) Load Dispatch-Reliability |
|
|
|
86 |
LoadDispatchMonitorAndOperateTransmissionSystem (561.2) Load Dispatch-Monitor and Operate Transmission System |
|
|
|
87 |
LoadDispatchTransmissionServiceAndScheduling (561.3) Load Dispatch-Transmission Service and Scheduling |
|
|
|
88 |
SchedulingSystemControlAndDispatchServices (561.4) Scheduling, System Control and Dispatch Services |
||
|
89 |
ReliabilityPlanningAndStandardsDevelopment (561.5) Reliability, Planning and Standards Development |
|
|
|
90 |
TransmissionServiceStudies (561.6) Transmission Service Studies |
|
|
|
91 |
GenerationInterconnectionStudies (561.7) Generation Interconnection Studies |
|
|
|
92 |
ReliabilityPlanningAndStandardsDevelopmentServices (561.8) Reliability, Planning and Standards Development Services |
||
|
93 |
StationExpensesTransmissionExpense (562) Station Expenses |
|
|
|
93.1 |
OperationOfEnergyStorageEquipmentTransmissionExpense (562.1) Operation of Energy Storage Equipment |
||
|
94 |
OverheadLineExpense (563) Overhead Lines Expenses |
|
|
|
95 |
UndergroundLineExpensesTransmissionExpense (564) Underground Lines Expenses |
||
|
96 |
TransmissionOfElectricityByOthers (565) Transmission of Electricity by Others |
|
|
|
97 |
MiscellaneousTransmissionExpenses (566) Miscellaneous Transmission Expenses |
|
|
|
98 |
RentsTransmissionElectricExpense (567) Rents |
|
|
|
99 |
TransmissionOperationExpense TOTAL Operation (Enter Total of Lines 83 thru 98) |
|
|
|
100 |
TransmissionMaintenanceAbstract Maintenance |
||
|
101 |
MaintenanceSupervisionAndEngineeringElectricTransmissionExpenses (568) Maintenance Supervision and Engineering |
|
|
|
102 |
MaintenanceOfStructuresTransmissionExpense (569) Maintenance of Structures |
|
|
|
103 |
MaintenanceOfComputerHardwareTransmission (569.1) Maintenance of Computer Hardware |
|
|
|
104 |
MaintenanceOfComputerSoftwareTransmission (569.2) Maintenance of Computer Software |
|
|
|
105 |
MaintenanceOfCommunicationEquipmentElectricTransmission (569.3) Maintenance of Communication Equipment |
|
|
|
106 |
MaintenanceOfMiscellaneousRegionalTransmissionPlant (569.4) Maintenance of Miscellaneous Regional Transmission Plant |
||
|
107 |
MaintenanceOfStationEquipmentTransmission (570) Maintenance of Station Equipment |
|
|
|
107.1 |
MaintenanceOfEnergyStorageEquipmentTransmission (570.1) Maintenance of Energy Storage Equipment |
||
|
108 |
MaintenanceOfOverheadLinesTransmission (571) Maintenance of Overhead Lines |
|
|
|
109 |
MaintenanceOfUndergroundLinesTransmission (572) Maintenance of Underground Lines |
|
|
|
110 |
MaintenanceOfMiscellaneousTransmissionPlant (573) Maintenance of Miscellaneous Transmission Plant |
|
|
|
111 |
TransmissionMaintenanceExpenseElectric TOTAL Maintenance (Total of Lines 101 thru 110) |
|
|
|
112 |
TransmissionExpenses TOTAL Transmission Expenses (Total of Lines 99 and 111) |
|
|
|
113 |
RegionalMarketExpensesAbstract 3. REGIONAL MARKET EXPENSES |
||
|
114 |
RegionalMarketExpensesOperationAbstract Operation |
||
|
115 |
OperationSupervision (575.1) Operation Supervision |
||
|
116 |
DayAheadAndRealTimeMarketAdministration (575.2) Day-Ahead and Real-Time Market Facilitation |
||
|
117 |
TransmissionRightsMarketAdministration (575.3) Transmission Rights Market Facilitation |
||
|
118 |
CapacityMarketAdministration (575.4) Capacity Market Facilitation |
||
|
119 |
AncillaryServicesMarketAdministration (575.5) Ancillary Services Market Facilitation |
||
|
120 |
MarketMonitoringAndCompliance (575.6) Market Monitoring and Compliance |
||
|
121 |
MarketFacilitationMonitoringAndComplianceServices (575.7) Market Facilitation, Monitoring and Compliance Services |
||
|
122 |
RentsRegionalMarketExpenses (575.8) Rents |
||
|
123 |
RegionalMarketOperationExpense Total Operation (Lines 115 thru 122) |
||
|
124 |
RegionalMarketExpensesMaintenanceAbstract Maintenance |
||
|
125 |
MaintenanceOfStructuresAndImprovementsRegionalMarketExpenses (576.1) Maintenance of Structures and Improvements |
||
|
126 |
MaintenanceOfComputerHardware (576.2) Maintenance of Computer Hardware |
||
|
127 |
MaintenanceOfComputerSoftware (576.3) Maintenance of Computer Software |
||
|
128 |
MaintenanceOfCommunicationEquipmentRegionalMarketExpenses (576.4) Maintenance of Communication Equipment |
||
|
129 |
MaintenanceOfMiscellaneousMarketOperationPlant (576.5) Maintenance of Miscellaneous Market Operation Plant |
||
|
130 |
RegionalMarketMaintenanceExpense Total Maintenance (Lines 125 thru 129) |
||
|
131 |
RegionalMarketExpenses TOTAL Regional Transmission and Market Operation Expenses (Enter Total of Lines 123 and 130) |
||
|
132 |
DistributionExpensesAbstract 4. DISTRIBUTION EXPENSES |
||
|
133 |
DistributionExpensesOperationAbstract Operation |
||
|
134 |
OperationSupervisionAndEngineeringDistributionExpense (580) Operation Supervision and Engineering |
|
|
|
135 |
LoadDispatching (581) Load Dispatching |
|
|
|
136 |
StationExpensesDistribution (582) Station Expenses |
|
|
|
137 |
OverheadLineExpenses (583) Overhead Line Expenses |
|
|
|
138 |
UndergroundLineExpenses (584) Underground Line Expenses |
|
|
|
138.1 |
OperationOfEnergyStorageEquipmentDistribution (584.1) Operation of Energy Storage Equipment |
||
|
139 |
StreetLightingAndSignalSystemExpenses (585) Street Lighting and Signal System Expenses |
|
|
|
140 |
MeterExpenses (586) Meter Expenses |
|
|
|
141 |
CustomerInstallationsExpenses (587) Customer Installations Expenses |
|
|
|
142 |
MiscellaneousDistributionExpenses (588) Miscellaneous Expenses |
|
|
|
143 |
RentsDistributionExpense (589) Rents |
|
|
|
144 |
DistributionOperationExpensesElectric TOTAL Operation (Enter Total of Lines 134 thru 143) |
|
|
|
145 |
DistributionExpensesMaintenanceAbstract Maintenance |
||
|
146 |
MaintenanceSupervisionAndEngineering (590) Maintenance Supervision and Engineering |
|
|
|
147 |
MaintenanceOfStructuresDistributionExpense (591) Maintenance of Structures |
|
|
|
148 |
MaintenanceOfStationEquipment (592) Maintenance of Station Equipment |
|
|
|
148.1 |
MaintenanceOfEnergyStorageEquipment (592.2) Maintenance of Energy Storage Equipment |
||
|
149 |
MaintenanceOfOverheadLines (593) Maintenance of Overhead Lines |
|
|
|
150 |
MaintenanceOfUndergroundLines (594) Maintenance of Underground Lines |
|
|
|
151 |
MaintenanceOfLineTransformers (595) Maintenance of Line Transformers |
|
|
|
152 |
MaintenanceOfStreetLightingAndSignalSystems (596) Maintenance of Street Lighting and Signal Systems |
|
|
|
153 |
MaintenanceOfMeters (597) Maintenance of Meters |
|
|
|
154 |
MaintenanceOfMiscellaneousDistributionPlant (598) Maintenance of Miscellaneous Distribution Plant |
||
|
155 |
DistributionMaintenanceExpenseElectric TOTAL Maintenance (Total of Lines 146 thru 154) |
|
|
|
156 |
DistributionExpenses TOTAL Distribution Expenses (Total of Lines 144 and 155) |
|
|
|
157 |
CustomerAccountsExpensesAbstract 5. CUSTOMER ACCOUNTS EXPENSES |
||
|
158 |
CustomerAccountsExpensesOperationsAbstract Operation |
||
|
159 |
SupervisionCustomerAccountExpenses (901) Supervision |
|
|
|
160 |
MeterReadingExpenses (902) Meter Reading Expenses |
|
|
|
161 |
CustomerRecordsAndCollectionExpenses (903) Customer Records and Collection Expenses |
|
|
|
162 |
UncollectibleAccounts (904) Uncollectible Accounts |
|
|
|
163 |
MiscellaneousCustomerAccountsExpenses (905) Miscellaneous Customer Accounts Expenses |
|
|
|
164 |
CustomerAccountExpenses TOTAL Customer Accounts Expenses (Enter Total of Lines 159 thru 163) |
|
|
|
165 |
CustomerServiceAndInformationalExpensesAbstract 6. CUSTOMER SERVICE AND INFORMATIONAL EXPENSES |
||
|
166 |
CustomerServiceAndInformationalExpensesOperationAbstract Operation |
||
|
167 |
SupervisionCustomerServiceAndInformationExpenses (907) Supervision |
|
|
|
168 |
CustomerAssistanceExpenses (908) Customer Assistance Expenses |
|
|
|
169 |
InformationalAndInstructionalAdvertisingExpenses (909) Informational and Instructional Expenses |
|
|
|
170 |
MiscellaneousCustomerServiceAndInformationalExpenses (910) Miscellaneous Customer Service and Informational Expenses |
|
|
|
171 |
CustomerServiceAndInformationExpenses TOTAL Customer Service and Information Expenses (Total Lines 167 thru 170) |
|
|
|
172 |
SalesExpenseAbstract 7. SALES EXPENSES |
||
|
173 |
SalesExpenseOperationAbstract Operation |
||
|
174 |
SupervisionSalesExpense (911) Supervision |
|
|
|
175 |
DemonstratingAndSellingExpenses (912) Demonstrating and Selling Expenses |
|
|
|
176 |
AdvertisingExpenses (913) Advertising Expenses |
|
|
|
177 |
MiscellaneousSalesExpenses (916) Miscellaneous Sales Expenses |
|
|
|
178 |
SalesExpenses TOTAL Sales Expenses (Enter Total of Lines 174 thru 177) |
|
|
|
179 |
AdministrativeAndGeneralExpensesAbstract 8. ADMINISTRATIVE AND GENERAL EXPENSES |
||
|
180 |
AdministrativeAndGeneralExpensesOperationAbstract Operation |
||
|
181 |
AdministrativeAndGeneralSalaries (920) Administrative and General Salaries |
|
|
|
182 |
OfficeSuppliesAndExpenses (921) Office Supplies and Expenses |
|
|
|
183 |
AdministrativeExpensesTransferredCredit (Less) (922) Administrative Expenses Transferred-Credit |
|
|
|
184 |
OutsideServicesEmployed (923) Outside Services Employed |
|
|
|
185 |
PropertyInsurance (924) Property Insurance |
|
|
|
186 |
InjuriesAndDamages (925) Injuries and Damages |
|
|
|
187 |
EmployeePensionsAndBenefits (926) Employee Pensions and Benefits |
|
|
|
188 |
FranchiseRequirements (927) Franchise Requirements |
||
|
189 |
RegulatoryCommissionExpenses (928) Regulatory Commission Expenses |
|
|
|
190 |
DuplicateChargesCredit (929) (Less) Duplicate Charges-Cr. |
|
|
|
191 |
GeneralAdvertisingExpenses (930.1) General Advertising Expenses |
|
|
|
192 |
MiscellaneousGeneralExpenses (930.2) Miscellaneous General Expenses |
|
|
|
193 |
RentsAdministrativeAndGeneralExpense (931) Rents |
|
|
|
194 |
AdministrativeAndGeneralOperationExpense TOTAL Operation (Enter Total of Lines 181 thru 193) |
|
|
|
195 |
AdministrativeAndGeneralExpensesMaintenanceAbstract Maintenance |
||
|
196 |
MaintenanceOfGeneralPlant (935) Maintenance of General Plant |
|
|
|
197 |
AdministrativeAndGeneralExpenses TOTAL Administrative & General Expenses (Total of Lines 194 and 196) |
|
|
|
198 |
OperationsAndMaintenanceExpensesElectric TOTAL Electric Operation and Maintenance Expenses (Total of Lines 80, 112, 131, 156, 164, 171, 178, and 197) |
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
PURCHASED POWER (Account 555) |
||||||||||||||
|
||||||||||||||
| Actual Demand (MW) | POWER EXCHANGES | COST/SETTLEMENT OF POWER | ||||||||||||
| Line No. |
NameOfCompanyOrPublicAuthorityProvidingPurchasedPower Name of Company or Public Authority (Footnote Affiliations) (a) |
StatisticalClassificationCode Statistical Classification (b) |
RateScheduleTariffNumber Ferc Rate Schedule or Tariff Number (c) |
AverageMonthlyBillingDemand Average Monthly Billing Demand (MW) (d) |
AverageMonthlyNonCoincidentPeakDemand Average Monthly NCP Demand (e) |
AverageMonthlyCoincidentPeakDemand Average Monthly CP Demand (f) |
MegawattHoursPurchasedOtherThanStorage MegaWatt Hours Purchased (Excluding for Energy Storage) (g) |
MegawattHoursPurchasedForEnergyStorage MegaWatt Hours Purchased for Energy Storage (h) |
EnergyReceivedThroughPowerExchanges MegaWatt Hours Received (i) |
EnergyDeliveredThroughPowerExchanges MegaWatt Hours Delivered (j) |
DemandChargesOfPurchasedPower Demand Charges ($) (k) |
EnergyChargesOfPurchasedPower Energy Charges ($) (l) |
OtherChargesOfPurchasedPower Other Charges ($) (m) |
SettlementOfPower Total (k+l+m) of Settlement ($) (n) |
| 1 | ||||||||||||||
| 2 | (e) |
|||||||||||||
| 3 | ||||||||||||||
| 4 | ||||||||||||||
| 5 | ||||||||||||||
| 6 | ||||||||||||||
| 7 | ||||||||||||||
| 8 | ||||||||||||||
| 9 | ||||||||||||||
| 10 | ||||||||||||||
| 11 | ||||||||||||||
| 12 | ||||||||||||||
| 13 | ||||||||||||||
| 14 | ||||||||||||||
| 15 | ||||||||||||||
| 16 | ||||||||||||||
| 17 | ||||||||||||||
| 18 | ||||||||||||||
| 19 | ||||||||||||||
| 20 | ||||||||||||||
| 21 | ||||||||||||||
| 22 | ||||||||||||||
| 23 | ||||||||||||||
| 24 | ||||||||||||||
| 25 | ||||||||||||||
| 26 | ||||||||||||||
| 27 | ||||||||||||||
| 28 | ||||||||||||||
| 29 | ||||||||||||||
| 30 | (a) |
|||||||||||||
| 31 | ||||||||||||||
| 32 | ||||||||||||||
| 33 | ||||||||||||||
| 34 | ||||||||||||||
| 35 | ||||||||||||||
| 36 | ||||||||||||||
| 37 | ||||||||||||||
| 38 | ||||||||||||||
| 39 | ||||||||||||||
| 40 | ||||||||||||||
| 41 | ||||||||||||||
| 42 | ||||||||||||||
| 43 | ||||||||||||||
| 44 | ||||||||||||||
| 45 | ||||||||||||||
| 46 | ||||||||||||||
| 47 | ||||||||||||||
| 48 | ||||||||||||||
| 49 | ||||||||||||||
| 50 | ||||||||||||||
| 51 | ||||||||||||||
| 52 | ||||||||||||||
| 53 | ||||||||||||||
| 54 | ||||||||||||||
| 55 | ||||||||||||||
| 56 | ||||||||||||||
| 57 | ||||||||||||||
| 58 | ||||||||||||||
| 59 | ||||||||||||||
| 60 | ||||||||||||||
| 61 | ||||||||||||||
| 62 | ||||||||||||||
| 63 | ||||||||||||||
| 64 | ||||||||||||||
| 65 | ||||||||||||||
| 66 | ||||||||||||||
| 67 | ||||||||||||||
| 68 | ||||||||||||||
| 69 | ||||||||||||||
| 70 | ||||||||||||||
| 71 | ||||||||||||||
| 72 | ||||||||||||||
| 73 | ||||||||||||||
| 74 | ||||||||||||||
| 75 | ||||||||||||||
| 76 | ||||||||||||||
| 77 | ||||||||||||||
| 78 | ||||||||||||||
| 79 | ||||||||||||||
| 80 | ||||||||||||||
| 81 | ||||||||||||||
| 82 | ||||||||||||||
| 83 | ||||||||||||||
| 84 | (b) |
|||||||||||||
| 85 | ||||||||||||||
| 86 | (c) |
|||||||||||||
| 87 | (d) |
|||||||||||||
| 88 | ||||||||||||||
| 89 | ||||||||||||||
| 90 | ||||||||||||||
| 91 | ||||||||||||||
| 92 | ||||||||||||||
| 93 | ||||||||||||||
| 94 | ||||||||||||||
| 95 | ||||||||||||||
| 96 | ||||||||||||||
| 97 | ||||||||||||||
| 98 | ||||||||||||||
| 99 | ||||||||||||||
| 15 | TOTAL |
|
|
|
|
|
|
|||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: NameOfCompanyOrPublicAuthorityProvidingPurchasedPower |
Renewable programs are related to Renewable Energy Development Initiative Utility Scale Requests for Proposal and Simple Solar programs implementation and administrative costs.
|
| (b) Concept: NameOfCompanyOrPublicAuthorityProvidingPurchasedPower |
Southern Company Services is a subsidiary of Southern Company.
|
| (c) Concept: NameOfCompanyOrPublicAuthorityProvidingPurchasedPower |
Southern Electric Generating Company is 50% owned by each of Georgia Power and Alabama Power. Prior year amounts were included in totals reported for Southern Company Services.
|
| (d) Concept: NameOfCompanyOrPublicAuthorityProvidingPurchasedPower |
Southern Power Company is a subsidiary of Southern Company.
|
| (e) Concept: StatisticalClassificationCode |
OS-Unless indicated by FERC Rate Schedule Number, these are market-based purchases of non-firm energy from power marketing companies that have applications on file with the FERC.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
TRANSMISSION OF ELECTRICITY FOR OTHERS (Account 456.1) (Including transactions referred to as "wheeling") |
||||||||||||||
|
||||||||||||||
| TRANSFER OF ENERGY | REVENUE FROM TRANSMISSION OF ELECTRICITY FOR OTHERS | |||||||||||||
| Line No. |
PaymentByCompanyOrPublicAuthority Payment By (Company of Public Authority) (Footnote Affiliation) (a) |
TransmissionEnergyReceivedFromCompanyOrPublicAuthorityName Energy Received From (Company of Public Authority) (Footnote Affiliation) (b) |
TransmissionEnergyDeliveredToCompanyOrPublicAuthorityName Energy Delivered To (Company of Public Authority) (Footnote Affiliation) (c) |
StatisticalClassificationCode Statistical Classification (d) |
RateScheduleTariffNumber Ferc Rate Schedule of Tariff Number (e) |
TransmissionPointOfReceipt Point of Receipt (Substation or Other Designation) (f) |
TransmissionPointOfDelivery Point of Delivery (Substation or Other Designation) (g) |
BillingDemand Billing Demand (MW) (h) |
TransmissionOfElectricityForOthersEnergyReceived Megawatt Hours Received (i) |
TransmissionOfElectricityForOthersEnergyDelivered Megawatt Hours Delivered (j) |
Demand Charges ($) (k) |
Energy Charges ($) (l) |
Other Charges ($) (m) |
RevenuesFromTransmissionOfElectricityForOthers Total Revenues ($) (k+l+m) (n) |
| 1 |
|
|
|
|
(q) |
|
|
|
(x) |
(ab) |
(ag) |
|
(ai) |
|
| 2 |
|
|
|
|
(r) |
|
|
(u) |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11 |
|
|
|
(d) |
|
|
|
|
(y) |
(ac) |
|
|
|
|
| 12 |
|
|
|
(e) |
|
|
|
|
|
|
|
|
|
|
| 13 |
|
|
|
(f) |
|
|
|
|
|
|
|
|
|
|
| 14 |
|
|
|
(g) |
|
|
|
|
|
|
|
|
|
|
| 15 |
|
|
|
(h) |
|
|
|
|
|
|
|
|
|
|
| 16 |
|
|
|
(i) |
|
|
|
|
|
|
|
|
|
|
| 17 |
|
|
|
(j) |
|
|
|
|
|
|
|
|
|
|
| 18 |
|
|
|
(k) |
|
|
|
|
|
|
|
|
|
|
| 19 |
|
|
|
(l) |
|
|
|
|
|
|
|
|
|
|
| 20 |
|
|
|
(m) |
|
|
|
|
|
|
|
|
|
|
| 21 |
|
|
|
(n) |
|
|
|
|
|
|
|
|
|
|
| 22 |
|
|
|
(o) |
|
|
|
|
|
|
|
|
|
|
| 23 |
|
|
|
(p) |
|
|
|
|
|
|
|
|
|
|
| 24 |
(a) |
(c) |
|
|
|
(s) |
(t) |
(v) |
(z) |
(ad) |
|
|
|
|
| 25 |
(b) |
|
|
|
|
|
|
(w) |
(aa) |
(ae) |
|
|
|
|
| 26 |
|
|
|
|
|
|
|
|
|
|
|
|
(aj) |
|
| 27 |
|
|
|
|
|
|
|
|
|
(af) |
(ah) |
|
|
|
| 35 | TOTAL |
|
|
|
|
|
|
|
||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: PaymentByCompanyOrPublicAuthority |
| (b) Concept: PaymentByCompanyOrPublicAuthority |
| (c) Concept: TransmissionEnergyReceivedFromCompanyOrPublicAuthorityName |
| (d) Concept: StatisticalClassificationCode |
| (e) Concept: StatisticalClassificationCode |
| (f) Concept: StatisticalClassificationCode |
| (g) Concept: StatisticalClassificationCode |
| (h) Concept: StatisticalClassificationCode |
| (i) Concept: StatisticalClassificationCode |
| (j) Concept: StatisticalClassificationCode |
| (k) Concept: StatisticalClassificationCode |
| (l) Concept: StatisticalClassificationCode |
| (m) Concept: StatisticalClassificationCode |
| (n) Concept: StatisticalClassificationCode |
| (o) Concept: StatisticalClassificationCode |
| (p) Concept: StatisticalClassificationCode |
| (q) Concept: RateScheduleTariffNumber |
Schedule Page: _____ Line Nos. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 Column: i
|
| (r) Concept: RateScheduleTariffNumber |
FERC Electric Tariff Fourth Revised Volume No. 5, the "Tariff." |
| (s) Concept: TransmissionPointOfReceipt |
| (t) Concept: TransmissionPointOfDelivery |
| (u) Concept: BillingDemand |
| (v) Concept: BillingDemand |
| (w) Concept: BillingDemand |
| (x) Concept: TransmissionOfElectricityForOthersEnergyReceived |
| (y) Concept: TransmissionOfElectricityForOthersEnergyReceived |
| (z) Concept: TransmissionOfElectricityForOthersEnergyReceived |
| (aa) Concept: TransmissionOfElectricityForOthersEnergyReceived |
| (ab) Concept: TransmissionOfElectricityForOthersEnergyDelivered |
| (ac) Concept: TransmissionOfElectricityForOthersEnergyDelivered |
| (ad) Concept: TransmissionOfElectricityForOthersEnergyDelivered |
| (ae) Concept: TransmissionOfElectricityForOthersEnergyDelivered |
| (af) Concept: TransmissionOfElectricityForOthersEnergyDelivered |
| (ag) Concept: DemandChargesRevenueTransmissionOfElectricityForOthers |
| (ah) Concept: DemandChargesRevenueTransmissionOfElectricityForOthers |
| (ai) Concept: OtherChargesRevenueTransmissionOfElectricityForOthers |
| (aj) Concept: OtherChargesRevenueTransmissionOfElectricityForOthers |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
TRANSMISSION OF ELECTRICITY BY ISO/RTOs |
|||||
|
|||||
| Line No. |
Payment Received by (Transmission Owner Name) (a) |
Statistical Classification (b) |
FERC Rate Schedule or Tariff Number (c) |
Total Revenue by Rate Schedule or Tariff (d) |
Total Revenue (e) |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| 11 | |||||
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 | |||||
| 31 | |||||
| 32 | |||||
| 33 | |||||
| 34 | |||||
| 35 | |||||
| 36 | |||||
| 37 | |||||
| 38 | |||||
| 39 | |||||
| 40 | |||||
| 41 | |||||
| 42 | |||||
| 43 | |||||
| 44 | |||||
| 45 | |||||
| 46 | |||||
| 47 | |||||
| 48 | |||||
| 49 | |||||
| 40 |
TOTAL |
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
TRANSMISSION OF ELECTRICITY BY OTHERS (Account 565) |
||||||||
|
||||||||
| TRANSFER OF ENERGY | EXPENSES FOR TRANSMISSION OF ELECTRICITY BY OTHERS | |||||||
| Line No. |
NameOfCompanyOrPublicAuthorityTransmissionOfElectricityByOthers Name of Company or Public Authority (Footnote Affiliations) (a) |
StatisticalClassificationCode Statistical Classification (b) |
TransmissionOfElectricityByOthersEnergyReceived MegaWatt Hours Received (c) |
TransmissionOfElectricityByOthersEnergyDelivered MegaWatt Hours Delivered (d) |
DemandChargesTransmissionOfElectricityByOthers Demand Charges ($) (e) |
EnergyChargesTransmissionOfElectricityByOthers Energy Charges ($) (f) |
OtherChargesTransmissionOfElectricityByOthers Other Charges ($) (g) |
ChargesForTransmissionOfElectricityByOthers Total Cost of Transmission ($) (h) |
| 1 |
|
|
|
|
|
|||
| 2 |
|
|
|
|
|
|||
| 3 |
|
|
|
|
|
|||
| 4 |
|
|
|
|
|
|||
| 5 |
|
|
|
|
|
|||
| 6 |
|
|
|
|
|
|||
| 7 |
|
|
|
|
||||
| 8 |
|
|
|
|
||||
| 9 |
|
|
|
|||||
| 10 |
|
|
|
|
||||
|
TOTAL |
|
|
|
|||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
MISCELLANEOUS GENERAL EXPENSES (Account 930.2) (ELECTRIC) |
||
| Line No. |
Description (a) |
Amount (b) |
| 1 |
IndustryAssociationDues
Industry Association Dues
|
|
| 2 |
NuclearPowerResearchExpenses
Nuclear Power Research Expenses
|
|
| 3 |
OtherExperimentalAndGeneralResearchExpenses
Other Experimental and General Research Expenses
|
|
| 4 |
PublicationAndDistributionExpensesForSecuritiesToStockholders
Pub and Dist Info to Stkhldrs...expn servicing outstanding Securities
|
|
| 5 |
OtherMiscellaneousGeneralExpenses
Oth Expn greater than or equal to 5,000 show purpose, recipient, amount. Group if less than $5,000
|
|
| 6 |
|
|
| 7 |
|
|
| 8 |
|
|
| 9 |
|
|
| 10 |
|
|
| 11 |
|
|
| 12 |
|
|
| 46 |
MiscellaneousGeneralExpenses
TOTAL
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Depreciation and Amortization of Electric Plant (Account 403, 404, 405) |
||||||
|
||||||
| A. Summary of Depreciation and Amortization Charges | ||||||
| Line No. |
FunctionalClassificationAxis Functional Classification (a) |
DepreciationExpenseExcludingAmortizationOfAcquisitionAdjustments Depreciation Expense (Account 403) (b) |
DepreciationExpenseForAssetRetirementCostsExcludingAmortizationgOfAcquisitionAdjustments Depreciation Expense for Asset Retirement Costs (Account 403.1) (c) |
AmortizationOfLimitedTermPlantOrProperty Amortization of Limited Term Electric Plant (Account 404) (d) |
AmortizationOfOtherElectricPlant Amortization of Other Electric Plant (Acc 405) (e) |
DepreciationAndAmortization Total (f) |
| 1 |
Intangible Plant |
|
|
|||
| 2 |
Steam Production Plant |
|
|
|
||
| 3 |
Nuclear Production Plant |
|
|
|
||
| 4 |
Hydraulic Production Plant-Conventional |
|
|
|
||
| 5 |
Hydraulic Production Plant-Pumped Storage |
|
|
|||
| 6 |
Other Production Plant |
|
|
|
||
| 7 |
Transmission Plant |
|
|
|
||
| 8 |
Distribution Plant |
|
|
|
||
| 9 |
Regional Transmission and Market Operation |
|||||
| 10 |
General Plant |
|
|
|
||
| 11 |
Common Plant-Electric |
|||||
| 12 |
TOTAL |
(a) |
|
|
|
|
| B. Basis for Amortization Charges | ||||||
| C. Factors Used in Estimating Depreciation Charges | ||||||||
| Line No. |
AccountNumberFactorsUsedInEstimatingDepreciationCharges Account No. (a) |
DepreciablePlantBase Depreciable Plant Base (in Thousands) (b) |
UtilityPlantEstimatedAverageServiceLife Estimated Avg. Service Life (c) |
UtilityPlantNetSalvageValuePercentage Net Salvage (Percent) (d) |
UtilityPlantAppliedDepreciationRate Applied Depr. Rates (Percent) (e) |
MortalityCurveType Mortality Curve Type (f) |
UtilityPlantWeightedAverageRemainingLife Average Remaining Life (g) |
|
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| 16 | ||||||||
| 17 | ||||||||
| 18 | ||||||||
| 19 | ||||||||
| 20 | ||||||||
| 21 | ||||||||
| 22 | ||||||||
| 23 | ||||||||
| 24 | ||||||||
| 25 | ||||||||
| 26 | ||||||||
| 27 | ||||||||
| 28 | ||||||||
| 29 | ||||||||
| 30 | ||||||||
| 31 | ||||||||
| 32 | ||||||||
| 33 | ||||||||
| 34 | ||||||||
| 35 | ||||||||
| 36 | ||||||||
| 37 | ||||||||
| 38 | ||||||||
| 39 | ||||||||
| 40 | ||||||||
| 41 | ||||||||
| 42 | ||||||||
| 43 | ||||||||
| 44 | ||||||||
| 45 | ||||||||
| 46 | ||||||||
| 47 | ||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: DepreciationExpenseExcludingAmortizationOfAcquisitionAdjustments |
1)
The depreciable base is calculated as an average of beginning and ending plant in service balances.
2)
The average remaining service life is presented as of the measurement date used in the study to compute the depreciation rates used in the current year.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
REGULATORY COMMISSION EXPENSES |
||||||||||||
|
||||||||||||
| EXPENSES INCURRED DURING YEAR | AMORTIZED DURING YEAR | |||||||||||
| CURRENTLY CHARGED TO | ||||||||||||
| Line No. |
RegulatoryCommissionDescription Description (Furnish name of regulatory commission or body the docket or case number and a description of the case) (a) |
RegulatoryExpensesAssessedByRegulatoryCommission Assessed by Regulatory Commission (b) |
RegulatoryExpensesOfUtility Expenses of Utility (c) |
RegulatoryCommissionExpensesAmount Total Expenses for Current Year (b) + (c) (d) |
OtherRegulatoryAssetsRegulatoryCommissionExpenses Deferred in Account 182.3 at Beginning of Year (e) |
NameOfDepartmentRegulatoryCommissionExpensesCharged Department (f) |
AccountNumberRegulatoryCommissionExpensesCharged Account No. (g) |
RegulatoryComissionExpensesIncurredAndCharged Amount (h) |
RegulatoryCommissionExpensesDeferredToOtherRegulatoryAssets Deferred to Account 182.3 (i) |
DeferredRegulatoryCommissionExpensesAmortizedInContraAccount Contra Account (j) |
DeferredRegulatoryCommissionExpensesAmortized Amount (k) |
OtherRegulatoryAssetsRegulatoryCommissionExpenses Deferred in Account 182.3 End of Year (l) |
| 1 |
|
|
|
|
|
|
||||||
| 2 |
|
|
|
|
|
|
||||||
| 3 |
|
|
|
|
|
|
||||||
| 4 |
|
|
|
|
|
|
||||||
| 5 |
|
|
|
|
|
|
||||||
| 6 |
|
|
|
|
|
|
||||||
| 7 |
|
|
|
|
|
|
||||||
| 8 |
|
|
|
|
|
|
||||||
| 9 |
|
|
|
|
|
|
||||||
| 10 |
|
|
|
|
|
|
||||||
| 11 |
|
|
|
|
|
|
||||||
| 12 |
|
|
|
|
|
|
||||||
| 13 |
|
|
|
|
|
|
||||||
| 14 |
|
|
||||||||||
| 46 |
TOTAL |
|
|
|
||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
RESEARCH, DEVELOPMENT, AND DEMONSTRATION ACTIVITIES |
|||||||
|
|||||||
| AMOUNTS CHARGED IN CURRENT YEAR | |||||||
| Line No. |
ResearchDevelopmentAndDemonstrationClassification Classification (a) |
ResearchDevelopmentAndDemonstrationDescription Description (b) |
ResearchDevelopmentAndDemonstrationCostsIncurredInternally Costs Incurred Internally Current Year (c) |
ResearchDevelopmentAndDemonstrationCostsIncurredExternally Costs Incurred Externally Current Year (d) |
AccountNumberForResearchDevelopmentAndDemonstrationCosts Amounts Charged In Current Year: Account (e) |
ResearchDevelopmentAndDemonstrationCosts Amounts Charged In Current Year: Amount (f) |
ResearchDevelopmentAndDemonstrationExpenditures Unamortized Accumulation (g) |
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 | |||||||
| 6 | |||||||
| 7 | |||||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| 12 | |||||||
| 13 | |||||||
| 14 | |||||||
| 15 | |||||||
| 16 | |||||||
| 17 | |||||||
| 18 | |||||||
| 19 | |||||||
| 20 | |||||||
| 21 | |||||||
| 22 | |||||||
| 23 | |||||||
| 24 | |||||||
| 25 | |||||||
| 26 | |||||||
| 27 | |||||||
| 28 | |||||||
| 29 | |||||||
| 30 | |||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
DISTRIBUTION OF SALARIES AND WAGES |
|||||
|
Report below the distribution of total salaries and wages for the year. Segregate amounts originally charged to clearing accounts to Utility Departments, Construction, Plant Removals, and Other Accounts, and enter such amounts in the appropriate lines and columns provided. In determining this segregation of salaries and wages originally charged to clearing accounts, a method of approximation giving substantially correct results may be used. |
|||||
| Line No. |
Classification (a) |
Direct Payroll Distribution (b) |
Allocation of Payroll Charged for Clearing Accounts (c) |
Total (d) |
|
|
1 |
SalariesAndWagesElectricAbstract Electric |
||||
|
2 |
SalariesAndWagesElectricOperationAbstract Operation |
||||
|
3 |
SalariesAndWagesElectricOperationProduction Production |
|
|||
|
4 |
SalariesAndWagesElectricOperationTransmission Transmission |
|
|||
|
5 |
SalariesAndWagesElectricOperationRegionalMarket Regional Market |
||||
|
6 |
SalariesAndWagesElectricOperationDistribution Distribution |
|
|||
|
7 |
SalariesAndWagesElectricOperationCustomerAccounts Customer Accounts |
|
|||
|
8 |
SalariesAndWagesElectricOperationCustomerServiceAndInformational Customer Service and Informational |
|
|||
|
9 |
SalariesAndWagesElectricOperationSales Sales |
|
|||
|
10 |
SalariesAndWagesElectricOperationAdministrativeAndGeneral Administrative and General |
|
|||
|
11 |
SalariesAndWagesElectricOperation TOTAL Operation (Enter Total of lines 3 thru 10) |
|
|||
|
12 |
SalariesAndWagesElectricMaintenanceAbstract Maintenance |
||||
|
13 |
SalariesAndWagesElectricMaintenanceProduction Production |
|
|||
|
14 |
SalariesAndWagesElectricMaintenanceTransmission Transmission |
|
|||
|
15 |
SalariesAndWagesElectricMaintenanceRegionalMarket Regional Market |
||||
|
16 |
SalariesAndWagesElectricMaintenanceDistribution Distribution |
|
|||
|
17 |
SalariesAndWagesElectricMaintenanceAdministrativeAndGeneral Administrative and General |
|
|||
|
18 |
SalariesAndWagesElectricMaintenance TOTAL Maintenance (Total of lines 13 thru 17) |
|
|||
|
19 |
SalariesAndWagesElectricOperationAndMaintenanceAbstract Total Operation and Maintenance |
||||
|
20 |
SalariesAndWagesElectricProduction Production (Enter Total of lines 3 and 13) |
|
|||
|
21 |
SalariesAndWagesElectricTransmission Transmission (Enter Total of lines 4 and 14) |
|
|||
|
22 |
SalariesAndWagesElectricRegionalMarket Regional Market (Enter Total of Lines 5 and 15) |
||||
|
23 |
SalariesAndWagesElectricDistribution Distribution (Enter Total of lines 6 and 16) |
|
|||
|
24 |
SalariesAndWagesElectricCustomerAccounts Customer Accounts (Transcribe from line 7) |
|
|||
|
25 |
SalariesAndWagesElectricCustomerServiceAndInformational Customer Service and Informational (Transcribe from line 8) |
|
|||
|
26 |
SalariesAndWagesElectricSales Sales (Transcribe from line 9) |
|
|||
|
27 |
SalariesAndWagesElectricAdministrativeAndGeneral Administrative and General (Enter Total of lines 10 and 17) |
|
|||
|
28 |
SalariesAndWagesElectricOperationAndMaintenance TOTAL Oper. and Maint. (Total of lines 20 thru 27) |
|
|
|
|
|
29 |
SalariesAndWagesGasAbstract Gas |
||||
|
30 |
SalariesAndWagesGasOperationAbstract Operation |
||||
|
31 |
SalariesAndWagesGasOperationProductionManufacturedGas Production - Manufactured Gas |
||||
|
32 |
SalariesAndWagesGasOperationProductionNaturalGas Production-Nat. Gas (Including Expl. And Dev.) |
||||
|
33 |
SalariesAndWagesGasOperationOtherGasSupply Other Gas Supply |
||||
|
34 |
SalariesAndWagesGasOperationStorageLiquifiedNaturalGasTerminalingAndProcessing Storage, LNG Terminaling and Processing |
||||
|
35 |
SalariesAndWagesGasOperationTransmission Transmission |
||||
|
36 |
SalariesAndWagesGasOperationDistribution Distribution |
||||
|
37 |
SalariesAndWagesGasCustomerAccounts Customer Accounts |
||||
|
38 |
SalariesAndWagesGasCustomerServiceAndInformational Customer Service and Informational |
||||
|
39 |
SalariesAndWagesGasSales Sales |
||||
|
40 |
SalariesAndWagesGasOperationAdministrativeAndGeneral Administrative and General |
||||
|
41 |
SalariesAndWagesGasOperation TOTAL Operation (Enter Total of lines 31 thru 40) |
||||
|
42 |
SalariesAndWagesGasMaintenanceAbstract Maintenance |
||||
|
43 |
SalariesAndWagesGasMaintenanceProductionManufacturedGas Production - Manufactured Gas |
||||
|
44 |
SalariesAndWagesGasMaintenanceProductionNaturalGas Production-Natural Gas (Including Exploration and Development) |
||||
|
45 |
SalariesAndWagesGasMaintenanceOtherGasSupply Other Gas Supply |
||||
|
46 |
SalariesAndWagesGasMaintenanceStorageLngTerminalingAndProcessing Storage, LNG Terminaling and Processing |
||||
|
47 |
SalariesAndWagesGasMaintenanceTransmission Transmission |
||||
|
48 |
SalariesAndWagesGasMaintenanceDistribution Distribution |
||||
|
49 |
SalariesAndWagesGasMaintenanceAdministrativeAndGeneral Administrative and General |
||||
|
50 |
SalariesAndWagesGasMaintenance TOTAL Maint. (Enter Total of lines 43 thru 49) |
||||
|
51 |
SalariesAndWagesGasOperationAndMaintenanceAbstract Total Operation and Maintenance |
||||
|
52 |
SalariesAndWagesGasProductionManufacturedGas Production-Manufactured Gas (Enter Total of lines 31 and 43) |
||||
|
53 |
SalariesAndWagesGasProductionNaturalGas Production-Natural Gas (Including Expl. and Dev.) (Total lines 32, |
||||
|
54 |
SalariesAndWagesGasOtherGasSupply Other Gas Supply (Enter Total of lines 33 and 45) |
||||
|
55 |
SalariesAndWagesGasStorageLngTerminalingAndProcessing Storage, LNG Terminaling and Processing (Total of lines 31 thru |
||||
|
56 |
SalariesAndWagesGasTransmission Transmission (Lines 35 and 47) |
||||
|
57 |
SalariesAndWagesGasDistribution Distribution (Lines 36 and 48) |
||||
|
58 |
SalariesAndWagesGasCustomerAccounts Customer Accounts (Line 37) |
||||
|
59 |
SalariesAndWagesGasCustomerServiceAndInformational Customer Service and Informational (Line 38) |
||||
|
60 |
SalariesAndWagesGasSales Sales (Line 39) |
||||
|
61 |
SalariesAndWagesGasAdministrativeAndGeneral Administrative and General (Lines 40 and 49) |
||||
|
62 |
SalariesAndWagesGasOperationAndMaintenance TOTAL Operation and Maint. (Total of lines 52 thru 61) |
||||
|
63 |
SalariesAndWagesOtherUtilityDepartmentsAbstract Other Utility Departments |
||||
|
64 |
SalariesAndWagesOtherUtilityDepartmentsOperationAndMaintenance Operation and Maintenance |
||||
|
65 |
SalariesAndWagesOperationsAndMaintenance TOTAL All Utility Dept. (Total of lines 28, 62, and 64) |
|
|
|
|
|
66 |
SalariesAndWagesUtilityPlantAbstract Utility Plant |
||||
|
67 |
SalariesAndWagesUtilityPlantConstructionAbstract Construction (By Utility Departments) |
||||
|
68 |
SalariesAndWagesUtilityPlantConstructionElectricPlant Electric Plant |
|
|
|
|
|
69 |
SalariesAndWagesUtilityPlantConstructionGasPlant Gas Plant |
||||
|
70 |
SalariesAndWagesUtilityPlantConstructionOther Other (provide details in footnote): |
||||
|
71 |
SalariesAndWagesUtilityPlantConstruction TOTAL Construction (Total of lines 68 thru 70) |
|
|
|
|
|
72 |
SalariesAndWagesPlantRemovalAbstract Plant Removal (By Utility Departments) |
||||
|
73 |
SalariesAndWagesPlantRemovalElectricPlant Electric Plant |
||||
|
74 |
SalariesAndWagesPlantRemovalGasPlant Gas Plant |
||||
|
75 |
SalariesAndWagesPlantRemovalOther Other (provide details in footnote): |
||||
|
76 |
SalariesAndWagesPlantRemoval TOTAL Plant Removal (Total of lines 73 thru 75) |
||||
|
77 |
SalariesAndWagesOtherAccountsAbstract Other Accounts (Specify, provide details in footnote): |
||||
|
78 |
SalariesAndWagesOtherAccountsDescription |
||||
|
79 |
SalariesAndWagesOtherAccountsDescription |
|
|
|
|
|
80 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
81 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
82 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
83 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
84 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
85 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
86 |
SalariesAndWagesOtherAccountsDescription |
|
|
|
|
|
87 |
SalariesAndWagesOtherAccountsDescription |
|
|
||
|
88 |
SalariesAndWagesOtherAccountsDescription |
||||
|
89 |
SalariesAndWagesOtherAccountsDescription |
||||
|
90 |
SalariesAndWagesOtherAccountsDescription |
||||
|
91 |
SalariesAndWagesOtherAccountsDescription |
||||
|
92 |
SalariesAndWagesOtherAccountsDescription |
||||
|
93 |
SalariesAndWagesOtherAccountsDescription |
||||
|
94 |
SalariesAndWagesOtherAccountsDescription |
||||
|
95 |
SalariesAndWagesOtherAccounts TOTAL Other Accounts |
|
|
|
|
|
96 |
SalariesAndWagesGeneralExpense TOTAL SALARIES AND WAGES |
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
COMMON UTILITY PLANT AND EXPENSES |
||||
|
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
AMOUNTS INCLUDED IN ISO/RTO SETTLEMENT STATEMENTS |
|||||
|
|||||
| Line No. |
Description of Item(s) (a) |
Balance at End of Quarter 1 (b) |
Balance at End of Quarter 2 (c) |
Balance at End of Quarter 3 (d) |
Balance at End of Year (e) |
| 1 | Energy | ||||
| 2 | Net Purchases (Account 555) |
(a) |
|
|
|
| 2.1 | Net Purchases (Account 555.1) | ||||
| 3 | Net Sales (Account 447) |
|
|
|
|
| 4 | Transmission Rights |
|
|
|
|
| 5 | Ancillary Services |
|
|
|
|
| 6 | Other Items (list separately) | ||||
| 7 |
|
|
|
|
|
| 8 |
|
|
|
|
|
| 9 |
|
|
|
|
|
| 46 | TOTAL |
|
|
|
(b) |
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: IsoOrRtoSettlementsEnergyNetPurchasesPurchasedPower |
Line Nos. 1-9 Columns: b-e
These amounts represent Georgia Power’s portion of the RTO settlement statements received by Southern Company Services. RTO settlement statements received by Southern Company Services include amounts allocated to Alabama Power, Georgia Power, Mississippi Power, and Southern Power Company.
|
| (b) Concept: IsoOrRtoSettlements |
The amounts presented agree with settlement statements received and do not include adjustments from other periods that might have been booked.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
PURCHASES AND SALES OF ANCILLARY SERVICES |
|||||||
|
Report the amounts for each type of ancillary service shown in column (a) for the year as specified in Order No. 888 and defined in the respondents Open Access Transmission Tariff. In columns for usage, report usage-related billing determinant and the unit of measure.
|
|||||||
| Amount Purchased for the Year | Amount Sold for the Year | ||||||
| Usage - Related Billing Determinant | Usage - Related Billing Determinant | ||||||
| Line No. |
Type of Ancillary Service (a) |
Number of Units (b) |
Unit of Measure (c) |
Dollar (d) |
Number of Units (e) |
Unit of Measure (f) |
Dollars (g) |
| 1 |
Scheduling, System Control and Dispatch |
|
|
(a) |
|
|
|
| 2 |
Reactive Supply and Voltage |
|
|
|
|
|
|
| 3 |
Regulation and Frequency Response |
|
|
|
|
|
|
| 4 |
Energy Imbalance |
|
|
|
|
|
|
| 5 |
Operating Reserve - Spinning |
|
|
|
|
|
|
| 6 |
Operating Reserve - Supplement |
|
|
|
|
|
|
| 7 |
Other |
(b) |
|
|
|
|
|
| 8 |
Total (Lines 1 thru 7) |
|
|
|
|
||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: AncillaryServicesPurchasedAmount |
Line No. 1-6 column: d, g
The Southern Company electric operating companies (Alabama Power Company, Georgia Power Company, and Mississippi Power Company) collectively are the Transmission Provider under the Open Access Transmission Tariff (OATT) and operate their transmission facilities as a single integrated system. The ancillary services, sales, and purchase amounts associated with transmission service provided under the OATT are the total values for the Southern Company electric operating companies.
|
| (b) Concept: AncillaryServicesPurchasedNumberOfUnits |
Line No. 7 column: b,d,e,g
Generator Imbalance Service (Schedule 10) offered under the OATT.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
MONTHLY TRANSMISSION SYSTEM PEAK LOAD |
||||||||||
|
||||||||||
| Line No. |
Month (a) |
Monthly Peak MW - Total (b) |
Day of Monthly Peak (c) |
Hour of Monthly Peak (d) |
Firm Network Service for Self (e) |
Firm Network Service for Others (f) |
Long-Term Firm Point-to-point Reservations (g) |
Other Long-Term Firm Service (h) |
Short-Term Firm Point-to-point Reservation (i) |
Other Service (j) |
NAME OF SYSTEM: Georgia Power Company |
||||||||||
1 |
January |
(a) |
||||||||
2 |
February |
|
||||||||
3 |
March |
|
||||||||
4 |
Total for Quarter 1 |
|||||||||
5 |
April |
|
||||||||
6 |
May |
|
||||||||
7 |
June |
|
||||||||
8 |
Total for Quarter 2 |
|||||||||
9 |
July |
|
||||||||
10 |
August |
|
||||||||
11 |
September |
|
||||||||
12 |
Total for Quarter 3 |
|||||||||
13 |
October |
|
||||||||
14 |
November |
|
||||||||
15 |
December |
|
||||||||
16 |
Total for Quarter 4 |
|||||||||
17 |
Total |
|||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: MonthlyPeakLoadExcludingIsoAndRto |
The Southern Company electric operating companies (Alabama Power Company, Georgia Power Company, and Mississippi Power Company) collectively are the Transmission Provider under the Open Access Transmission Tariff and operate their transmission facilities as a single integrated system. Values shown correspond to the total transmission system peak loads on the Southern Company transmission system. Estimated load values are shown. The estimated loads are based on the customer's peak demand for previous month. Values are also based on telemetered load values using preliminary peak day and hour. The peak day and hour could change when actual loads are available.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Monthly ISO/RTO Transmission System Peak Load |
||||||||||
|
||||||||||
| Line No. |
Month (a) |
Monthly Peak MW - Total (b) |
Day of Monthly Peak (c) |
Hour of Monthly Peak (d) |
Import into ISO/RTO (e) |
Exports from ISO/RTO (f) |
Through and Out Service (g) |
Network Service Usage (h) |
Point-to-Point Service Usage (i) |
Total Usage (j) |
NAME OF SYSTEM: Enter System |
||||||||||
1 |
January |
|||||||||
2 |
February |
|||||||||
3 |
March |
|||||||||
4 |
Total for Quarter 1 |
|||||||||
5 |
April |
|||||||||
6 |
May |
|||||||||
7 |
June |
|||||||||
8 |
Total for Quarter 2 |
|||||||||
9 |
July |
|||||||||
10 |
August |
|||||||||
11 |
September |
|||||||||
12 |
Total for Quarter 3 |
|||||||||
13 |
October |
|||||||||
14 |
November |
|||||||||
15 |
December |
|||||||||
16 |
Total for Quarter 4 |
|||||||||
17 |
Total Year to Date/Year |
|||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
ELECTRIC ENERGY ACCOUNT |
|||||
|
Report below the information called for concerning the disposition of electric energy generated, purchased, exchanged and wheeled during the year. |
|||||
| Line No. |
Item
(a)
|
MegaWatt Hours
(b)
|
Line No. |
Item
(a)
|
MegaWatt Hours
(b)
|
| 1 |
SOURCES OF ENERGY |
21 |
DISPOSITION OF ENERGY |
||
| 2 |
Generation (Excluding Station Use): |
22 |
Sales to Ultimate Consumers (Including Interdepartmental Sales) |
|
|
| 3 |
Steam |
|
23 |
Requirements Sales for Resale (See instruction 4, page 311.) |
|
| 4 |
Nuclear |
|
24 |
Non-Requirements Sales for Resale (See instruction 4, page 311.) |
|
| 5 |
Hydro-Conventional |
|
25 |
Energy Furnished Without Charge |
|
| 6 |
Hydro-Pumped Storage |
|
26 |
Energy Used by the Company (Electric Dept Only, Excluding Station Use) |
|
| 7 |
Other |
|
27 |
Total Energy Losses |
|
| 8 |
Less Energy for Pumping |
|
27.1 |
Total Energy Stored |
|
| 9 |
Net Generation (Enter Total of lines 3 through 8) |
|
28 |
TOTAL (Enter Total of Lines 22 Through 27.1) MUST EQUAL LINE 20 UNDER SOURCES |
|
| 10 |
Purchases (other than for Energy Storage) |
|
|||
| 10.1 |
Purchases for Energy Storage |
||||
| 11 |
Power Exchanges: |
||||
| 12 |
Received |
|
|||
| 13 |
Delivered |
|
|||
| 14 |
Net Exchanges (Line 12 minus line 13) |
|
|||
| 15 |
Transmission For Other (Wheeling) |
||||
| 16 |
Received |
|
|||
| 17 |
Delivered |
|
|||
| 18 |
Net Transmission for Other (Line 16 minus line 17) |
|
|||
| 19 |
Transmission By Others Losses |
|
|||
| 20 |
TOTAL (Enter Total of Lines 9, 10, 10.1, 14, 18 and 19) |
|
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
MONTHLY PEAKS AND OUTPUT |
||||||
|
||||||
| Line No. |
MonthAxis Month (a) |
EnergyActivity Total Monthly Energy (b) |
NonRequiredSalesForResaleEnergy Monthly Non-Requirement Sales for Resale & Associated Losses (c) |
MonthlyPeakLoad Monthly Peak - Megawatts (d) |
DayOfMonthlyPeak Monthly Peak - Day of Month (e) |
HourOfMonthlyPeak Monthly Peak - Hour (f) |
NAME OF SYSTEM: Georgia Power Company |
||||||
29 |
January |
|
||||
30 |
February |
|
||||
31 |
March |
|
||||
32 |
April |
|
||||
33 |
May |
|
||||
34 |
June |
|
||||
35 |
July |
|
||||
36 |
August |
|
||||
37 |
September |
|
||||
38 |
October |
|
||||
39 |
November |
|
||||
40 |
December |
|
||||
41 |
Total |
|
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Steam Electric Generating Plant Statistics |
|
1. Report data for plant in Service only. |
| Line No. |
Item
(a)
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
|
Plant Name:
(c) |
Plant Name:
|
Plant Name:
|
Plant Name:
|
|||
| 1 |
PlantKind Kind of Plant (Internal Comb, Gas Turb, Nuclear) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2 |
PlantConstructionType Type of Constr (Conventional, Outdoor, Boiler, etc) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3 |
YearPlantOriginallyConstructed Year Originally Constructed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4 |
YearLastUnitOfPlantInstalled Year Last Unit was Installed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5 |
InstalledCapacityOfPlant Total Installed Cap (Max Gen Name Plate Ratings-MW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6 |
NetPeakDemandOnPlant Net Peak Demand on Plant - MW (60 minutes) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7 |
PlantHoursConnectedToLoad Plant Hours Connected to Load |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8 |
NetContinuousPlantCapability Net Continuous Plant Capability (Megawatts) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9 |
NetContinuousPlantCapabilityNotLimitedByCondenserWater When Not Limited by Condenser Water |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10 |
NetContinuousPlantCapabilityLimitedByCondenserWater When Limited by Condenser Water |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11 |
PlantAverageNumberOfEmployees Average Number of Employees |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 12 |
NetGenerationExcludingPlantUse Net Generation, Exclusive of Plant Use - kWh |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 13 |
CostOfLandAndLandRightsSteamProduction Cost of Plant: Land and Land Rights |
|
|
|
|
|
|
|
|
|
||||||||||||
| 14 |
CostOfStructuresAndImprovementsSteamProduction Structures and Improvements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
| 15 |
CostOfEquipmentSteamProduction Equipment Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 16 |
AssetRetirementCostsSteamProduction Asset Retirement Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
| 17 |
CostOfPlant Total cost (total 13 thru 20) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 18 |
CostPerKilowattOfInstalledCapacity Cost per KW of Installed Capacity (line 17/5) Including |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 19 |
OperationSupervisionAndEngineeringExpense Production Expenses: Oper, Supv, & Engr |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 20 |
FuelSteamPowerGeneration Fuel |
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
| 21 |
CoolantsAndWater Coolants and Water (Nuclear Plants Only) |
|
|
|
||||||||||||||||||
| 22 |
SteamExpensesSteamPowerGeneration Steam Expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 23 |
SteamFromOtherSources Steam From Other Sources |
|||||||||||||||||||||
| 24 |
SteamTransferredCredit Steam Transferred (Cr) |
|||||||||||||||||||||
| 25 |
ElectricExpensesSteamPowerGeneration Electric Expenses |
|
|
|
|
|
||||||||||||||||
| 26 |
MiscellaneousSteamPowerExpenses Misc Steam (or Nuclear) Power Expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 27 |
RentsSteamPowerGeneration Rents |
|
|
|
||||||||||||||||||
| 28 |
Allowances Allowances |
|
|
|
||||||||||||||||||
| 29 |
MaintenanceSupervisionAndEngineeringSteamPowerGeneration Maintenance Supervision and Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
| 30 |
MaintenanceOfStructuresSteamPowerGeneration Maintenance of Structures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 31 |
MaintenanceOfBoilerPlantSteamPowerGeneration Maintenance of Boiler (or reactor) Plant |
|
|
|
|
|
|
|||||||||||||||
| 32 |
MaintenanceOfElectricPlantSteamPowerGeneration Maintenance of Electric Plant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 33 |
MaintenanceOfMiscellaneousSteamPlant Maintenance of Misc Steam (or Nuclear) Plant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 34 |
PowerProductionExpensesSteamPower Total Production Expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 35 |
ExpensesPerNetKilowattHour Expenses per Net kWh |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 35 |
FuelKindAxis Plant Name |
BOWEN |
BOWEN |
HATCH |
MCDONOUGH NO. 3 |
MCDONOUGH NO. 3 |
MCDONOUGH NO. 4-6 |
MCDONOUGH NO. 4-6 |
MCINTOSH (CC) |
MCINTOSH (CT) |
MCINTOSH (CT) |
MCMANUS 3 & 4 |
SCHERER |
SCHERER |
VOGTLE 1&2 |
VOGTLE 3 |
WARNER ROBINS |
WARNER ROBINS |
WILSON |
YATES |
| 36 |
FuelKind Fuel Kind |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 37 |
FuelUnit Fuel Unit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 38 |
QuantityOfFuelBurned Quantity (Units) of Fuel Burned |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 39 |
FuelBurnedAverageHeatContent Avg Heat Cont - Fuel Burned (btu/indicate if nuclear) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 40 |
AverageCostOfFuelPerUnitAsDelivered Avg Cost of Fuel/unit, as Delvd f.o.b. during year |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
| 41 |
AverageCostOfFuelPerUnitBurned Average Cost of Fuel per Unit Burned |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
| 42 |
AverageCostOfFuelBurnedPerMillionBritishThermalUnit Average Cost of Fuel Burned per Million BTU |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
| 43 |
AverageCostOfFuelBurnedPerKilowattHourNetGeneration Average Cost of Fuel Burned per kWh Net Gen |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
| 44 |
AverageBritishThermalUnitPerKilowattHourNetGeneration Average BTU per kWh Net Generation |
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: PlantName |
Plant Vogtle and Plant Hatch, are jointly owned with Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton.
|
| (b) Concept: PlantName |
After nuclear fuel is placed in the reactor, the cost of fuel is amortized on the basis of quantity of heat produced, therefore matching the cost of the fuel with the power produced.
b)
Uranium: lbs
Conversion: Kilograms of uranium (kgU)
Enrichment: Separative work units (SWU)
Fabrication: Assemblies
c)
Type of fuel Used: Uranium
Enrichment: 4-5%
Fuel Array: 10 x 10
Fuel Assemblies: 560 Assemblies per Unit
Active Length of Fuel Assembly: Approximately 12.5 feet
Fuel Rods per Assembly: 96
Reactors: Two Boiling Water Reactors (BWRs) manufactured by General Electric Company
|
| (c) Concept: PlantName |
Plant Scherer is jointly owned with Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, the City of Dalton, Florida Power and Light Company, and Jacksonville Electric Authority.
|
| (d) Concept: PlantName |
Plant Vogtle and Plant Hatch, are jointly owned with Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton.
|
| (e) Concept: PlantName |
After nuclear fuel is placed in the reactor, the cost of fuel is amortized on the basis of quantity of heat produced, therefore matching the cost of the fuel with the power produced.
b)
Uranium: lbs
Conversion: Kilograms of uranium (kgU)
Enrichment: Separative work units (SWU)
Fabrication: Assemblies
c)
Type of fuel Used: Uranium
Enrichment: 4-5%
Fuel Array: 17 x 17
Fuel Assemblies: 193 Assemblies per Unit
Active Length of Fuel Assembly: Approximately 12 feet
Fuel Rods per Assembly: 264
Reactors: Two Pressurized Water Reactors (PWRs) manufactured by Westinghouse Electric Company
|
| (f) Concept: PlantName |
Plant Vogtle and Plant Hatch, are jointly owned with Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton.
|
| (g) Concept: PlantName |
After nuclear fuel is placed in the reactor, the cost of fuel is amortized on the basis of quantity of heat produced, therefore matching the cost of the fuel with the power produced.
b)
Uranium: lbs
Conversion: Kilograms of uranium (kgU)
Enrichment: Separative work units (SWU)
Fabrication: Assemblies
c)
Type of fuel Used: Uranium
Enrichment: 4-5%
Fuel Array: 17 x 17
Fuel Assemblies: 157 Assemblies per unit
Active Fuel Length of Assembly: Approximately 14 feet
Fuel Rods per Assembly: 264
Reactors: One Pressurized Water Reactor (PWR) manufactured by Westinghouse Electric Company
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Hydroelectric Generating Plant Statistics |
|
| Line No. |
Item
(a)
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
| 1 |
PlantKind Kind of Plant (Run-of-River or Storage) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2 |
PlantConstructionType Plant Construction type (Conventional or Outdoor) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3 |
YearPlantOriginallyConstructed Year Originally Constructed |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4 |
YearLastUnitOfPlantInstalled Year Last Unit was Installed |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5 |
InstalledCapacityOfPlant Total installed cap (Gen name plate Rating in MW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 6 |
NetPeakDemandOnPlant Net Peak Demand on Plant-Megawatts (60 minutes) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 7 |
PlantHoursConnectedToLoad Plant Hours Connect to Load |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8 |
NetPlantCapabilityAbstract Net Plant Capability (in megawatts) |
|||||||||||||
| 9 |
NetPlantCapabilityUnderMostFavorableOperatingConditions (a) Under Most Favorable Oper Conditions |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 10 |
NetPlantCapabilityUnderMostAdverseOperatingConditions (b) Under the Most Adverse Oper Conditions |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 11 |
PlantAverageNumberOfEmployees Average Number of Employees |
|||||||||||||
| 12 |
NetGenerationExcludingPlantUse Net Generation, Exclusive of Plant Use - kWh |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 13 |
CostOfPlantAbstract Cost of Plant |
|||||||||||||
| 14 |
CostOfLandAndLandRightsHydroelectricProduction Land and Land Rights |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 15 |
CostOfStructuresAndImprovementsHydroelectricProduction Structures and Improvements |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 16 |
CostOfReservoirsDamsAndWaterwaysHydroelectricProduction Reservoirs, Dams, and Waterways |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 17 |
EquipmentCostsHydroelectricProduction Equipment Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 18 |
CostOfRoadsRailroadsAndBridgesHydroelectricProduction Roads, Railroads, and Bridges |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 19 |
AssetRetirementCostsHydroelectricProduction Asset Retirement Costs |
|
|
|
|
|
|
|
|
|
|
|
||
| 20 |
CostOfPlant Total cost (total 13 thru 20) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 21 |
CostPerKilowattOfInstalledCapacity Cost per KW of Installed Capacity (line 20 / 5) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 22 |
ProductionExpensesAbstract Production Expenses |
|||||||||||||
| 23 |
OperationSupervisionAndEngineeringExpense Operation Supervision and Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 24 |
WaterForPower Water for Power |
|
|
|
|
|
||||||||
| 25 |
HydraulicExpenses Hydraulic Expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 26 |
ElectricExpensesHydraulicPowerGeneration Electric Expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 27 |
MiscellaneousHydraulicPowerGenerationExpenses Misc Hydraulic Power Generation Expenses |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 28 |
RentsHydraulicPowerGeneration Rents |
|
||||||||||||
| 29 |
MaintenanceSupervisionAndEngineeringHydraulicPowerGeneration Maintenance Supervision and Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 30 |
MaintenanceOfStructuresHydraulicPowerGeneration Maintenance of Structures |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 31 |
MaintenanceOfReservoirsDamsAndWaterways Maintenance of Reservoirs, Dams, and Waterways |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 32 |
MaintenanceOfElectricPlantHydraulicPowerGeneration Maintenance of Electric Plant |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 33 |
MaintenanceOfMiscellaneousHydraulicPlant Maintenance of Misc Hydraulic Plant |
|
|
|
|
|
|
|
|
|
||||
| 34 |
PowerProductionExpensesHydraulicPower Total Production Expenses (total 23 thru 33) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 35 |
ExpensesPerNetKilowattHour Expenses per net kWh |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
|
Pumped Storage Generating Plant Statistics |
|||||||
|
|||||||
| Line No. |
Item
(a)
|
FERC Licensed Project No.
Plant Name:
|
FERC Licensed Project No.
Plant Name:
|
||||
| 1 |
PlantConstructionType Type of Plant Construction (Conventional or Outdoor) |
(a) |
|
||||
| 2 |
YearPlantOriginallyConstructed Year Originally Constructed |
|
|
||||
| 3 |
YearLastUnitOfPlantInstalled Year Last Unit was Installed |
|
|
||||
| 4 |
InstalledCapacityOfPlant Total installed cap (Gen name plate Rating in MW) |
|
|
||||
| 5 |
NetPeakDemandOnPlant Net Peak Demaind on Plant-Megawatts (60 minutes) |
|
|
||||
| 6 |
PlantHoursConnectedToLoad Plant Hours Connect to Load While Generating |
|
|
||||
| 7 |
NetContinuousPlantCapability Net Plant Capability (in megawatts) |
|
|
||||
| 8 |
PlantAverageNumberOfEmployees Average Number of Employees |
||||||
| 9 |
NetGenerationExcludingPlantUse Generation, Exclusive of Plant Use - kWh |
|
|
||||
| 10 |
EnergyUsedForPumping Energy Used for Pumping |
|
|
||||
| 11 |
NetOutputForLoad Net Output for Load (line 9 - line 10) - Kwh |
|
|
||||
| 12 |
CostOfPlantAbstract Cost of Plant |
||||||
| 13 |
CostOfLandAndLandRightsPumpedStoragePlant Land and Land Rights |
|
|
||||
| 14 |
CostOfStructuresAndImprovementsPumpedStoragePlant Structures and Improvements |
|
|
||||
| 15 |
CostOfReservoirsDamsAndWaterwaysPumpedStoragePlant Reservoirs, Dams, and Waterways |
|
|
||||
| 16 |
CostOfWaterWheelsTurbinesAndGeneratorsPumpedStoragePlant Water Wheels, Turbines, and Generators |
|
|
||||
| 17 |
CostOfAccessoryElectricEquipmentPumpedStoragePlant Accessory Electric Equipment |
|
|
||||
| 18 |
CostOfMiscellaneousPowerPlantEquipmentPumpedStoragePlant Miscellaneous Powerplant Equipment |
|
|
||||
| 19 |
CostOfRoadsRailroadsAndBridgesPumpedStoragePlant Roads, Railroads, and Bridges |
|
|
||||
| 20 |
AssetRetirementCostsPumpedStoragePlant Asset Retirement Costs |
|
|||||
| 21 |
CostOfPlant Total cost (total 13 thru 20) |
|
|
||||
| 22 |
CostPerKilowattOfInstalledCapacity Cost per KW of installed cap (line 21 / 4) |
|
|
||||
| 23 |
ProductionExpensesAbstract Production Expenses |
||||||
| 24 |
OperationSupervisionAndEngineeringExpense Operation Supervision and Engineering |
|
|
||||
| 25 |
WaterForPower Water for Power |
||||||
| 26 |
PumpedStorageExpenses Pumped Storage Expenses |
|
|||||
| 27 |
ElectricExpensesPumpedStoragePlant Electric Expenses |
|
|||||
| 28 |
MiscellaneousPumpedStoragePowerGenerationExpenses Misc Pumped Storage Power generation Expenses |
|
|
||||
| 29 |
RentsPumpedStoragePlant Rents |
|
|||||
| 30 |
MaintenanceSupervisionAndEngineeringPumpedStoragePlant Maintenance Supervision and Engineering |
|
|||||
| 31 |
MaintenanceOfStructuresPumpedStoragePlant Maintenance of Structures |
|
|||||
| 32 |
MaintenanceOfReservoirsDamsAndWaterwaysPumpedStoragePlant Maintenance of Reservoirs, Dams, and Waterways |
|
|||||
| 33 |
MaintenanceOfElectricPlantPumpedStoragePlant Maintenance of Electric Plant |
|
|||||
| 34 |
MaintenanceOfMiscellaneousPumpedStoragePlant Maintenance of Misc Pumped Storage Plant |
|
|||||
| 35 |
PowerProductionExpenseBeforePumpingExpenses Production Exp Before Pumping Exp (24 thru 34) |
|
|
||||
| 36 |
PumpingExpenses Pumping Expenses |
||||||
| 37 |
PowerProductionExpensesPumpedStoragePlant Total Production Exp (total 35 and 36) |
|
|
||||
| 38 |
ExpensesPerNetKilowattHour Expenses per kWh (line 37 / 9) |
|
|
||||
| 39 |
ExpensesPerNetKilowattHourGenerationAndPumping Expenses per KWh of Generation and Pumping (line 37/(line 9 + line 10)) |
|
|
||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: PlantConstructionType |
Rocky Mountain is jointly owned with Oglethorpe Power Corporation.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
GENERATING PLANT STATISTICS (Small Plants) |
|||||||||||||
|
|||||||||||||
| Production Expenses | |||||||||||||
| Line No. |
PlantName Name of Plant (a) |
YearPlantOriginallyConstructed Year Orig. Const. (b) |
InstalledCapacityOfPlant Installed Capacity Name Plate Rating (MW) (c) |
NetPeakDemandOnPlant Net Peak Demand MW (60 min) (d) |
NetGenerationExcludingPlantUse Net Generation Excluding Plant Use (e) |
CostOfPlant Cost of Plant (f) |
PlantCostPerMw Plant Cost (Incl Asset Retire. Costs) Per MW (g) |
OperatingExpensesExcludingFuel Operation Exc'l. Fuel (h) |
FuelProductionExpenses Fuel Production Expenses (i) |
MaintenanceProductionExpenses Maintenance Production Expenses (j) |
FuelKind Kind of Fuel (k) |
FuelCostPerMmbtus Fuel Costs (in cents (per Million Btu) (l) |
GenerationType Generation Type (m) |
| 1 | |||||||||||||
| 2 | |||||||||||||
| 3 | |||||||||||||
| 4 | |||||||||||||
| 5 | |||||||||||||
| 6 | |||||||||||||
| 7 | |||||||||||||
| 8 | |||||||||||||
| 9 | (a) |
||||||||||||
| 10 | |||||||||||||
| 11 | |||||||||||||
| 12 | |||||||||||||
| 13 | |||||||||||||
| 14 | |||||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: PlantName |
Various Solar consists of Dalton, University of Georgia, Falcons Solar Projects, Tri-County Solar Projects, Guyton, Comer, Waynesboro, and LaGrange.
|
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
ENERGY STORAGE OPERATIONS (Large Plants) |
|||||||||||||||||||
|
|||||||||||||||||||
| Line No. |
Name of the Energy Storage Project (a) |
Functional Classification (b) |
Location of the Project (c) |
MWHs (d) |
MWHs delivered to the grid to support Production (e) |
MWHs delivered to the grid to support Transmission (f) |
MWHs delivered to the grid to support Distribution (g) |
MWHs Lost During Conversion, Storage and Discharge of Energy Production (h) |
MWHs Lost During Conversion, Storage and Discharge of Energy Transmission (i) |
MWHs Lost During Conversion, Storage and Discharge of Energy Distribution (j) |
MWHs Sold (k) |
Revenues from Energy Storage Operations (l) |
Power Purchased for Storage Operations (555.1) (Dollars) (m) |
Fuel Costs from associated fuel accounts for Storage Operations Associated with Self- Generated Power (Dollars) (n) |
Other Costs Associated with Self-Generated Power (Dollars) (o) |
Account for Project Costs (p) |
Production (Dollars) (q) |
Transmission (Dollars) (r) |
Distribution (Dollars) (s) |
| 1 | |||||||||||||||||||
| 2 | |||||||||||||||||||
| 3 | |||||||||||||||||||
| 4 | |||||||||||||||||||
| 5 | |||||||||||||||||||
| 6 | |||||||||||||||||||
| 7 | |||||||||||||||||||
| 8 | |||||||||||||||||||
| 9 | |||||||||||||||||||
| 10 | |||||||||||||||||||
| 11 | |||||||||||||||||||
| 12 | |||||||||||||||||||
| 13 | |||||||||||||||||||
| 14 | |||||||||||||||||||
| 15 | |||||||||||||||||||
| 16 | |||||||||||||||||||
| 17 | |||||||||||||||||||
| 18 | |||||||||||||||||||
| 19 | |||||||||||||||||||
| 20 | |||||||||||||||||||
| 21 | |||||||||||||||||||
| 22 | |||||||||||||||||||
| 23 | |||||||||||||||||||
| 24 | |||||||||||||||||||
| 25 | |||||||||||||||||||
| 26 | |||||||||||||||||||
| 27 | |||||||||||||||||||
| 28 | |||||||||||||||||||
| 29 | |||||||||||||||||||
| 30 | |||||||||||||||||||
| 31 | |||||||||||||||||||
| 32 | |||||||||||||||||||
| 33 | |||||||||||||||||||
| 34 | |||||||||||||||||||
| 35 | TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
ENERGY STORAGE OPERATIONS (Small Plants) |
|||||||||
|
|||||||||
| BALANCE AT BEGINNING OF YEAR | |||||||||
| Line No. |
Name of the Energy Storage Project (a) |
Functional Classification (b) |
Location of the Project (c) |
Project Cost (d) |
Operations (Excluding Fuel used in Storage Operations) (e) |
Maintenance (f) |
Cost of fuel used in storage operations (g) |
Account No. 555.1, Power Purchased for Storage Operations (h) |
Other Expenses (i) |
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| 4 | |||||||||
| 5 | |||||||||
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| 9 | |||||||||
| 10 | |||||||||
| 11 | |||||||||
| 12 | |||||||||
| 13 | |||||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 | |||||||||
| 26 | |||||||||
| 27 | |||||||||
| 28 | |||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | TOTAL |
|
|
|
|
|
|
||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
TRANSMISSION LINE STATISTICS |
||||||||||||||||
|
||||||||||||||||
| DESIGNATION | VOLTAGE (KV) - (Indicate where other than 60 cycle, 3 phase) | LENGTH (Pole miles) - (In the case of underground lines report circuit miles) | COST OF LINE (Include in column (j) Land, Land rights, and clearing right-of-way) | EXPENSES, EXCEPT DEPRECIATION AND TAXES | ||||||||||||
| Line No. |
TransmissionLineStartPoint From |
TransmissionLineEndPoint To |
OperatingVoltageOfTransmissionLine Operating |
DesignedVoltageOfTransmissionLine Designated |
SupportingStructureOfTransmissionLineType Type of Supporting Structure |
LengthForStandAloneTransmissionLines On Structure of Line Designated |
LengthForTransmissionLinesAggregatedWithOtherStructures On Structures of Another Line |
NumberOfTransmissionCircuits Number of Circuits |
SizeOfConductorAndMaterial Size of Conductor and Material |
CostOfLandAndLandRightsTransmissionLines Land |
ConstructionAndOtherCostsTransmissionLines Construction Costs |
OverallCostOfTransmissionLine Total Costs |
OperatingExpensesOfTransmissionLine Operation Expenses |
MaintenanceExpensesOfTransmissionLine Maintenance Expenses |
RentExpensesOfTransmissionLine Rents |
OverallExpensesOfTransmissionLine Total Expenses |
|
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |
(i) |
(j) |
(k) |
(l) |
(m) |
(n) |
(o) |
(p) |
|
| 1 | ||||||||||||||||
| 2 | ||||||||||||||||
| 3 | ||||||||||||||||
| 4 | ||||||||||||||||
| 5 | ||||||||||||||||
| 6 | ||||||||||||||||
| 7 | ||||||||||||||||
| 8 | ||||||||||||||||
| 9 | ||||||||||||||||
| 10 | ||||||||||||||||
| 11 | ||||||||||||||||
| 12 | ||||||||||||||||
| 13 | ||||||||||||||||
| 14 | ||||||||||||||||
| 15 | ||||||||||||||||
| 16 | ||||||||||||||||
| 17 | ||||||||||||||||
| 18 | ||||||||||||||||
| 19 | ||||||||||||||||
| 20 | ||||||||||||||||
| 21 | ||||||||||||||||
| 22 | ||||||||||||||||
| 23 | ||||||||||||||||
| 24 | ||||||||||||||||
| 25 | ||||||||||||||||
| 26 | ||||||||||||||||
| 27 | ||||||||||||||||
| 28 | ||||||||||||||||
| 29 | ||||||||||||||||
| 30 | ||||||||||||||||
| 31 | ||||||||||||||||
| 32 | ||||||||||||||||
| 33 | ||||||||||||||||
| 34 | ||||||||||||||||
| 35 | ||||||||||||||||
| 36 | ||||||||||||||||
| 37 | ||||||||||||||||
| 38 | ||||||||||||||||
| 39 | ||||||||||||||||
| 40 | ||||||||||||||||
| 41 | ||||||||||||||||
| 42 | ||||||||||||||||
| 43 | ||||||||||||||||
| 44 | ||||||||||||||||
| 45 | ||||||||||||||||
| 46 | ||||||||||||||||
| 47 | ||||||||||||||||
| 48 | ||||||||||||||||
| 49 | ||||||||||||||||
| 50 | ||||||||||||||||
| 51 | ||||||||||||||||
| 52 | ||||||||||||||||
| 53 | ||||||||||||||||
| 54 | ||||||||||||||||
| 55 | ||||||||||||||||
| 56 | ||||||||||||||||
| 57 | ||||||||||||||||
| 58 | ||||||||||||||||
| 59 | ||||||||||||||||
| 60 | ||||||||||||||||
| 61 | ||||||||||||||||
| 62 | ||||||||||||||||
| 63 | ||||||||||||||||
| 64 | ||||||||||||||||
| 65 | ||||||||||||||||
| 66 | ||||||||||||||||
| 67 | ||||||||||||||||
| 68 | ||||||||||||||||
| 69 | ||||||||||||||||
| 70 | ||||||||||||||||
| 71 | ||||||||||||||||
| 72 | ||||||||||||||||
| 73 | ||||||||||||||||
| 74 | ||||||||||||||||
| 75 | ||||||||||||||||
| 76 | ||||||||||||||||
| 77 | ||||||||||||||||
| 78 | ||||||||||||||||
| 79 | ||||||||||||||||
| 80 | ||||||||||||||||
| 81 | ||||||||||||||||
| 82 | ||||||||||||||||
| 83 | ||||||||||||||||
| 84 | ||||||||||||||||
| 85 | ||||||||||||||||
| 86 | ||||||||||||||||
| 87 | ||||||||||||||||
| 88 | ||||||||||||||||
| 89 | ||||||||||||||||
| 90 | ||||||||||||||||
| 91 | ||||||||||||||||
| 92 | ||||||||||||||||
| 93 | ||||||||||||||||
| 94 | ||||||||||||||||
| 95 | ||||||||||||||||
| 96 | ||||||||||||||||
| 97 | ||||||||||||||||
| 98 | ||||||||||||||||
| 99 | ||||||||||||||||
| 100 | ||||||||||||||||
| 101 | ||||||||||||||||
| 102 | ||||||||||||||||
| 103 | ||||||||||||||||
| 104 | ||||||||||||||||
| 105 | ||||||||||||||||
| 106 | ||||||||||||||||
| 107 | ||||||||||||||||
| 108 | ||||||||||||||||
| 109 | ||||||||||||||||
| 110 | ||||||||||||||||
| 111 | ||||||||||||||||
| 112 | ||||||||||||||||
| 113 | ||||||||||||||||
| 114 | ||||||||||||||||
| 115 | ||||||||||||||||
| 116 | ||||||||||||||||
| 117 | ||||||||||||||||
| 118 | ||||||||||||||||
| 119 | ||||||||||||||||
| 120 | ||||||||||||||||
| 121 | ||||||||||||||||
| 122 | ||||||||||||||||
| 123 | ||||||||||||||||
| 124 | ||||||||||||||||
| 125 | ||||||||||||||||
| 126 | ||||||||||||||||
| 127 | ||||||||||||||||
| 128 | ||||||||||||||||
| 129 | ||||||||||||||||
| 130 | ||||||||||||||||
| 131 | ||||||||||||||||
| 132 | ||||||||||||||||
| 133 | ||||||||||||||||
| 134 | ||||||||||||||||
| 135 | ||||||||||||||||
| 136 | ||||||||||||||||
| 137 | ||||||||||||||||
| 138 | ||||||||||||||||
| 139 | ||||||||||||||||
| 140 | ||||||||||||||||
| 141 | ||||||||||||||||
| 142 | ||||||||||||||||
| 143 | ||||||||||||||||
| 144 | ||||||||||||||||
| 145 | ||||||||||||||||
| 146 | ||||||||||||||||
| 147 | ||||||||||||||||
| 148 | ||||||||||||||||
| 149 | ||||||||||||||||
| 150 | ||||||||||||||||
| 151 | ||||||||||||||||
| 152 | ||||||||||||||||
| 153 | ||||||||||||||||
| 154 | ||||||||||||||||
| 155 | ||||||||||||||||
| 156 | ||||||||||||||||
| 157 | ||||||||||||||||
| 158 | ||||||||||||||||
| 159 | ||||||||||||||||
| 160 | ||||||||||||||||
| 161 | ||||||||||||||||
| 162 | ||||||||||||||||
| 163 | ||||||||||||||||
| 164 | ||||||||||||||||
| 165 | ||||||||||||||||
| 166 | ||||||||||||||||
| 167 | ||||||||||||||||
| 168 | ||||||||||||||||
| 169 | ||||||||||||||||
| 170 | ||||||||||||||||
| 171 | ||||||||||||||||
| 172 | ||||||||||||||||
| 173 | ||||||||||||||||
| 174 | ||||||||||||||||
| 175 | ||||||||||||||||
| 176 | ||||||||||||||||
| 177 | ||||||||||||||||
| 178 | ||||||||||||||||
| 179 | ||||||||||||||||
| 180 | ||||||||||||||||
| 181 | ||||||||||||||||
| 182 | ||||||||||||||||
| 183 | ||||||||||||||||
| 184 | ||||||||||||||||
| 185 | ||||||||||||||||
| 186 | ||||||||||||||||
| 187 | ||||||||||||||||
| 188 | ||||||||||||||||
| 189 | ||||||||||||||||
| 190 | ||||||||||||||||
| 191 | ||||||||||||||||
| 192 | ||||||||||||||||
| 36 | TOTAL |
|
|
|
|
|
|
|
|
|
|
|||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
TRANSMISSION LINES ADDED DURING YEAR |
||||||||||||||||||
|
||||||||||||||||||
| LINE DESIGNATION | SUPPORTING STRUCTURE | CIRCUITS PER STRUCTURE | CONDUCTORS | LINE COST | ||||||||||||||
| Line No. |
TransmissionLineStartPoint From |
TransmissionLineEndPoint To |
LengthOfTransmissionLineAdded Line Length in Miles |
SupportingStructureOfTransmissionLineType Type |
AverageNumberOfSupportingStructuresOfTransmissionLinePerMiles Average Number per Miles |
NumberOfTransmissionCircuitsPerStructurePresent Present |
NumberOfTransmissionCircuitsPerStructureUltimate Ultimate |
ConductorSize Size |
ConductorSpecification Specification |
ConductorConfigurationAndSpacing Configuration and Spacing |
OperatingVoltageOfTransmissionLine Voltage KV (Operating) |
CostOfLandAndLandRightsTransmissionLinesAdded Land and Land Rights |
CostOfPolesTowersAndFixturesTransmissionLinesAdded Poles, Towers and Fixtures |
CostOfConductorsAndDevicesTransmissionLinesAdded Conductors and Devices |
Asset Retire. Costs |
CostOfTransmissionLinesAdded Total |
SupportingStructureConstructionType Construction |
|
|
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |
(i) |
(j) |
(k) |
(l) |
(m) |
(n) |
(o) |
(p) |
(q) |
||
| 1 | ||||||||||||||||||
| 2 | ||||||||||||||||||
| 3 | ||||||||||||||||||
| 4 | ||||||||||||||||||
| 44 |
TOTAL |
|
|
|
|
|
|
|
|
|||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
SUBSTATIONS |
||||||||||||
|
||||||||||||
| Character of Substation | VOLTAGE (In MVa) | Conversion Apparatus and Special Equipment | ||||||||||
| Line No. |
SubstationNameAndLocation Name and Location of Substation (a) |
SubstationCharacterDescription Transmission or Distribution (b) |
SubstationCharacterAttendedOrUnattended Attended or Unattended (b-1) |
PrimaryVoltageLevel Primary Voltage (In MVa) (c) |
SecondaryVoltageLevel Secondary Voltage (In MVa) (d) |
TertiaryVoltageLevel Tertiary Voltage (In MVa) (e) |
SubstationInServiceCapacity Capacity of Substation (In Service) (In MVa) (f) |
NumberOfTransformersInService Number of Transformers In Service (g) |
Number of Spare Transformers (h) |
ConversionApparatusAndSpecialEquipmentType Type of Equipment (i) |
NumberOfConversionApparatusAndSpecialEquipmentUnits Number of Units (j) |
CapacityOfConversionApparatusAndSpecialEquipment Total Capacity (In MVa) (k) |
| 1 | ||||||||||||
| 2 | ||||||||||||
| 3 | ||||||||||||
| 4 | ||||||||||||
| 5 | ||||||||||||
| 6 | ||||||||||||
| 7 | ||||||||||||
| 8 | ||||||||||||
| 9 | ||||||||||||
| 10 | ||||||||||||
| 11 | ||||||||||||
| 12 | ||||||||||||
| 13 | ||||||||||||
| 14 | ||||||||||||
| 15 | ||||||||||||
| 16 | ||||||||||||
| 17 | ||||||||||||
| 18 | ||||||||||||
| 19 | ||||||||||||
| 20 | ||||||||||||
| 21 | ||||||||||||
| 22 | ||||||||||||
| 23 | ||||||||||||
| 24 | ||||||||||||
| 25 | ||||||||||||
| 26 | ||||||||||||
| 27 | ||||||||||||
| 28 | ||||||||||||
| 29 | ||||||||||||
| 30 | ||||||||||||
| 31 | ||||||||||||
| 32 | ||||||||||||
| 33 | ||||||||||||
| 34 | ||||||||||||
| 35 | ||||||||||||
| 36 | ||||||||||||
| 37 | ||||||||||||
| 38 | ||||||||||||
| 39 | ||||||||||||
| 40 | ||||||||||||
| 41 | ||||||||||||
| 42 | ||||||||||||
| 43 | ||||||||||||
| 44 | ||||||||||||
| 45 | ||||||||||||
| 46 | ||||||||||||
| 47 | ||||||||||||
| 48 | ||||||||||||
| 49 | ||||||||||||
| 50 | ||||||||||||
| 51 | ||||||||||||
| 52 | ||||||||||||
| 53 | ||||||||||||
| 54 | ||||||||||||
| 55 | ||||||||||||
| 56 | ||||||||||||
| 57 | ||||||||||||
| 58 | ||||||||||||
| 59 | ||||||||||||
| 60 | ||||||||||||
| 61 | ||||||||||||
| 62 | ||||||||||||
| 63 | ||||||||||||
| 64 | ||||||||||||
| 65 | ||||||||||||
| 66 | ||||||||||||
| 67 | ||||||||||||
| 68 | ||||||||||||
| 69 | ||||||||||||
| 70 | ||||||||||||
| 71 | ||||||||||||
| 72 | ||||||||||||
| 73 | ||||||||||||
| 74 | ||||||||||||
| 75 | ||||||||||||
| 76 | ||||||||||||
| 77 | ||||||||||||
| 78 | ||||||||||||
| 79 | ||||||||||||
| 80 | ||||||||||||
| 81 | ||||||||||||
| 82 | ||||||||||||
| 83 | ||||||||||||
| 84 | ||||||||||||
| 85 | ||||||||||||
| 86 | ||||||||||||
| 87 | ||||||||||||
| 88 | ||||||||||||
| 89 | ||||||||||||
| 90 | ||||||||||||
| 91 | ||||||||||||
| 92 | ||||||||||||
| 93 | ||||||||||||
| 94 | ||||||||||||
| 95 | ||||||||||||
| 96 | ||||||||||||
| 97 | ||||||||||||
| 98 | ||||||||||||
| 99 | ||||||||||||
| 100 | ||||||||||||
| 101 | ||||||||||||
| 102 | ||||||||||||
| 103 | ||||||||||||
| 104 | ||||||||||||
| 105 | ||||||||||||
| 106 | ||||||||||||
| 107 | ||||||||||||
| 108 | ||||||||||||
| 109 | ||||||||||||
| 110 | ||||||||||||
| 111 | ||||||||||||
| 112 | ||||||||||||
| 113 | ||||||||||||
| 114 | ||||||||||||
| 115 | ||||||||||||
| 116 | ||||||||||||
| 117 | ||||||||||||
| 118 | ||||||||||||
| 119 | ||||||||||||
| 120 | ||||||||||||
| 121 | ||||||||||||
| 122 | ||||||||||||
| 123 | ||||||||||||
| 124 | ||||||||||||
| 125 | ||||||||||||
| 126 | ||||||||||||
| 127 | ||||||||||||
| 128 | ||||||||||||
| 129 | ||||||||||||
| 130 | ||||||||||||
| 131 | ||||||||||||
| 132 | ||||||||||||
| 133 | ||||||||||||
| 134 | ||||||||||||
| 135 | ||||||||||||
| 136 | ||||||||||||
| 137 | ||||||||||||
| 138 | ||||||||||||
| 139 | ||||||||||||
| 140 | ||||||||||||
| 141 | ||||||||||||
| 142 | ||||||||||||
| 143 | ||||||||||||
| 144 | ||||||||||||
| 145 | ||||||||||||
| 146 | ||||||||||||
| 147 | ||||||||||||
| 148 | ||||||||||||
| 149 | ||||||||||||
| 150 | ||||||||||||
| 151 | ||||||||||||
| 152 | ||||||||||||
| 153 | ||||||||||||
| 154 | ||||||||||||
| 155 | ||||||||||||
| 156 | ||||||||||||
| 157 | ||||||||||||
| 158 | ||||||||||||
| 159 | ||||||||||||
| 160 | ||||||||||||
| 161 | ||||||||||||
| 162 | ||||||||||||
| 163 | ||||||||||||
| 164 | ||||||||||||
| 165 | ||||||||||||
| 166 | ||||||||||||
| 167 | ||||||||||||
| 168 | ||||||||||||
| 169 | ||||||||||||
| 170 | ||||||||||||
| 171 | ||||||||||||
| 172 | ||||||||||||
| 173 | ||||||||||||
| 174 | ||||||||||||
| 175 | ||||||||||||
| 176 | ||||||||||||
| 177 | ||||||||||||
| 178 | ||||||||||||
| 179 | ||||||||||||
| 180 | ||||||||||||
| 181 | ||||||||||||
| 182 | ||||||||||||
| 183 | ||||||||||||
| 184 | ||||||||||||
| 185 | ||||||||||||
| 186 | ||||||||||||
| 187 | ||||||||||||
| 188 | ||||||||||||
| 189 | ||||||||||||
| 190 | ||||||||||||
| 191 | ||||||||||||
| 192 | ||||||||||||
| 193 | ||||||||||||
| 194 | ||||||||||||
| 195 | ||||||||||||
| 196 | ||||||||||||
| 197 | ||||||||||||
| 198 | ||||||||||||
| 199 | ||||||||||||
| 200 | ||||||||||||
| 201 | ||||||||||||
| 202 | ||||||||||||
| 203 | ||||||||||||
| 204 | ||||||||||||
| 205 | ||||||||||||
| 206 | ||||||||||||
| 207 | ||||||||||||
| 208 | ||||||||||||
| 209 | ||||||||||||
| 210 | ||||||||||||
| 211 | ||||||||||||
| 212 | ||||||||||||
| 213 | ||||||||||||
| 214 | ||||||||||||
| 215 | ||||||||||||
| 216 | ||||||||||||
| 217 | ||||||||||||
| 218 | ||||||||||||
| 219 | ||||||||||||
| 220 | ||||||||||||
| 221 | ||||||||||||
| 222 | ||||||||||||
| 223 | ||||||||||||
| 224 | ||||||||||||
| 225 | ||||||||||||
| 226 | ||||||||||||
| 227 | ||||||||||||
| 228 | ||||||||||||
| 229 | ||||||||||||
| 230 | ||||||||||||
| 231 | ||||||||||||
| 232 | ||||||||||||
| 233 | ||||||||||||
| 234 | ||||||||||||
| 235 | ||||||||||||
| 236 | ||||||||||||
| 237 | ||||||||||||
| 238 | ||||||||||||
| 239 | ||||||||||||
| 240 | ||||||||||||
| 241 | ||||||||||||
| 242 | ||||||||||||
| 243 | ||||||||||||
| 244 | ||||||||||||
| 245 | ||||||||||||
| 246 | ||||||||||||
| 247 | ||||||||||||
| 248 | ||||||||||||
| 249 | ||||||||||||
| 250 | ||||||||||||
| 251 | ||||||||||||
| 252 | ||||||||||||
| 253 | ||||||||||||
| 254 | ||||||||||||
| 255 | ||||||||||||
| 256 | ||||||||||||
| 257 | ||||||||||||
| 258 | ||||||||||||
| 259 | ||||||||||||
| 260 | ||||||||||||
| 261 | ||||||||||||
| 262 | ||||||||||||
| 263 | ||||||||||||
| 264 | ||||||||||||
| 265 | ||||||||||||
| 266 | ||||||||||||
| 267 | ||||||||||||
| 268 | ||||||||||||
| 269 | ||||||||||||
| 270 | ||||||||||||
| 271 | ||||||||||||
| 272 | ||||||||||||
| 273 | ||||||||||||
| 274 | ||||||||||||
| 275 | ||||||||||||
| 276 | ||||||||||||
| 277 | ||||||||||||
| 278 | ||||||||||||
| 279 | ||||||||||||
| 280 | ||||||||||||
| 281 | ||||||||||||
| 282 | ||||||||||||
| 283 | ||||||||||||
| 284 | ||||||||||||
| 285 | ||||||||||||
| 286 | ||||||||||||
| 287 | ||||||||||||
| 288 | ||||||||||||
| 289 | ||||||||||||
| 290 | ||||||||||||
| 291 | ||||||||||||
| 292 | ||||||||||||
| 293 | ||||||||||||
| 294 | ||||||||||||
| 295 | ||||||||||||
| 296 | ||||||||||||
| 297 | ||||||||||||
| 298 | ||||||||||||
| 299 | ||||||||||||
| 300 | ||||||||||||
| 301 | ||||||||||||
| 302 | ||||||||||||
| 303 | ||||||||||||
| 304 | ||||||||||||
| 305 | ||||||||||||
| 306 | ||||||||||||
| 307 | ||||||||||||
| 308 | ||||||||||||
| 309 | ||||||||||||
| 310 | ||||||||||||
| 311 | ||||||||||||
| 312 | ||||||||||||
| 313 | ||||||||||||
| 314 | ||||||||||||
| 315 | ||||||||||||
| 316 | ||||||||||||
| 317 | ||||||||||||
| 318 | ||||||||||||
| 319 | ||||||||||||
| 320 | ||||||||||||
| 321 | ||||||||||||
| 322 | ||||||||||||
| 323 | ||||||||||||
| 324 | ||||||||||||
| 325 | ||||||||||||
| 326 | ||||||||||||
| 327 | ||||||||||||
| 328 | ||||||||||||
| 329 | ||||||||||||
| 330 | ||||||||||||
| 331 | ||||||||||||
| 332 | ||||||||||||
| 333 | ||||||||||||
| 334 | ||||||||||||
| 335 | ||||||||||||
| 336 | ||||||||||||
| 337 | ||||||||||||
| 338 | ||||||||||||
| 339 | ||||||||||||
| 340 | ||||||||||||
| 341 | ||||||||||||
| 342 | ||||||||||||
| 343 | ||||||||||||
| 344 | ||||||||||||
| 345 | ||||||||||||
| 346 | ||||||||||||
| 347 | ||||||||||||
| 348 | ||||||||||||
| 349 | ||||||||||||
| 350 | ||||||||||||
| 351 | ||||||||||||
| 352 | ||||||||||||
| 353 | ||||||||||||
| 354 | ||||||||||||
| 355 | ||||||||||||
| 356 | ||||||||||||
| 357 | ||||||||||||
| 358 | ||||||||||||
| 359 | ||||||||||||
| 360 | ||||||||||||
| 361 | ||||||||||||
| 362 | ||||||||||||
| 363 | ||||||||||||
| 364 | ||||||||||||
| 365 | ||||||||||||
| 366 | ||||||||||||
| 367 | ||||||||||||
| 368 | ||||||||||||
| 369 | ||||||||||||
| 370 | ||||||||||||
| 371 | ||||||||||||
| 372 | ||||||||||||
| 373 | ||||||||||||
| 374 | ||||||||||||
| 375 | ||||||||||||
| 376 | ||||||||||||
| 377 | ||||||||||||
| 378 | ||||||||||||
| 379 | ||||||||||||
| 380 | ||||||||||||
| 381 | ||||||||||||
| 382 | ||||||||||||
| 383 | ||||||||||||
| 384 | ||||||||||||
| 385 | ||||||||||||
| 386 | ||||||||||||
| 387 | ||||||||||||
| 388 | ||||||||||||
| 389 | ||||||||||||
| 390 | ||||||||||||
| 391 | ||||||||||||
| 392 | ||||||||||||
| 393 | ||||||||||||
| 394 | ||||||||||||
| 395 | ||||||||||||
| 396 | ||||||||||||
| 397 | ||||||||||||
| 398 | ||||||||||||
| 399 | ||||||||||||
| 400 | ||||||||||||
| 401 | ||||||||||||
| 402 | ||||||||||||
| 403 | ||||||||||||
| 404 | ||||||||||||
| 405 | ||||||||||||
| 406 | ||||||||||||
| 407 | ||||||||||||
| 408 | ||||||||||||
| 409 | ||||||||||||
| 410 | ||||||||||||
| 411 | ||||||||||||
| 412 | ||||||||||||
| 413 | ||||||||||||
| 414 | ||||||||||||
| 415 | ||||||||||||
| 416 | ||||||||||||
| 417 | ||||||||||||
| 418 | ||||||||||||
| 419 | ||||||||||||
| 420 | ||||||||||||
| 421 | ||||||||||||
| 422 | ||||||||||||
| 423 | ||||||||||||
| 424 | ||||||||||||
| 425 | ||||||||||||
| 426 | ||||||||||||
| 427 | ||||||||||||
| 428 | ||||||||||||
| 429 | ||||||||||||
| 430 | ||||||||||||
| 431 | ||||||||||||
| 432 | ||||||||||||
| 433 | ||||||||||||
| 434 | ||||||||||||
| 435 | ||||||||||||
| 436 | ||||||||||||
| 437 | ||||||||||||
| 438 | ||||||||||||
| 439 | ||||||||||||
| 440 | ||||||||||||
| 441 | ||||||||||||
| 442 | ||||||||||||
| 443 | ||||||||||||
| 444 | ||||||||||||
| 445 | ||||||||||||
| 446 | ||||||||||||
| 447 | ||||||||||||
| 448 | ||||||||||||
| 449 | ||||||||||||
| 450 | ||||||||||||
| 451 | ||||||||||||
| 452 | ||||||||||||
| 453 | ||||||||||||
| 454 | ||||||||||||
| 455 | ||||||||||||
| 456 | ||||||||||||
| 457 | ||||||||||||
| 458 | ||||||||||||
| 459 | ||||||||||||
| 460 | ||||||||||||
| 461 | ||||||||||||
| 462 | ||||||||||||
| 463 | ||||||||||||
| 464 | ||||||||||||
| 465 | ||||||||||||
| 466 | ||||||||||||
| 467 | ||||||||||||
| 468 | ||||||||||||
| 469 | ||||||||||||
| 470 | ||||||||||||
| 471 | ||||||||||||
| 472 | ||||||||||||
| 473 | ||||||||||||
| 474 | ||||||||||||
| 475 | ||||||||||||
| 476 | ||||||||||||
| 477 | ||||||||||||
| 478 | ||||||||||||
| 479 | ||||||||||||
| 480 | ||||||||||||
| 481 | ||||||||||||
| 482 | ||||||||||||
| 483 | ||||||||||||
| 484 | ||||||||||||
| 485 | ||||||||||||
| 486 | ||||||||||||
| 487 | ||||||||||||
| 488 | ||||||||||||
| 489 | ||||||||||||
| 490 | ||||||||||||
| 491 | ||||||||||||
| 492 | ||||||||||||
| 493 | ||||||||||||
| 494 | ||||||||||||
| 495 | ||||||||||||
| 496 | ||||||||||||
| 497 | ||||||||||||
| 498 | ||||||||||||
| 499 | ||||||||||||
| 500 | ||||||||||||
| 501 | ||||||||||||
| 502 | ||||||||||||
| 503 | ||||||||||||
| 504 | ||||||||||||
| 505 | ||||||||||||
| 506 | ||||||||||||
| 507 | ||||||||||||
| 508 | ||||||||||||
| 509 | ||||||||||||
| 510 | ||||||||||||
| 511 | ||||||||||||
| 512 | ||||||||||||
| 513 | ||||||||||||
| 514 | ||||||||||||
| 515 | ||||||||||||
| 516 | ||||||||||||
| 517 | ||||||||||||
| 518 | ||||||||||||
| 519 | ||||||||||||
| 520 | ||||||||||||
| 521 | ||||||||||||
| 522 | ||||||||||||
| 523 | ||||||||||||
| 524 | ||||||||||||
| 525 | ||||||||||||
| 526 | ||||||||||||
| 527 | ||||||||||||
| 528 | ||||||||||||
| 529 | ||||||||||||
| 530 | ||||||||||||
| 531 | ||||||||||||
| 532 | ||||||||||||
| 533 | ||||||||||||
| 534 | ||||||||||||
| 535 | ||||||||||||
| 536 | ||||||||||||
| 537 | ||||||||||||
| 538 | ||||||||||||
| 539 | ||||||||||||
| 540 | ||||||||||||
| 541 | ||||||||||||
| 542 | ||||||||||||
| 543 | ||||||||||||
| 544 | ||||||||||||
| 545 | ||||||||||||
| 546 | ||||||||||||
| 547 | ||||||||||||
| 548 | ||||||||||||
| 549 | ||||||||||||
| 550 | ||||||||||||
| 551 | ||||||||||||
| 552 | ||||||||||||
| 553 | ||||||||||||
| 554 | ||||||||||||
| 555 | ||||||||||||
| 556 | ||||||||||||
| 557 | ||||||||||||
| 558 | ||||||||||||
| 559 | ||||||||||||
| 560 | ||||||||||||
| 561 | ||||||||||||
| 562 | ||||||||||||
| 563 | ||||||||||||
| 564 | ||||||||||||
| 565 | ||||||||||||
| 566 | ||||||||||||
| 567 | ||||||||||||
| 568 | ||||||||||||
| 569 | ||||||||||||
| 570 | ||||||||||||
| 571 | ||||||||||||
| 572 | ||||||||||||
| 573 | ||||||||||||
| 574 | ||||||||||||
| 575 | ||||||||||||
| 576 | ||||||||||||
| 577 | ||||||||||||
| 578 | ||||||||||||
| 579 | ||||||||||||
| 580 | ||||||||||||
| 581 | ||||||||||||
| 582 | ||||||||||||
| 583 | ||||||||||||
| 584 | ||||||||||||
| 585 | ||||||||||||
| 586 | ||||||||||||
| 587 | ||||||||||||
| 588 | ||||||||||||
| 589 | ||||||||||||
| 590 | ||||||||||||
| 591 | ||||||||||||
| 592 | ||||||||||||
| 593 | ||||||||||||
| 594 | ||||||||||||
| 595 | ||||||||||||
| 596 | ||||||||||||
| 597 | ||||||||||||
| 598 | ||||||||||||
| 599 | ||||||||||||
| 600 | ||||||||||||
| 601 | ||||||||||||
| 602 | ||||||||||||
| 603 | ||||||||||||
| 604 | ||||||||||||
| 605 | ||||||||||||
| 606 | ||||||||||||
| 607 | ||||||||||||
| 608 | ||||||||||||
| 609 | ||||||||||||
| 610 | ||||||||||||
| 611 | ||||||||||||
| 612 | ||||||||||||
| 613 | ||||||||||||
| 614 | ||||||||||||
| 615 | ||||||||||||
| 616 | ||||||||||||
| 617 | ||||||||||||
| 618 | ||||||||||||
| 619 | ||||||||||||
| 620 | ||||||||||||
| 621 | ||||||||||||
| 622 | ||||||||||||
| 623 | ||||||||||||
| 624 | ||||||||||||
| 625 | ||||||||||||
| 626 | ||||||||||||
| 627 | ||||||||||||
| 628 | ||||||||||||
| 629 | ||||||||||||
| 630 | ||||||||||||
| 631 | ||||||||||||
| 632 | ||||||||||||
| 633 | ||||||||||||
| 634 | ||||||||||||
| 635 | ||||||||||||
| 636 | ||||||||||||
| 637 | ||||||||||||
| 638 | ||||||||||||
| 639 | ||||||||||||
| 640 | ||||||||||||
| 641 | ||||||||||||
| 642 | ||||||||||||
| 643 | ||||||||||||
| 644 | ||||||||||||
| 645 | ||||||||||||
| 646 | ||||||||||||
| 647 | ||||||||||||
| 648 | ||||||||||||
| 649 | ||||||||||||
| 650 | ||||||||||||
| 651 | ||||||||||||
| 652 | ||||||||||||
| 653 | ||||||||||||
| 654 | ||||||||||||
| 655 | ||||||||||||
| 656 | ||||||||||||
| 657 | ||||||||||||
| 658 | ||||||||||||
| 659 | ||||||||||||
| 660 | ||||||||||||
| 661 | ||||||||||||
| 662 | ||||||||||||
| 663 | ||||||||||||
| 664 | ||||||||||||
| 665 | ||||||||||||
| 666 | ||||||||||||
| 667 | ||||||||||||
| 668 | ||||||||||||
| 669 | ||||||||||||
| 670 | ||||||||||||
| 671 | ||||||||||||
| 672 | ||||||||||||
| 673 | ||||||||||||
| 674 | ||||||||||||
| 675 | ||||||||||||
| 676 | ||||||||||||
| 677 | ||||||||||||
| 678 | ||||||||||||
| 679 | ||||||||||||
| 680 | ||||||||||||
| 681 | ||||||||||||
| 682 | ||||||||||||
| 683 | ||||||||||||
| 684 | ||||||||||||
| 685 | ||||||||||||
| 686 | ||||||||||||
| 687 | ||||||||||||
| 688 | ||||||||||||
| 689 | ||||||||||||
| 690 | ||||||||||||
| 691 | ||||||||||||
| 692 | ||||||||||||
| 693 | ||||||||||||
| 694 | ||||||||||||
| 695 | ||||||||||||
| 696 | ||||||||||||
| 697 | ||||||||||||
| 698 | ||||||||||||
| 699 | ||||||||||||
| 700 | ||||||||||||
| 701 | ||||||||||||
| 702 | ||||||||||||
| 703 | ||||||||||||
| 704 | ||||||||||||
| 705 | ||||||||||||
| 706 | ||||||||||||
| 707 | ||||||||||||
| 708 | ||||||||||||
| 709 | ||||||||||||
| 710 | ||||||||||||
| 711 | ||||||||||||
| 712 | ||||||||||||
| 713 | ||||||||||||
| 714 | ||||||||||||
| 715 | ||||||||||||
| 716 | ||||||||||||
| 717 | ||||||||||||
| 718 | ||||||||||||
| 719 | ||||||||||||
| 720 | ||||||||||||
| 721 | ||||||||||||
| 722 | ||||||||||||
| 723 | ||||||||||||
| 724 | ||||||||||||
| 725 | ||||||||||||
| 726 | ||||||||||||
| 727 | ||||||||||||
| 728 | ||||||||||||
| 729 | ||||||||||||
| 730 | ||||||||||||
| 731 | ||||||||||||
| 732 | ||||||||||||
| 733 | ||||||||||||
| 734 | ||||||||||||
| 735 | ||||||||||||
| 736 | ||||||||||||
| 737 | ||||||||||||
| 738 | ||||||||||||
| 739 | ||||||||||||
| 740 | ||||||||||||
| 741 | ||||||||||||
| 742 | ||||||||||||
| 743 | ||||||||||||
| 744 | ||||||||||||
| 745 | ||||||||||||
| 746 | ||||||||||||
| 747 | ||||||||||||
| 748 | ||||||||||||
| 749 | ||||||||||||
| 750 | ||||||||||||
| 751 | ||||||||||||
| 752 | ||||||||||||
| 753 | ||||||||||||
| 754 | ||||||||||||
| 755 | ||||||||||||
| 756 | ||||||||||||
| 757 | ||||||||||||
| 758 | ||||||||||||
| 759 | ||||||||||||
| 760 | ||||||||||||
| 761 | ||||||||||||
| 762 | ||||||||||||
| 763 | ||||||||||||
| 764 | ||||||||||||
| 765 | ||||||||||||
| 766 | ||||||||||||
| 767 | ||||||||||||
| 768 | ||||||||||||
| 769 | ||||||||||||
| 770 | ||||||||||||
| 771 | ||||||||||||
| 772 | ||||||||||||
| 773 | ||||||||||||
| 774 | ||||||||||||
| 775 | ||||||||||||
| 776 | ||||||||||||
| 777 | ||||||||||||
| 778 | ||||||||||||
| 779 | ||||||||||||
| 780 | ||||||||||||
| 781 | ||||||||||||
| 782 | ||||||||||||
| 783 | ||||||||||||
| 784 | ||||||||||||
| 785 | ||||||||||||
| 786 | ||||||||||||
| 787 | ||||||||||||
| 788 | ||||||||||||
| 789 | ||||||||||||
| 790 | ||||||||||||
| 791 | ||||||||||||
| 792 | ||||||||||||
| 793 | ||||||||||||
| 794 | ||||||||||||
| 795 | ||||||||||||
| 796 | ||||||||||||
| 797 | ||||||||||||
| 798 | ||||||||||||
| 799 | ||||||||||||
| 800 | ||||||||||||
| 801 | ||||||||||||
| 802 | ||||||||||||
| 803 | ||||||||||||
| 804 | ||||||||||||
| 805 | ||||||||||||
| 806 | ||||||||||||
| 807 | ||||||||||||
| 808 | ||||||||||||
| 809 | ||||||||||||
| 810 | ||||||||||||
| 811 | ||||||||||||
| 812 | ||||||||||||
| 813 | ||||||||||||
| 814 | ||||||||||||
| 815 | ||||||||||||
| 816 | ||||||||||||
| 817 | ||||||||||||
| 818 | ||||||||||||
| 819 | ||||||||||||
| 820 | ||||||||||||
| 821 | ||||||||||||
| 822 | ||||||||||||
| 823 | ||||||||||||
| 824 | ||||||||||||
| 825 | ||||||||||||
| 826 | ||||||||||||
| 827 | ||||||||||||
| 828 | ||||||||||||
| 829 | ||||||||||||
| 830 | ||||||||||||
| 831 | ||||||||||||
| 832 | ||||||||||||
| 833 | ||||||||||||
| 834 | ||||||||||||
| 835 | ||||||||||||
| 836 | ||||||||||||
| 837 | ||||||||||||
| 838 | ||||||||||||
| 839 | ||||||||||||
| 840 | ||||||||||||
| 841 | ||||||||||||
| 842 | ||||||||||||
| 843 | ||||||||||||
| 844 | ||||||||||||
| 845 | ||||||||||||
| 846 | ||||||||||||
| 847 | ||||||||||||
| 848 | ||||||||||||
| 849 | ||||||||||||
| 850 | ||||||||||||
| 851 | ||||||||||||
| 852 | ||||||||||||
| 853 | ||||||||||||
| 854 | ||||||||||||
| 855 | ||||||||||||
| 856 | ||||||||||||
| 857 | ||||||||||||
| 858 | ||||||||||||
| 859 | ||||||||||||
| 860 | ||||||||||||
| 861 | ||||||||||||
| 862 | ||||||||||||
| 863 | ||||||||||||
| 864 | ||||||||||||
| 865 | ||||||||||||
| 866 | ||||||||||||
| 867 | ||||||||||||
| 868 | ||||||||||||
| 869 | ||||||||||||
| 870 | ||||||||||||
| 871 | ||||||||||||
| 872 | ||||||||||||
| 873 | ||||||||||||
| 874 | ||||||||||||
| 875 | ||||||||||||
| 876 | ||||||||||||
| 877 | ||||||||||||
| 878 | ||||||||||||
| 879 | ||||||||||||
| 880 | ||||||||||||
| 881 | ||||||||||||
| 882 | ||||||||||||
| 883 | ||||||||||||
| 884 | ||||||||||||
| 885 | ||||||||||||
| 886 | ||||||||||||
| 887 | ||||||||||||
| 888 | ||||||||||||
| 889 | ||||||||||||
| 890 | ||||||||||||
| 891 | ||||||||||||
| 892 | ||||||||||||
| 893 | ||||||||||||
| 894 | ||||||||||||
| 895 | ||||||||||||
| 896 | ||||||||||||
| 897 | ||||||||||||
| 898 | ||||||||||||
| 899 | ||||||||||||
| 900 | ||||||||||||
| 901 | ||||||||||||
| 902 | ||||||||||||
| 903 | ||||||||||||
| 904 | ||||||||||||
| 905 | ||||||||||||
| 906 | ||||||||||||
| 907 | ||||||||||||
| 908 | ||||||||||||
| 909 | ||||||||||||
| 910 | ||||||||||||
| 911 | ||||||||||||
| 912 | ||||||||||||
| 913 | ||||||||||||
| 914 | ||||||||||||
| 915 | ||||||||||||
| 916 | ||||||||||||
| 917 | ||||||||||||
| 918 | ||||||||||||
| 919 | ||||||||||||
| 920 | ||||||||||||
| 921 | ||||||||||||
| 922 | ||||||||||||
| 923 | ||||||||||||
| 924 | ||||||||||||
| 925 | ||||||||||||
| 926 | ||||||||||||
| 927 | ||||||||||||
| 928 | ||||||||||||
| 929 | ||||||||||||
| 930 | ||||||||||||
| 931 | ||||||||||||
| 932 | ||||||||||||
| 933 | ||||||||||||
| 934 | ||||||||||||
| 935 | ||||||||||||
| 936 | ||||||||||||
| 937 | ||||||||||||
| 938 | ||||||||||||
| 939 | ||||||||||||
| 940 | ||||||||||||
| 941 | ||||||||||||
| 942 | ||||||||||||
| 943 | ||||||||||||
| 944 | ||||||||||||
| 945 | ||||||||||||
| 946 | ||||||||||||
| 947 | ||||||||||||
| 948 | ||||||||||||
| 949 | ||||||||||||
| 950 | ||||||||||||
| 951 | ||||||||||||
| 952 | ||||||||||||
| 953 | ||||||||||||
| 954 | ||||||||||||
| 955 | ||||||||||||
| 956 | ||||||||||||
| 957 | ||||||||||||
| 958 | ||||||||||||
| 959 | ||||||||||||
| 960 | ||||||||||||
| 961 | ||||||||||||
| 962 | ||||||||||||
| 963 | ||||||||||||
| 964 | ||||||||||||
| 965 | ||||||||||||
| 966 | ||||||||||||
| 967 | ||||||||||||
| 968 | ||||||||||||
| 969 | ||||||||||||
| 970 | ||||||||||||
| 971 | ||||||||||||
| 972 | ||||||||||||
| 973 | ||||||||||||
| 974 | ||||||||||||
| 975 | ||||||||||||
| 976 | ||||||||||||
| 977 | ||||||||||||
| 978 | ||||||||||||
| 979 | ||||||||||||
| 980 | ||||||||||||
| 981 | ||||||||||||
| 982 | ||||||||||||
| 983 | ||||||||||||
| 984 | ||||||||||||
| 985 | ||||||||||||
| 986 | ||||||||||||
| 987 | ||||||||||||
| 988 | ||||||||||||
| 989 | ||||||||||||
| 990 | ||||||||||||
| 991 | ||||||||||||
| 992 | ||||||||||||
| 993 | ||||||||||||
| 994 | ||||||||||||
| 995 | ||||||||||||
| 996 | ||||||||||||
| 997 | ||||||||||||
| 998 | ||||||||||||
| 999 | ||||||||||||
| 1000 | ||||||||||||
| 1001 | ||||||||||||
| 1002 | ||||||||||||
| 1003 | ||||||||||||
| 1004 | ||||||||||||
| 1005 | ||||||||||||
| 1006 | ||||||||||||
| 1007 | ||||||||||||
| 1008 | ||||||||||||
| 1009 | ||||||||||||
| 1010 | ||||||||||||
| 1011 | ||||||||||||
| 1012 | ||||||||||||
| 1013 | ||||||||||||
| 1014 | ||||||||||||
| 1015 | ||||||||||||
| 1016 | ||||||||||||
| 1017 | ||||||||||||
| 1018 | ||||||||||||
| 1019 | ||||||||||||
| 1020 | ||||||||||||
| 1021 | ||||||||||||
| 1022 | ||||||||||||
| 1023 | ||||||||||||
| 1024 | ||||||||||||
| 1025 | ||||||||||||
| 1026 | ||||||||||||
| 1027 | ||||||||||||
| 1028 | ||||||||||||
| 1029 | ||||||||||||
| 1030 | ||||||||||||
| 1031 | ||||||||||||
| 1032 | ||||||||||||
| 1033 | ||||||||||||
| 1034 | ||||||||||||
| 1035 | ||||||||||||
| 1036 | ||||||||||||
| 1037 | ||||||||||||
| 1038 | ||||||||||||
| 1039 | ||||||||||||
| 1040 | ||||||||||||
| 1041 | ||||||||||||
| 1042 | ||||||||||||
| 1043 | ||||||||||||
| 1044 | ||||||||||||
| 1045 | ||||||||||||
| 1046 | ||||||||||||
| 1047 | ||||||||||||
| 1048 | ||||||||||||
| 1049 | ||||||||||||
| 1050 | ||||||||||||
| 1051 | ||||||||||||
| 1052 | ||||||||||||
| 1053 | ||||||||||||
| 1054 | ||||||||||||
| 1055 | ||||||||||||
| 1056 | ||||||||||||
| 1057 | ||||||||||||
| 1058 | ||||||||||||
| 1059 | ||||||||||||
| 1060 | ||||||||||||
| 1061 | ||||||||||||
| 1062 | ||||||||||||
| 1063 | ||||||||||||
| 1064 | ||||||||||||
| 1065 | ||||||||||||
| 1066 | ||||||||||||
| 1067 | ||||||||||||
| 1068 | ||||||||||||
| 1069 | ||||||||||||
| 1070 | ||||||||||||
| 1071 | ||||||||||||
| 1072 | ||||||||||||
| 1073 | ||||||||||||
| 1074 | ||||||||||||
| 1075 | ||||||||||||
| 1076 | ||||||||||||
| 1077 | ||||||||||||
| 1078 | ||||||||||||
| 1079 | ||||||||||||
| 1080 | ||||||||||||
| 1081 | ||||||||||||
| 1082 | ||||||||||||
| 1083 | ||||||||||||
| 1084 | ||||||||||||
| 1085 | ||||||||||||
| 1086 | ||||||||||||
| 1087 | ||||||||||||
| 1088 | ||||||||||||
| 1089 | ||||||||||||
| 1090 | ||||||||||||
| 1091 | ||||||||||||
| 1092 | ||||||||||||
| 1093 | ||||||||||||
| 1094 | ||||||||||||
| 1095 | ||||||||||||
| 1096 | ||||||||||||
| 1097 | ||||||||||||
| 1098 | ||||||||||||
| 1099 | ||||||||||||
| 1100 | ||||||||||||
| 1101 | ||||||||||||
| 1102 | ||||||||||||
| 1103 | ||||||||||||
| 1104 | ||||||||||||
| 1105 | ||||||||||||
| 1106 | ||||||||||||
| 1107 | ||||||||||||
| 1108 | ||||||||||||
| 1109 | ||||||||||||
| 1110 | ||||||||||||
| 1111 | ||||||||||||
| 1112 | ||||||||||||
| 1113 | ||||||||||||
| 1114 | ||||||||||||
| 1115 | ||||||||||||
| 1116 | ||||||||||||
| 1117 | ||||||||||||
| 1118 | ||||||||||||
| 1119 | ||||||||||||
| 1120 | ||||||||||||
| 1121 | ||||||||||||
| 1122 | ||||||||||||
| 1123 | ||||||||||||
| 1124 | ||||||||||||
| 1125 | ||||||||||||
| 1126 | ||||||||||||
| 1127 | ||||||||||||
| 1128 | ||||||||||||
| 1129 | ||||||||||||
| 1130 | ||||||||||||
| 1131 | ||||||||||||
| 1132 | ||||||||||||
| 1133 | ||||||||||||
| 1134 | ||||||||||||
| 1135 | ||||||||||||
| 1136 | ||||||||||||
| 1137 | ||||||||||||
| 1138 | ||||||||||||
| 1139 | ||||||||||||
| 1140 | ||||||||||||
| 1141 | ||||||||||||
| 1142 | ||||||||||||
| 1143 | ||||||||||||
| 1144 | ||||||||||||
| 1145 | ||||||||||||
| 1146 | ||||||||||||
| 1147 | ||||||||||||
| 1148 | ||||||||||||
| 1149 | ||||||||||||
| 1150 | ||||||||||||
| 1151 | ||||||||||||
| 1152 | ||||||||||||
| 1153 | ||||||||||||
| 1154 | ||||||||||||
| 1155 | ||||||||||||
| 1156 | ||||||||||||
| 1157 | ||||||||||||
| 1158 | ||||||||||||
| 1159 | ||||||||||||
| 1160 | ||||||||||||
| 1161 | ||||||||||||
| 1162 | ||||||||||||
| 1163 | ||||||||||||
| 1164 | ||||||||||||
| 1165 | ||||||||||||
| 1166 | ||||||||||||
| 1167 | ||||||||||||
| 1168 | ||||||||||||
| 1169 | ||||||||||||
| 1170 | ||||||||||||
| 1171 | ||||||||||||
| 1172 | ||||||||||||
| 1173 | ||||||||||||
| 1174 | ||||||||||||
| 1175 | ||||||||||||
| 1176 | ||||||||||||
| 1177 | ||||||||||||
| 1178 | ||||||||||||
| 1179 | ||||||||||||
| 1180 | ||||||||||||
| 1181 | ||||||||||||
| 1182 | ||||||||||||
| 1183 | ||||||||||||
| 1184 | ||||||||||||
| 1185 | ||||||||||||
| 1186 | ||||||||||||
| 1187 | ||||||||||||
| 1188 | ||||||||||||
| 1189 | ||||||||||||
| 1190 | ||||||||||||
| 1191 | ||||||||||||
| 1192 | ||||||||||||
| 1193 | ||||||||||||
| 1194 | ||||||||||||
| 1195 | ||||||||||||
| 1196 | ||||||||||||
| 1197 | ||||||||||||
| 1198 | ||||||||||||
| 1199 | ||||||||||||
| 1200 | ||||||||||||
| 1201 | ||||||||||||
| 1202 | ||||||||||||
| 1203 | ||||||||||||
| 1204 | ||||||||||||
| 1205 | ||||||||||||
| 1206 | ||||||||||||
| 1207 | ||||||||||||
| 1208 | ||||||||||||
| 1209 | ||||||||||||
| 1210 | ||||||||||||
| 1211 | ||||||||||||
| 1212 | ||||||||||||
| 1213 | ||||||||||||
| 1214 | ||||||||||||
| 1215 | ||||||||||||
| 1216 | ||||||||||||
| 1217 | ||||||||||||
| 1218 | ||||||||||||
| 1219 | ||||||||||||
| 1220 | ||||||||||||
| 1221 | ||||||||||||
| 1222 | ||||||||||||
| 1223 | ||||||||||||
| 1224 | ||||||||||||
| 1225 | ||||||||||||
| 1226 | ||||||||||||
| 1227 | ||||||||||||
| 1228 | ||||||||||||
| 1229 | ||||||||||||
| 1230 | ||||||||||||
| 1231 | ||||||||||||
| 1232 | ||||||||||||
| 1233 | ||||||||||||
| 1234 | ||||||||||||
| 1235 | ||||||||||||
| 1236 | ||||||||||||
| 1237 | ||||||||||||
| 1238 | ||||||||||||
| 1239 | ||||||||||||
| 1240 | ||||||||||||
| 1241 | ||||||||||||
| 1242 | ||||||||||||
| 1243 | ||||||||||||
| 1244 | ||||||||||||
| 1245 | ||||||||||||
| 1246 | ||||||||||||
| 1247 | ||||||||||||
| 1248 | ||||||||||||
| 1249 | ||||||||||||
| 1250 | ||||||||||||
| 1251 | ||||||||||||
| 1252 | ||||||||||||
| 1253 | ||||||||||||
| 1254 | ||||||||||||
| 1255 | ||||||||||||
| 1256 | ||||||||||||
| 1257 | ||||||||||||
| 1258 | ||||||||||||
| 1259 | ||||||||||||
| 1260 | ||||||||||||
| 1261 | ||||||||||||
| 1262 | ||||||||||||
| 1263 | ||||||||||||
| 1264 | ||||||||||||
| 1265 | ||||||||||||
| 1266 | ||||||||||||
| 1267 | ||||||||||||
| 1268 | ||||||||||||
| 1269 | ||||||||||||
| 1270 | ||||||||||||
| 1271 | ||||||||||||
| 1272 | ||||||||||||
| 1273 | ||||||||||||
| 1274 | ||||||||||||
| 1275 | ||||||||||||
| 1276 | ||||||||||||
| 1277 | ||||||||||||
| 1278 | ||||||||||||
| 1279 | ||||||||||||
| 1280 | ||||||||||||
| 1281 | ||||||||||||
| 1282 | ||||||||||||
| 1283 | ||||||||||||
| 1284 | ||||||||||||
| 1285 | ||||||||||||
| 1286 | ||||||||||||
| 1287 | ||||||||||||
| 1288 | ||||||||||||
| 1289 | ||||||||||||
| 1290 | ||||||||||||
| 1291 | ||||||||||||
| 1292 | ||||||||||||
| 1293 | ||||||||||||
| 1294 | ||||||||||||
| 1295 | ||||||||||||
| 1296 | ||||||||||||
| 1297 | ||||||||||||
| 1298 | ||||||||||||
| 1299 | ||||||||||||
| 1300 | ||||||||||||
| 1301 | ||||||||||||
| 1302 | ||||||||||||
| 1303 | ||||||||||||
| 1304 | ||||||||||||
| 1305 | ||||||||||||
| 1306 | ||||||||||||
| 1307 | ||||||||||||
| 1308 | ||||||||||||
| 1309 | ||||||||||||
| 1310 | ||||||||||||
| 1311 | ||||||||||||
| 1312 | ||||||||||||
| 1313 | ||||||||||||
| 1314 | ||||||||||||
| 1315 | ||||||||||||
| 1316 | ||||||||||||
| 1317 | ||||||||||||
| 1318 | ||||||||||||
| 1319 | ||||||||||||
| 1320 | ||||||||||||
| 1321 | ||||||||||||
| 1322 | ||||||||||||
| 1323 | ||||||||||||
| 1324 | ||||||||||||
| 1325 | ||||||||||||
| 1326 | ||||||||||||
| 1327 | ||||||||||||
| 1328 | ||||||||||||
| 1329 | ||||||||||||
| 1330 | ||||||||||||
| 1331 | ||||||||||||
| 1332 | ||||||||||||
| 1333 | ||||||||||||
| 1334 | ||||||||||||
| 1335 | ||||||||||||
| 1336 | ||||||||||||
| 1337 | ||||||||||||
| 1338 | ||||||||||||
| 1339 | ||||||||||||
| 1340 | ||||||||||||
| 1341 | ||||||||||||
| 1342 | ||||||||||||
| 1343 | ||||||||||||
| 1344 | ||||||||||||
| 1345 | ||||||||||||
| 1346 | ||||||||||||
| 1347 | ||||||||||||
| 1348 | ||||||||||||
| 1349 | ||||||||||||
| 1350 | ||||||||||||
| 1351 | ||||||||||||
| 1352 | ||||||||||||
| 1353 | ||||||||||||
| 1354 | ||||||||||||
| 1355 | ||||||||||||
| 1356 | ||||||||||||
| 1357 | ||||||||||||
| 1358 | ||||||||||||
| 1359 | ||||||||||||
| 1360 | ||||||||||||
| 1361 | ||||||||||||
| 1362 | ||||||||||||
| 1363 | ||||||||||||
| 1364 | ||||||||||||
| 1365 | ||||||||||||
| 1366 | ||||||||||||
| 1367 | ||||||||||||
| 1368 | ||||||||||||
| 1369 | ||||||||||||
| 1370 | ||||||||||||
| 1371 | ||||||||||||
| 1372 | ||||||||||||
| 1373 | ||||||||||||
| 1374 | ||||||||||||
| 1375 | ||||||||||||
| 1376 | ||||||||||||
| 1377 | ||||||||||||
| 1378 | ||||||||||||
| 1379 | ||||||||||||
| 1380 | ||||||||||||
| 1381 | ||||||||||||
| 1382 | ||||||||||||
| 1383 | ||||||||||||
| 1384 | ||||||||||||
| 1385 | ||||||||||||
| 1386 | ||||||||||||
| 1387 | ||||||||||||
| 1388 | ||||||||||||
| 1389 | ||||||||||||
| 1390 | ||||||||||||
| 1391 | ||||||||||||
| 1392 | ||||||||||||
| 1393 | ||||||||||||
| 1394 | ||||||||||||
| 1395 | ||||||||||||
| 1396 | ||||||||||||
| 1397 | ||||||||||||
| 1398 | ||||||||||||
| 1399 | ||||||||||||
| 1400 | ||||||||||||
| 1401 | ||||||||||||
| 1402 | ||||||||||||
| 1403 | ||||||||||||
| 1404 | ||||||||||||
| 1405 | ||||||||||||
| 1406 | ||||||||||||
| 1407 | ||||||||||||
| 1408 | ||||||||||||
| 1409 | ||||||||||||
| 1410 | ||||||||||||
| 1411 | ||||||||||||
| 1412 | ||||||||||||
| 1413 | ||||||||||||
| 1414 | ||||||||||||
| 1415 | ||||||||||||
| 1416 | ||||||||||||
| 1417 | ||||||||||||
| 1418 | ||||||||||||
| 1419 | ||||||||||||
| 1420 | ||||||||||||
| 1421 | ||||||||||||
| 1422 | ||||||||||||
| 1423 | ||||||||||||
| 1424 | ||||||||||||
| 1425 | ||||||||||||
| 1426 | ||||||||||||
| 1427 | ||||||||||||
| 1428 | ||||||||||||
| 1429 | ||||||||||||
| 1430 | ||||||||||||
| 1431 | ||||||||||||
| 1432 | ||||||||||||
| 1433 | ||||||||||||
| 1434 | ||||||||||||
| 1435 | ||||||||||||
| 1436 | ||||||||||||
| 1437 | ||||||||||||
| 1438 | ||||||||||||
| 1439 | ||||||||||||
| 1440 | ||||||||||||
| 1441 | ||||||||||||
| 1442 | ||||||||||||
| 1443 | ||||||||||||
| 1444 | ||||||||||||
| 1445 | ||||||||||||
| 1446 | ||||||||||||
| 1447 | ||||||||||||
| 1448 | ||||||||||||
| 1449 | ||||||||||||
| 1450 | ||||||||||||
| 1451 | ||||||||||||
| 1452 | ||||||||||||
| 1453 | ||||||||||||
| 1454 | ||||||||||||
| 1455 | ||||||||||||
| 1456 | ||||||||||||
| 1457 | ||||||||||||
| 1458 | ||||||||||||
| 1459 | ||||||||||||
| 1460 | ||||||||||||
| 1461 | ||||||||||||
| 1462 | ||||||||||||
| 1463 | ||||||||||||
| 1464 | ||||||||||||
| 1465 | ||||||||||||
| 1466 | ||||||||||||
| 1467 | ||||||||||||
| 1468 | ||||||||||||
| 1469 | ||||||||||||
| 1470 | ||||||||||||
| 1471 | ||||||||||||
| 1472 | ||||||||||||
| 1473 | ||||||||||||
| 1474 | ||||||||||||
| 1475 | ||||||||||||
| 1476 | ||||||||||||
| 1477 | ||||||||||||
| 1478 | ||||||||||||
| 1479 | ||||||||||||
| 1480 | ||||||||||||
| 1481 | ||||||||||||
| 1482 | ||||||||||||
| 1483 | ||||||||||||
| 1484 | ||||||||||||
| 1485 | ||||||||||||
| 1486 | ||||||||||||
| 1487 | ||||||||||||
| 1488 | ||||||||||||
| 1489 | ||||||||||||
| 1490 | ||||||||||||
| 1491 | ||||||||||||
| 1492 | ||||||||||||
| 1493 | ||||||||||||
| 1494 | ||||||||||||
| 1495 | ||||||||||||
| 1496 | ||||||||||||
| 1497 | ||||||||||||
| 1498 | ||||||||||||
| 1499 | ||||||||||||
| 1500 | ||||||||||||
| 1501 | ||||||||||||
| 1502 | ||||||||||||
| 1503 | ||||||||||||
| 1504 | ||||||||||||
| 1505 | ||||||||||||
| 1506 | ||||||||||||
| 1507 | ||||||||||||
| 1508 | ||||||||||||
| 1509 | ||||||||||||
| 1510 | ||||||||||||
| 1511 | ||||||||||||
| 1512 | ||||||||||||
| 1513 | ||||||||||||
| 1514 | ||||||||||||
| 1515 | ||||||||||||
| 1516 | ||||||||||||
| 1517 | ||||||||||||
| 1518 | ||||||||||||
| 1519 | ||||||||||||
| 1520 | ||||||||||||
| 1521 | ||||||||||||
| 1522 | ||||||||||||
| 1523 | ||||||||||||
| 1524 | ||||||||||||
| 1525 | ||||||||||||
| 1526 | ||||||||||||
| 1527 | ||||||||||||
| 1528 | ||||||||||||
| 1529 | ||||||||||||
| 1530 | ||||||||||||
| 1531 | ||||||||||||
| 1532 | ||||||||||||
| 1533 | ||||||||||||
| 1534 | ||||||||||||
| 1535 | ||||||||||||
| 1536 | ||||||||||||
| 1537 | ||||||||||||
| 1538 | ||||||||||||
| 1539 | ||||||||||||
| 1540 | ||||||||||||
| 1541 | ||||||||||||
| 1542 | ||||||||||||
| 1543 | ||||||||||||
| 1544 | ||||||||||||
| 1545 | ||||||||||||
| 1546 | ||||||||||||
| 1547 | ||||||||||||
| 1548 | ||||||||||||
| 1549 | ||||||||||||
| 1550 | ||||||||||||
| 1551 | ||||||||||||
| 1552 | ||||||||||||
| 1553 | ||||||||||||
| 1554 | ||||||||||||
| 1555 | ||||||||||||
| 1556 | ||||||||||||
| 1557 | ||||||||||||
| 1558 | ||||||||||||
| 1559 | ||||||||||||
| 1560 | ||||||||||||
| 1561 | ||||||||||||
| 1562 | ||||||||||||
| 1563 | ||||||||||||
| 1564 | ||||||||||||
| 1565 | ||||||||||||
| 1566 | ||||||||||||
| 1567 | ||||||||||||
| 1568 | ||||||||||||
| 1569 | ||||||||||||
| 1570 | ||||||||||||
| 1571 | ||||||||||||
| 1572 | ||||||||||||
| 1573 | ||||||||||||
| 1574 | ||||||||||||
| 1575 | ||||||||||||
| 1576 | ||||||||||||
| 1577 | ||||||||||||
| 1578 | ||||||||||||
| 1579 | ||||||||||||
| 1580 | ||||||||||||
| 1581 | ||||||||||||
| 1582 | ||||||||||||
| 1583 | ||||||||||||
| 1584 | ||||||||||||
| 1585 | ||||||||||||
| 1586 | ||||||||||||
| 1587 | ||||||||||||
| 1588 | ||||||||||||
| 1589 | ||||||||||||
| 1590 | ||||||||||||
| 1591 | ||||||||||||
| 1592 | ||||||||||||
| 1593 | ||||||||||||
| 1594 | ||||||||||||
| 1595 | ||||||||||||
| 1596 | ||||||||||||
| 1597 | ||||||||||||
| 1598 | ||||||||||||
| 1599 | ||||||||||||
| 1600 | ||||||||||||
| 1601 | ||||||||||||
| 1602 | ||||||||||||
| 1603 | ||||||||||||
| 1604 | ||||||||||||
| 1605 | ||||||||||||
| 1606 | ||||||||||||
| 1607 | ||||||||||||
| 1608 | ||||||||||||
| 1609 | ||||||||||||
| 1610 | ||||||||||||
| 1611 | ||||||||||||
| 1612 | ||||||||||||
| 1613 | ||||||||||||
| 1614 | ||||||||||||
| 1615 | ||||||||||||
| 1616 | ||||||||||||
| 1617 | ||||||||||||
| 1618 | ||||||||||||
| 1619 | ||||||||||||
| 1620 | ||||||||||||
| 1621 | ||||||||||||
| 1622 | ||||||||||||
| 1623 | ||||||||||||
| 1624 | ||||||||||||
| 1625 | ||||||||||||
| 1626 | ||||||||||||
| 1627 | ||||||||||||
| 1628 | ||||||||||||
| 1629 | ||||||||||||
| 1630 | ||||||||||||
| 1631 | ||||||||||||
| 1632 | ||||||||||||
| 1633 | ||||||||||||
| 1634 | ||||||||||||
| 1635 | ||||||||||||
| 1636 | ||||||||||||
| 1637 | ||||||||||||
| 1638 | ||||||||||||
| 1639 | ||||||||||||
| 1640 | ||||||||||||
| 1641 | ||||||||||||
| 1642 | ||||||||||||
| 1643 | ||||||||||||
| 1644 | ||||||||||||
| 1645 | ||||||||||||
| 1646 | ||||||||||||
| 1647 | ||||||||||||
| 1648 | ||||||||||||
| 1649 | ||||||||||||
| 1650 | ||||||||||||
| 1651 | ||||||||||||
| 1652 | ||||||||||||
| 1653 | ||||||||||||
| 1654 | ||||||||||||
| 1655 | ||||||||||||
| 1656 | ||||||||||||
| 1657 | ||||||||||||
| 1658 | ||||||||||||
| 1659 | ||||||||||||
| 1660 | ||||||||||||
| 1661 | ||||||||||||
| 1662 | ||||||||||||
| 1663 | ||||||||||||
| 1664 | ||||||||||||
| 1665 | ||||||||||||
| 1666 | ||||||||||||
| 1667 | ||||||||||||
| 1668 | ||||||||||||
| 1669 | ||||||||||||
| 1670 | ||||||||||||
| 1671 | ||||||||||||
| 1672 | ||||||||||||
| 1673 | ||||||||||||
| 1674 | ||||||||||||
| 1675 | ||||||||||||
| 1676 | ||||||||||||
| 1677 | ||||||||||||
| 1678 | ||||||||||||
| 1679 | ||||||||||||
| 1680 | ||||||||||||
| 1681 | ||||||||||||
| 1682 | ||||||||||||
| 1683 | ||||||||||||
| 1684 | ||||||||||||
| 1685 | ||||||||||||
| 1686 | ||||||||||||
| 1687 | ||||||||||||
| 1688 | ||||||||||||
| 1689 | ||||||||||||
| 1690 | ||||||||||||
| 1691 | ||||||||||||
| 1692 | ||||||||||||
| 1693 | ||||||||||||
| 1694 | ||||||||||||
| 1695 | ||||||||||||
| 1696 | ||||||||||||
| 1697 | ||||||||||||
| 1698 | ||||||||||||
| 1699 | ||||||||||||
| 1700 | ||||||||||||
| 1701 | ||||||||||||
| 1702 | ||||||||||||
| 1703 | ||||||||||||
| 1704 | ||||||||||||
| 1705 | ||||||||||||
| 1706 | ||||||||||||
| 1707 | ||||||||||||
| 1708 | ||||||||||||
| 1709 | ||||||||||||
| 1710 | ||||||||||||
| 1711 | ||||||||||||
| 1712 | ||||||||||||
| 1713 | ||||||||||||
| 1714 | ||||||||||||
| 1715 | ||||||||||||
| 1716 | ||||||||||||
| 1717 | ||||||||||||
| 1718 | ||||||||||||
| 1719 | ||||||||||||
| 1720 | ||||||||||||
| 1721 | ||||||||||||
| 1722 | ||||||||||||
| 1723 | ||||||||||||
| 1724 | ||||||||||||
| 1725 | ||||||||||||
| 1726 | ||||||||||||
| 1727 | ||||||||||||
| 1728 | ||||||||||||
| 1729 | ||||||||||||
| 1730 | ||||||||||||
| 1731 | ||||||||||||
| 1732 | ||||||||||||
| 1733 | ||||||||||||
| 1734 | ||||||||||||
| 1735 | ||||||||||||
| 1736 | ||||||||||||
| 1737 | ||||||||||||
| 1738 | ||||||||||||
| 1739 | ||||||||||||
| 1740 | ||||||||||||
| 1741 | ||||||||||||
| 1742 | ||||||||||||
| 1743 | ||||||||||||
| 1744 | ||||||||||||
| 1745 | ||||||||||||
| 1746 | ||||||||||||
| 1747 | ||||||||||||
| 1748 | ||||||||||||
| 1749 | ||||||||||||
| 1750 | ||||||||||||
| 1751 | ||||||||||||
| 1752 | ||||||||||||
| 1753 | ||||||||||||
| 1754 | ||||||||||||
| 1755 | ||||||||||||
| 1756 | ||||||||||||
| 1757 | ||||||||||||
| 1758 | ||||||||||||
| 1759 | ||||||||||||
| 1760 | ||||||||||||
| 1761 | ||||||||||||
| 1762 | ||||||||||||
| 1763 | ||||||||||||
| 1764 | ||||||||||||
| 1765 | ||||||||||||
| 1766 | ||||||||||||
| 1767 | ||||||||||||
| 1768 | ||||||||||||
| 1769 | ||||||||||||
| 1770 | ||||||||||||
| 1771 | ||||||||||||
| 1772 | ||||||||||||
| 1773 | ||||||||||||
| 1774 | ||||||||||||
| 1775 | ||||||||||||
| 1776 | ||||||||||||
| 1777 | ||||||||||||
| 1778 | ||||||||||||
| 1779 | ||||||||||||
| 1780 | ||||||||||||
| 1781 | ||||||||||||
| 1782 | ||||||||||||
| 1783 | ||||||||||||
| 1784 | ||||||||||||
| 1785 | ||||||||||||
| 1786 | ||||||||||||
| 1787 | ||||||||||||
| 1788 | ||||||||||||
| 1789 | ||||||||||||
| 1790 | ||||||||||||
| 1791 | ||||||||||||
| 1792 | ||||||||||||
| 1793 | ||||||||||||
| 1794 | ||||||||||||
| 1795 | ||||||||||||
| 1796 | ||||||||||||
| 1797 | ||||||||||||
| 1798 | ||||||||||||
| 1799 | ||||||||||||
| 1800 | ||||||||||||
| 1801 | ||||||||||||
| 1802 | ||||||||||||
| 1803 | ||||||||||||
| 1804 | ||||||||||||
| 1805 | ||||||||||||
| 1806 | ||||||||||||
| 1807 | ||||||||||||
| 1808 | ||||||||||||
| 1809 | ||||||||||||
| 1810 | ||||||||||||
| 1811 | ||||||||||||
| 1812 | ||||||||||||
| 1813 | ||||||||||||
| 1814 | ||||||||||||
| 1815 | ||||||||||||
| 1816 | ||||||||||||
| 1817 | ||||||||||||
| 1818 | ||||||||||||
| 1819 | ||||||||||||
| 1820 | ||||||||||||
| 1821 | ||||||||||||
| 1822 | ||||||||||||
| 1823 | ||||||||||||
| 1824 | ||||||||||||
| 1825 | ||||||||||||
| 1826 | ||||||||||||
| 1827 | ||||||||||||
| 1828 | ||||||||||||
| 1829 | ||||||||||||
| 1830 | ||||||||||||
| 1831 | ||||||||||||
| 1832 | ||||||||||||
| 1833 | ||||||||||||
| 1834 | ||||||||||||
| 1835 | ||||||||||||
| 1836 | ||||||||||||
| 1837 | ||||||||||||
| 1838 | ||||||||||||
| 1839 | ||||||||||||
| 1840 | ||||||||||||
| 1841 | ||||||||||||
| 1842 | ||||||||||||
| 1843 | ||||||||||||
| 1844 | ||||||||||||
| 1845 | ||||||||||||
| 1846 | ||||||||||||
| 1847 | ||||||||||||
| 1848 | ||||||||||||
| 1849 | ||||||||||||
| 1850 | ||||||||||||
| 1851 | ||||||||||||
| 1852 | ||||||||||||
| 1853 | ||||||||||||
| 1854 | ||||||||||||
| 1855 | ||||||||||||
| 1856 | ||||||||||||
| 1857 | ||||||||||||
| 1858 | ||||||||||||
| 1859 | ||||||||||||
| 1860 | ||||||||||||
| 1861 | ||||||||||||
| 1862 | ||||||||||||
| 1863 | ||||||||||||
| 1864 | ||||||||||||
| 1865 | ||||||||||||
| 1866 | ||||||||||||
| 1867 | ||||||||||||
| 1868 | ||||||||||||
| 1869 | ||||||||||||
| 1870 | ||||||||||||
| 1871 | ||||||||||||
| 1872 | ||||||||||||
| 1873 | ||||||||||||
| 1874 | ||||||||||||
| 1875 | ||||||||||||
| 1876 | ||||||||||||
| 1877 | ||||||||||||
| 1878 | ||||||||||||
| 1879 | ||||||||||||
| 1880 | ||||||||||||
| 1881 | ||||||||||||
| 1882 | ||||||||||||
| 1883 | ||||||||||||
| 1884 | ||||||||||||
| 1885 | ||||||||||||
| 1886 | ||||||||||||
| 1887 | ||||||||||||
| 1888 | ||||||||||||
| 1889 | ||||||||||||
| 1890 | ||||||||||||
| 1891 | ||||||||||||
| 1892 | ||||||||||||
| 1893 | ||||||||||||
| 1894 | ||||||||||||
| 1895 | ||||||||||||
| 1896 | ||||||||||||
| 1897 | ||||||||||||
| 1898 | ||||||||||||
| 1899 | ||||||||||||
| 1900 | ||||||||||||
| 1901 | ||||||||||||
| 1902 | ||||||||||||
| 1903 | ||||||||||||
| 1904 | ||||||||||||
| 1905 | ||||||||||||
| 1906 | ||||||||||||
| 1907 | ||||||||||||
| 1908 | ||||||||||||
| 1909 | ||||||||||||
| 1910 | ||||||||||||
| 1911 | ||||||||||||
| 1912 | ||||||||||||
| 1913 | ||||||||||||
| 1914 | ||||||||||||
| 1915 | ||||||||||||
| 1916 | ||||||||||||
| 1917 | ||||||||||||
| 1918 | ||||||||||||
| 1919 | ||||||||||||
| 1920 | ||||||||||||
| 1921 | ||||||||||||
| 1922 | ||||||||||||
| 1923 | ||||||||||||
| 1924 | ||||||||||||
| 1925 | ||||||||||||
| 1926 | ||||||||||||
| 1927 | ||||||||||||
| 1928 | ||||||||||||
| 1929 | ||||||||||||
| 1930 | ||||||||||||
| 1931 | ||||||||||||
| 1932 | ||||||||||||
| 1933 | ||||||||||||
| 1934 | ||||||||||||
| 1935 | ||||||||||||
| 1936 | ||||||||||||
| 1937 | ||||||||||||
| 1938 | ||||||||||||
| 1939 | ||||||||||||
| 1940 | ||||||||||||
| 1941 | ||||||||||||
| 1942 | ||||||||||||
| 1943 | ||||||||||||
| 1944 | ||||||||||||
| 1945 | ||||||||||||
| 1946 | ||||||||||||
| 1947 | ||||||||||||
| 1948 | ||||||||||||
| 1949 | ||||||||||||
| 1950 | ||||||||||||
| 1951 | ||||||||||||
| 1952 | ||||||||||||
| 1953 | ||||||||||||
| 1954 | ||||||||||||
| 1955 | ||||||||||||
| 1956 | ||||||||||||
| 1957 | ||||||||||||
| 1958 | ||||||||||||
| 1959 | ||||||||||||
| 1960 | ||||||||||||
| 1961 | ||||||||||||
| 1962 | ||||||||||||
| 1963 | ||||||||||||
| 1964 | ||||||||||||
| 1965 | ||||||||||||
| 1966 | ||||||||||||
| 1967 | ||||||||||||
| 1968 | ||||||||||||
| 1969 | ||||||||||||
| 1970 | ||||||||||||
| 1971 | ||||||||||||
| 1972 | ||||||||||||
| 1973 | ||||||||||||
| 1974 | ||||||||||||
| 1975 | ||||||||||||
| 1976 | ||||||||||||
| 1977 | ||||||||||||
| 1978 | ||||||||||||
| 1979 | ||||||||||||
| 1980 | ||||||||||||
| 1981 | ||||||||||||
| 1982 | ||||||||||||
| 1983 | ||||||||||||
| 1984 | ||||||||||||
| 1985 | ||||||||||||
| 1986 | ||||||||||||
| 1987 | ||||||||||||
| 1988 | ||||||||||||
| 1989 | ||||||||||||
| 1990 | ||||||||||||
| 1991 | ||||||||||||
| 1992 | ||||||||||||
| 1993 | ||||||||||||
| 1994 | ||||||||||||
| 1995 | ||||||||||||
| 1996 | ||||||||||||
| 1997 | ||||||||||||
| 1998 | ||||||||||||
| 1999 | ||||||||||||
| 2000 | ||||||||||||
| 2001 | ||||||||||||
| 2002 | ||||||||||||
| 2003 | ||||||||||||
| 2004 | ||||||||||||
| 2005 | ||||||||||||
| 2006 | ||||||||||||
| 2007 | ||||||||||||
| 2008 | ||||||||||||
| 2009 | ||||||||||||
| 2010 | ||||||||||||
| 2011 | ||||||||||||
| 2012 | ||||||||||||
| 2013 | ||||||||||||
| 2014 | ||||||||||||
| 2015 | ||||||||||||
| 2016 | ||||||||||||
| 2017 | ||||||||||||
| 2018 | ||||||||||||
| 2019 | ||||||||||||
| 2020 | ||||||||||||
| 2021 | ||||||||||||
| 2022 | ||||||||||||
| 2023 | ||||||||||||
| 2024 | ||||||||||||
| 1 | TotalDistributionSubstationMember |
|||||||||||
| 2 | TotalGenerationSubstationMember |
|||||||||||
| 3 | TotalTransmissionSubstationMember |
|||||||||||
| 4 | Total |
|||||||||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
TRANSACTIONS WITH ASSOCIATED (AFFILIATED) COMPANIES |
||||
|
||||
| Line No. |
Description of the Good or Service (a) |
Name of Associated/Affiliated Company (b) |
Account(s) Charged or Credited (c) |
Amount Charged or Credited (d) |
| 1 |
Non-power Goods or Services Provided by Affiliated |
|||
| 2 | (a) |
(c) |
||
| 3 | (d) |
|||
| 4 | (e) |
|||
| 5 | (f) |
|||
| 6 | (b) |
|||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | (g) |
|||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | (h) |
|||
| 16 | ||||
| 19 | ||||
| 20 |
Non-power Goods or Services Provided for Affiliated |
|||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | (i) |
|||
| 42 | ||||
|
Name of Respondent: |
This report is: (1) ☑ An Original (2) ☐ A Resubmission |
Date of Report: |
Year/Period of Report End of: |
| FOOTNOTE DATA |
| (a) Concept: NameOfAssociatedAffiliatedCompany |
Southern Company Services
Southern Company Services, Inc. uses multiple allocation methodologies to allocate costs. These methodologies are designed to properly allocate cost on a causative basis and to prevent cross-subsidization among affiliated and non-affiliated companies. See Southern Company Services FERC Form 60 Schedule XXI for additional information. This note applies to Line Nos. 2, 3, 4, and 5 on page 429.
|
| (b) Concept: NameOfAssociatedAffiliatedCompany |
Southern Nuclear Operating Company
Georgia Power Company (GPC) is billed direct and allocated costs by Southern Nuclear Operating Company Inc. (SNC). For the period of January through July 2023, SNC allocated costs to GPC using the Plant Basis Method. The Plant Basis Method of allocation is the factor determined by dividing one plant by total number of plants. GPC received 2/3 of SNC allocated costs since GPC owned two and Alabama Power Company (APC) owned one of the three plants operated by SNC during this period. Effective August 2023, SNC allocates costs to GPC using the Unit Basis Method. The Unit Basis Method of allocation is the factor determined by dividing one unit by the total number of units. GPC receives 3/5 of SNC allocated costs since GPC owns three and APC owns two of the five units operated by SNC. This note applies to Line Nos. 6, 7, 8, 9, and 10 on page 429.
|
| (c) Concept: AccountsChargedOrCreditedTransactionsWithAssociatedAffiliatedCompanies |
Accounting, Finance & Treasury
174,416,501,506,547,561,562,568,901,903,905,921,923,928,930,421.1,421.2,408.2,426.5
|
| (d) Concept: AccountsChargedOrCreditedTransactionsWithAssociatedAffiliatedCompanies |
Administrative and General Services
107,154,163,165,174,181,183,184,186,232,404,415,416,417,418,456,457,500,506,509,537,539,547,
549,555,557,560,561,562,566,568,569,570,571,573,580,581,582,584,586,587,588,590,592,593,594,596,597,
901,902,903,905,908,910,911,912,913,916,920,921,923,924,925,926,930,931,935,182.3,408.1,418.1,421.2,
426.4,408.2,426.1,426.5
|
| (e) Concept: AccountsChargedOrCreditedTransactionsWithAssociatedAffiliatedCompanies |
Information Technology
107,108,184,232,403,506,524,553,566,586,587,588,590,597,902,903,908,912,921,923,930, 935,182.3,421.2
|
| (f) Concept: AccountsChargedOrCreditedTransactionsWithAssociatedAffiliatedCompanies |
Power Delivery Support Services
107,108,165,183,184,186,404,412,416,431,500,501,502,505,506,510,511,512,513,514,517,519,520,524,525,
528,529,530,531,532,535,538,539,542,543,544,545,546,547,548,549,551,552,553,554,555,556,557,560,561,
562, 566,568,569,570,571,580,581,582,588,590,591,592,593,908,921,923,930,935,182.3,120.1,426.1,426.5
|
| (g) Concept: DueToOrChargedByTheTransactionsWithAssociatedAffiliatedCompanies |
APC is reporting $1,984,358 for Storm Assistance and GPC is reporting $2,097,743. The difference is due to timing.
|
| (h) Concept: DueToOrChargedByTheTransactionsWithAssociatedAffiliatedCompanies |
Mississippi Power Company is reporting $621,448 for PPE Testing and GPC is reporting $644,039. The difference is due to the timing of invoicing and payments.
|
| (i) Concept: DueFromOrCreditedByTheTransactionsWithAssociatedAffiliatedCompanies |